130th station
130th 13000S 1100E | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chicago 'L' rapid transit station | |||||||||||
Owned by | Chicago Transit Authority | ||||||||||
Line(s) | Dan Ryan branch | ||||||||||
Platforms | |||||||||||
Tracks | 3[1][2] | ||||||||||
Construction | |||||||||||
Structure type | At-grade[3] | ||||||||||
History | |||||||||||
Opened | 2029 (planned)[4] | ||||||||||
Proposed services | |||||||||||
|
130th[5][6] is a proposed rapid transit station for the Red Line as part of the Red Line Extension. The station is planned to open in 2029[7] if the CTA can get the funding for the $2.3 billion project. The station will be constructed in Chicago's Riverdale neighborhood.
References[]
- ^ CWC Transit Group (July 29, 2015). Description of Alternatives - Chicago Red Line Extension Project (PDF) (Report). Archived (PDF) from the original on 2020-08-10. Retrieved 2020-08-10.
- ^ "Residents call for grocery store, environmental upgrades near future 130th Street 'L' station". January 29, 2021.
- ^ "Red Line Extension: Locally Preferred Alternative" (PDF). Chicago Transit Authority. Archived from the original (PDF) on 2012-06-16. Retrieved September 12, 2012.
- ^ "CTA's Red Line Extension Project Receives Approval to Enter Project Development Phase from the Federal Transit Administration". CTA.
- ^ "CTA Red Line Extension". Chicago Transit Authority. Archived from the original on December 24, 2020. Retrieved September 5, 2012.
- ^ Koziarz, Jay (January 26, 2018). "CTA reveals route, four new stations for Far South Side Red Line extension". Curbed Chicago. Vox Media. Archived from the original on February 13, 2020. Retrieved 4 November 2018.
- ^ "CTA Wins Federal Approval for Next Phase of Red Line Extension; Construction Could Start in 2025". WTTW News. 2020-12-21.
External links[]
Categories:
- CTA Red Line stations
- Chicago "L" terminal stations
- Railway stations scheduled to open in 2029
- Proposed Chicago "L" stations
- Chicago Transit Authority stubs