96th Street station (IRT Broadway–Seventh Avenue Line)

From Wikipedia, the free encyclopedia

 96 Street
 "1" train"2" train"3" train
MTA NYC logo.svg New York City Subway station (rapid transit)
96th Street IRT Broadway 1.JPG
Uptown island platform
Station statistics
AddressWest 96th Street & Broadway
New York, NY 10025
BoroughManhattan
LocaleUpper West Side
Coordinates40°47′39″N 73°58′19″W / 40.7941°N 73.972°W / 40.7941; -73.972Coordinates: 40°47′39″N 73°58′19″W / 40.7941°N 73.972°W / 40.7941; -73.972
DivisionA (IRT)[1]
Line   IRT Broadway–Seventh Avenue Line
Services   1 all times (all times)
   2 all times (all times)
   3 all times (all times)
TransitBus transport NYCT Bus: M96, M104, M106
Bus transport Columbia Transportation: Intercampus Shuttles
StructureUnderground
Platforms2 island platforms (in service)
cross-platform interchange
2 side platforms (abandoned)
Tracks4
Other information
OpenedOctober 27, 1904; 116 years ago (1904-10-27)[2]
Station code310[3]
AccessibleThis station is compliant with the Americans with Disabilities Act of 1990 ADA-accessible
Opposite-
direction
transfer
Yes
Traffic
201911,628,887[5]Decrease 0.6%
Rank25 out of 424[5]
Station succession
Next north157th Street (Broadway–7th express): no regular service
Central Park North–110th Street (Lenox): 2 all times3 all times
103rd Street (Broadway–7th local): 1 all times
Next south91st Street (local; closed): no service
86th Street (local): 1 all times2 late nights
72nd Street (express): 2 all except late nights3 all times
Location
96th Street station (IRT Broadway–Seventh Avenue Line) is located in New York City Subway
96th Street station (IRT Broadway–Seventh Avenue Line)
Track layout

Legend
Upper level
Lower level
Street map

Station service legend
Symbol Description
Stops all times except late nights Stops all times except late nights
Stops all times Stops all times
Stops late nights only Stops late nights only

96th Street is an express station on the IRT Broadway–Seventh Avenue Line of the New York City Subway. Located at the intersection of 96th Street and Broadway on the Upper West Side of Manhattan, it is served by the 1, 2, and 3 trains at all times.

The 96th Street station was constructed for the Interborough Rapid Transit Company (IRT) as part of the city's first subway line, which was approved in 1900. Construction of the line segment that includes the 96th Street station started on August 22 of the same year. The station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway. The 96th Street station's platforms were lengthened in 1960 as part of an improvement project along the Broadway–Seventh Avenue Line. A new head house and elevators were constructed between 2007 and 2010.

The 96th Street station contains two island platforms, two unused side platforms, and four tracks. The outer tracks are used by local trains while the inner two tracks are used by express trains. The station contains two sets of exits: a head house at the northern end, in the median of Broadway at 96th Street, as well as staircases at Broadway and 94th Street. The head house contains elevators, which make the station compliant with the Americans with Disabilities Act of 1990.

History[]

Construction and opening[]

Planning for a subway line in New York City dates to 1864.[6]: 21 However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature authorized the Rapid Transit Act.[6]: 139–140 The subway plans were drawn up by a team of engineers led by William Barclay Parsons, chief engineer of the Rapid Transit Commission. It called for a subway line from New York City Hall in lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[7]: 3 A plan was formally adopted in 1897,[6]: 148 and all legal conflicts concerning the route alignment were resolved near the end of 1899.[6]: 161

The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[8] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[6]: 165 In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[7]: 4 Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[6]: 182

The 96th Street station was constructed as part of the IRT's West Side Line (now the Broadway–Seventh Avenue Line) from 82nd Street to 104th Street, for which work had begun on August 22, 1900. Work for that section had been awarded to William Bradley.[8] The 96th Street station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway from City Hall to 145th Street on the West Side Branch.[6]: 186[2]

Service changes and station renovations[]

Early 20th century[]

When the station opened, the station served as the terminus of local trains; express trains would run as locals north to 145th Street.[9] After the first subway line was completed in 1908,[10] the station was served by local and express trains along both the West Side (now the Broadway–Seventh Avenue Line to Van Cortlandt Park–242nd Street) and East Side (now the Lenox Avenue Line). West Side local trains had their southern terminus at City Hall during rush hours and South Ferry at other times, and had their northern terminus at 242nd Street. East Side local trains ran from City Hall to Lenox Avenue (145th Street). Express trains had their southern terminus at South Ferry or Atlantic Avenue and had their northern terminus at 242nd Street, Lenox Avenue (145th Street), or West Farms (180th Street).[11] Express trains to 145th Street were later eliminated, and West Farms express trains and rush-hour Broadway express trains operated through to Brooklyn.[12]

On June 27, 1907, a modification called the 96th Street Improvement was made to Contract 1 to add additional tracks at 96th Street in order to remove the at-grade junction north of the 96th Street station. Here, trains from Lenox Avenue and Broadway would switch to get to the express or local tracks and would delay service.[13] The new tracks would have been constructed with the necessary fly-under tracks and switches.[14]: 14 The work was partially completed in 1908, but was stopped because the introduction of speed-control signals made the remainder of the project unnecessary. Provisions were left to allow the work to be completed later on. The signals were put into place at 96th Street on April 23, 1909. The new signals allowed trains approaching a station to run more closely to the stopped train, eliminating the need to be separated by hundreds of feet.[15]: 85–87, 191

To address overcrowding, in 1909, the New York Public Service Commission proposed lengthening platforms at stations along the original IRT subway.[16]: 168 As part of a modification to the IRT's construction contracts, made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $41.7 million in 2020) spent on platform lengthening, $500,000 (equivalent to $13,888,000 in 2020) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[17]: 15 At the 96th Street station, the northbound island platform was extended 100 feet (30 m) south, while the southbound island platform was extended 135 feet (41 m) south, necessitating the replacement of some structural steel girders.[17]: 111 On January 23, 1911, ten-car express trains began running on the Lenox Avenue Line, and the following day, ten-car express trains were inaugurated on the West Side Line.[16]: 168[18]

View of entrance at 94th Street

In 1915, the IRT considered constructing a new mezzanine and entrance at the southern end of the station leading to the central mall of Broadway at 94th Street, with an estimated cost of $60,000.[19] The additional entrance would have reduced congestion at the station, and reduce travel times for people south of 94th Street. In addition, two additional staircases would have been constructed to each island platform.[20] Plans were prepared in 1923. Though the IRT sent a proposed agreement for the construction of the entrance to the New York City Board of Estimate, the Board of Estimate suggested that staircases be constructed on the sidewalk. The IRT decided not to pursue this option since it would cost twice as much, or $100,000, and decided not to construct a new entrance at the southern end of the station at the time.[21] In 1918, the Broadway–Seventh Avenue Line opened south of Times Square–42nd Street, thereby dividing the original line into an "H"-shaped system. The original subway north of Times Square thus became part of the Broadway–Seventh Avenue Line. Local trains (Broadway and Lenox Avenue) were sent to South Ferry, while express trains (Broadway and West Farms) used the new Clark Street Tunnel to Brooklyn.[22]

Mid- and late 20th century[]

Former Uptown control area on the closed side platform

The IRT routes were given numbered designations with the introduction of "R-type" rolling stock, which contained rollsigns with numbered designations for each service. The first such fleet, the R12, was put into service in 1948.[23] The Broadway route to 242nd Street became known as the 1, the White Plains Road (formerly West Farms) route as the 2, and the Lenox Avenue route as the 3.[24]

On June 14, 1956, the New York City Transit Authority announced a $100 million (equivalent to $951.9 million) project to modernize the IRT Broadway—Seventh Avenue Line and improve service. It was estimated that the project would be completed in 2.5 years.[25] In 1957, work began to lengthen station platforms between Times Square and 96th Street, with the exception of 91st Street, to 525 feet (160 m) to accommodate ten-car trains. Originally, stations north of Times Squares could barely fit local trains of five or six cars depending on the configuration of the trains. In 1960, work was completed on improvements at the 96th Street station, including the installation of fluorescent lighting, and the extension of the platforms.[26][27][28] To make room for the platform extensions, the local tracks and the outside walls had to be moved. A new mezzanine with stairways to the street, and direct access to both express platforms, was built between West 93rd Street and West 94th Street.[29][26]

Once most of the work on the project was completed on February 6, 1959, all 1 trains became local, running at an increased frequency, and all 2 and 3 trains became express, and eight-car local trains began operation.[30] Due to the lengthening of the platforms at 86th Street and 96th Street, the intermediate 91st Street station was closed on February 2, 1959, because it was too close to the other two stations.[31][29]

On August 9, 1964, the New York City Transit Authority (NYCTA) announced the letting of a $7.6 million (equivalent to $63.4 million) contract to lengthen platforms at stations from Rector Street to 34th Street–Penn Station on the line, and stations from Central Park North–110th Street to 145th Street on the Lenox Avenue Line. The completion of the project would allow express trains to be lengthened from nine-car trains to ten-car trains, and to lengthen locals from eight-car trains to ten-car trains.[32]

By 1981, the Metropolitan Transportation Authority had listed the station among the 69 most deteriorated stations in the subway system.[33]

21st century[]

Inside of the new headhouse

In July 2006, Manhattan Community Board 7 approved an $80 million renovation of the station. Construction started in 2007 on a state-of-the-art head house in the median of Broadway between 95th and 96th Streets, with wheelchair-accessible elevators to the platforms; Broadway was reconfigured for four blocks to accommodate this. By 2008, renovation of the 40,000 square feet (3,716 m2) station was nearly finished below budget (only $65 million was used to complete the renovation) and on schedule.[34] By 2009, the opening of the new head house was set to be 20 months early and $26 million cheaper due to budget cuts.[35][36]

The new head house opened on April 5, 2010 and replaced the underpass and side platforms.[37] The side platforms became office and control space, and the entrances removed to accommodate narrowed sidewalks resulting from the roadway being displaced by the new head house and its island.[38] All of the beige tiles installed in the 1950s were removed and either revealed original tiles or were replaced with new tiles. The elevators opened on November 9, 2010 making the station ADA-accessible.[39] Local residents voiced dissatisfaction with the significant loss of sidewalks adjacent to businesses.[40] Also, the intersection of 96th Street and Broadway is dangerous, making the crossing to the new station entrance "treacherous".[41]

Station layout[]

Original cartouche on the wall with the number "96"
Original mosaic name tablet
Modern wall mosaics
G Street level Fare control
Disabled access Elevators inside station house in median of Broadway; entrances on south side of 96th Street and north side of 95th Street
M Mezzanine Crossover between platforms
P
Platform level
Side platform, not in service
Northbound local "1" train toward 242nd Street (103rd Street)
(No service: 157th Street)
"2" train toward 241st Street late nights (Central Park North–110th Street)
Island platform Disabled access
Northbound express "2" train toward 241st Street (Central Park North–110th Street)
"3" train toward 148th Street (Central Park North–110th Street)
Southbound express "2" train toward Flatbush Avenue (72nd Street)
"3" train toward New Lots Avenue (Times Square nights) (72nd Street)
Island platform Disabled access
Southbound local "1" train toward South Ferry (86th Street)
"2" train toward Flatbush Avenue late nights (86th Street)
(No service: 91st Street)
Side platform, not in service

96th Street contains four tracks and two island platforms that allow for cross-platform interchanges between local and express trains heading in the same direction. Express trains run on the innermost two tracks, while local trains run on the outer pair.[42] The local tracks are used by the 1 at all times[43] and by the 2 during late nights;[44] the express tracks are used by the 2 train during daytime hours[44] and the 3 train at all times.[45] The platforms were originally 350 feet (110 m) long, as at other express stations,[7]: 4[46]: 8[47] and 18 feet (5.5 m),[47]: 106 but as a result of the 1958–1959 platform extension, became 520 feet (160 m) long.[29] During normal service, southbound local trains use track B1 and southbound express trains use track B2. Northbound express trains use track B3 and northbound local trains use track B4. These track designations are not posted in the station, but are used in the chaining of each individual track, used to measure distance by train crews on the subway.[48][42]

View of unused side platform

There are two unused side platforms, one beside either local track.[37][42] A combination of island and side platforms was also used at Brooklyn Bridge–City Hall and 14th Street–Union Square on the IRT Lexington Avenue Line.[46]: 8 As originally intended, the island platforms facilitated an easy transfer between local and express trains, while the shorter side platforms provided easy access from local trains to the street. When the subway first opened, it was possible to open both sides of the train at once. As this is not practical on more modern trains, only the doors facing the island platforms are used (to permit transfers between local and express trains), and the side platforms were abandoned. The unused side platforms have been turned into storage space and offices. Switching system panels can be seen through new windows on the now walled off western side platform.

Before the completion of the main head house in 2010,[37] the station could be entered through stairways along the sidewalks of Broadway, to the extreme north end of the side platforms, then to the island platforms via an underpass. Engineers were unable to build a mezzanine level similar to other express stations for a few reasons. First of all, directly to the north of the station is an interlocking, and trains heading to the two branches are at the greatest gradients trains can operate on. Lowering the station to provide ample space for a mezzanine would have led to gradients that would have hindered efficient train operation. In addition, it was determined to be too costly to lower a large 6.5 feet (2.0 m)-wide trunk sewer in 96th Street, which was at the bottom of a drainage valley, enough to provide room for a mezzanine. The sewer was lowered 2.25 feet (0.69 m), when an additional 7 to 8 feet (2.1 to 2.4 m) of lowering would be needed to fit a mezzanine.[47]: 107

Design[]

As with other stations built as part of the original IRT, the station was constructed using a cut-and-cover method.[49]: 237 The tunnel is covered by a "U"-shaped trough that contains utility pipes and wires. The bottom of this trough contains a foundation of concrete no less than 4 inches (100 mm) thick.[46]: 9 Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The original platforms contain circular, cast-iron Doric-style columns spaced every 15 feet (4.6 m), while the platform extensions contain I-beam columns. Additional columns between the tracks, spaced every 5 feet (1.5 m), support the jack-arched concrete station roofs.[7]: 4[46]: 9 There is a 1-inch (25 mm) gap between the trough wall and the platform walls, which are made of 4-inch (100 mm)-thick brick covered over by a tiled finish.[46]: 9

The decorative scheme consists of red tile tablets, pink tile bands, a buff cornice, and buff plaques.[46]: 38 The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[46]: 31 The decorative work was performed by tile contractor Alfred Boote Company.[46]: 38 The design of the original station differs from that of the platform extensions, and the extent of the original station is clearly visible. Differences in the walls and ceiling are visible at the south end.

Track layout[]

Downtown 3 train leaving the station

North of 96th Street, there are crossovers between the uptown and downtown pairs of tracks, and between the express tracks. The express tracks then descend and turn east under West 104th Street and running northeast under Central Park on their way to the IRT Lenox Avenue Line at West 110th Street. The local tracks remain on the upper level to Riverdale, Bronx. After the express tracks diverge, a currently unused center track starts at approximately 100th Street.[42]

Some evidence remains of the 96th Street Improvement of 1907. As part of the project, one additional track would have run from 96th Street along the east side of Broadway, branching off the northbound local track and descending to the lower level, with a spur connecting to the Lenox tracks at 100th Street. The new northbound track would have then risen and merged with the northbound local track at 102nd Street. At 100th Street, a spur would connect to the other tracks. Two additional tracks would have been constructed, running along the west side of Broadway from 96th Street to 101st Street. The first of these two tracks would have branched off of the southbound local track and run parallel before merging back into that track at 101st Street. The second of these two tracks would have diverged from the first additional track on the west side of Broadway, and would run parallel and at the same grade until 98th Street. Here, the track would descend to the lower level. At 101st Street the track would curve and connect with the southbound track of the Lenox Avenue Line.[13] The completed parts of this project include the third northbound track, and a provision for a third track into the lower-level Lenox branch of the junction.[citation needed]

Exits[]

There are two sets of entrances and exits at the station.[50] Unlike more recent stations with full-length mezzanines, these entrance points are not connected; they can only be reached from the ends of the platforms.

Current exits[]

Completed new head house

The main, ADA-accessible entrance is through a domed, glass head house on the Broadway median between 95th and 96th Streets. Construction started in 2007, and the head house opened on April 5, 2010. Entrances are on both the 95th and 96th Street sides of the head house. Above each of the head house's entrances, and unusually for New York City Subway stations, the entrance's name plaque reads simply "96" in white letters upon glass, and light-up red circles containing the numbers "1", "2", and "3", the services of the IRT Broadway–Seventh Avenue Line. On the 96th Street side, there is a fare booth.

There are two staircases each at the southeastern and southwestern corners of 94th Street and Broadway. There is a crossover within fare control at this end of the station.[50]

Former exits[]

There were two staircases each at the southeastern and southwestern corners of 96th Street and Broadway.[50][a] Although fare control was at platform-level (on the unused side platforms), there was a free cross-under at this end of the station upon entering the paid area. The staircases were closed when the head house was opened on April 5, 2010, but a part of the original cross-under inside the fare control still exists.[51][a]

There was a control house in the median of Broadway, which dated to the station's opening in 1904. It was built as one of several station houses on the original IRT; similar station houses were built at Bowling Green and 72nd, 103rd, and 116th Streets.[52]: 46 The old control house has been closed and removed.

In popular culture[]

96th Street Station is the location of a chase scene in the 1979 cult film The Warriors. However, the scenes were actually filmed at the unused outer tracks of the Hoyt–Schermerhorn Streets station on the IND Fulton Street Line in Brooklyn. The exterior shots were filmed at the 72nd Street station.[53]

Notes[]

References[]

  1. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ Jump up to: a b "Our Subway Open: 150,000 Try It; Mayor McClellan Runs the First Official Train". The New York Times. October 28, 1904. p. 1. ISSN 0362-4331. Retrieved April 21, 2020.
  3. ^ "Station Developers' Information". Metropolitan Transportation Authority. Retrieved June 13, 2017.
  4. ^ "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  5. ^ Jump up to: a b "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  6. ^ Jump up to: a b c d e f g Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
  7. ^ Jump up to: a b c d "Interborough Rapid Transit System, Underground Interior" (PDF). New York City Landmarks Preservation Commission. October 23, 1979. Retrieved November 19, 2019.
  8. ^ Jump up to: a b Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
  9. ^ "Some Subway "Ifs" and "Don'ts"". The New York Times. October 27, 1904. p. 9. ISSN 0362-4331. Retrieved January 4, 2021 – via newspapers.com open access.
  10. ^ "Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now". The New York Times. August 2, 1908. p. 10. Retrieved November 6, 2016.
  11. ^ The Merchants' Association of New York Pocket Guide to New York. Merchants' Association of New York. March 1906. pp. 19–26.
  12. ^ Brooklyn Daily Eagle Almanac. Brooklyn Daily Eagle. 1916. p. 119.
  13. ^ Jump up to: a b Agreement Modifying Contract For Construction And Operation Of Rapid Transit Railroad Additional Tracks Near 96th Street. Rapid Transit Board. June 27, 1907.
  14. ^ "New York City's Subway Turns 100" (PDF). The Bulletin. Electric Railroaders' Association. 47 (10). October 2004. Archived from the original (PDF) on April 3, 2018. Retrieved April 2, 2018.
  15. ^ Report of the Public Service Commission For The First District of the State of New York For The Year Ending December 31, 1909. Albany: Public Service Commission. 1910.
  16. ^ Jump up to: a b Hood, Clifton (1978). "The Impact of the IRT in New York City" (PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208). Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.CS1 maint: postscript (link)
  17. ^ Jump up to: a b Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911.
  18. ^ "Ten-car Trains in Subway to-day; New Service Begins on Lenox Av. Line and Will Be Extended to Broadway To-morrow". The New York Times. January 23, 1911. ISSN 0362-4331. Retrieved April 5, 2018.
  19. ^ Proceedings of the Transit Commission, State of New York. New York State Transit Commission. 1923. pp. 185–186.
  20. ^ Minutes of the Board of Estimate and Apportionment of the City of New York From June 1, 1915 to June 30, 1915. Vol V. New York City Board of Estimate. 1915. pp. 3613–3615.
  21. ^ Third Annual Report For the Calendar Year 1923. New York State Transit Commission. 1924. p. 93.
  22. ^ "Open New Subway Lines to Traffic; Called a Triumph" (PDF). The New York Times. August 2, 1918. p. 1. ISSN 0362-4331. Retrieved October 4, 2011.
  23. ^ Brown, Nicole (May 17, 2019). "How did the MTA subway lines get their letter or number? NYCurious". amNewYork. Retrieved January 27, 2021.
  24. ^ Friedlander, Alex; Lonto, Arthur; Raudenbush, Henry (April 1960). "A Summary of Services on the IRT Division, NYCTA" (PDF). New York Division Bulletin. Electric Railroaders' Association. 3 (1): 2–3.
  25. ^ "Modernization of West Side IRT Press Release" (PDF). New York City Transit Authority. June 14, 1956. Retrieved December 21, 2020.
  26. ^ Jump up to: a b Annual Report For The Year Ending June 30, 1959 (PDF). New York City Transit Authority. 1959. pp. 8–10.
  27. ^ Proceedings of the New York City Transit Authority Relating to Matters Other Than Operation. New York City Transit Authority. 1961. pp. 73, 179.
  28. ^ New York City Transit Authority Annual Report For The Year Ended June 30, 1960. New York City Transit Authority. 1960. pp. 15–16.
  29. ^ Jump up to: a b c "High-Speed Broadway Local Service Began in 1959". The Bulletin. New York Division, Electric Railroaders' Association. 52 (2). February 2009. Retrieved August 26, 2016 – via Issuu.
  30. ^ "Wagner Praises Modernized IRT — Mayor and Transit Authority Are Hailed as West Side Changes Take Effect". The New York Times. February 7, 1959. p. 21. ISSN 0362-4331. Retrieved November 6, 2016.
  31. ^ Aciman, Andre (January 8, 1999). "My Manhattan — Next Stop: Subway's Past". The New York Times. ISSN 0362-4331. Retrieved August 26, 2016.
  32. ^ "IRT Riders To Get More Train Room; $8.5 Million Is Allocated for Longer Stations and for 3 New Car Washers". The New York Times. August 10, 1964. ISSN 0362-4331. Retrieved January 4, 2021.
  33. ^ Gargan, Edward A. (June 11, 1981). "Agency Lists its 69 Most Deteriorated Subway Stations". The New York Times. Retrieved August 13, 2016.
  34. ^ Arak, Joey (September 16, 2008). "96th Street Subway Overhaul is Complete, Says Trade Mag". Curbed. Retrieved December 20, 2020.
  35. ^ Arak, Joey (April 29, 2009). "Cash-Strapped MTA Tinkering With New 96th Street Station". Curbed. Retrieved August 23, 2013.
  36. ^ Haddon, Heather (April 28, 2009). "MTA shaves cost, features from 96th Street station rehab". amNew York. Archived from the original on May 3, 2009.
  37. ^ Jump up to: a b c Arak, Joey (April 5, 2010). "Subway Station of the Future Opens on Upper West Side". Curbed. Retrieved August 23, 2013.
  38. ^ "96th Street presentation to Manhattan Community Board 7" (PDF). nyc.gov. 2010. Archived (PDF) from the original on December 20, 2020.
  39. ^ Leslie Albrecht (November 8, 2010). "Months After Grand Opening, MTA Says Elevators at 96th Street Station To Open Tuesday". DNAinfo. Archived from the original on November 9, 2010. Retrieved November 10, 2010.
  40. ^ 96th Street sidewalk models make us believe Curbed Retrieved September 1, 2007 Archived September 28, 2007, at the Wayback Machine
  41. ^ Pete Donohue (April 5, 2014). "Treacherous intersection of W. 96th St. and Broadway getting a safety-promoting overhaul: DOT officials". New York Daily News. Retrieved August 23, 2014.
  42. ^ Jump up to: a b c d Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 – via Google Books.
  43. ^ "1 Subway Timetable, Effective September 13, 2020". Metropolitan Transportation Authority. Retrieved December 9, 2020.
  44. ^ Jump up to: a b "2 Subway Timetable, Effective September 13, 2020". Metropolitan Transportation Authority. Retrieved December 9, 2020.
  45. ^ "3 Subway Timetable, Effective September 13, 2020". Metropolitan Transportation Authority. Retrieved December 9, 2020.
  46. ^ Jump up to: a b c d e f g h Framberger, David J. (1978). "Architectural Designs for New York's First Subway" (PDF). Historic American Engineering Record. pp. 1-46 (PDF pp. 367-412). Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.CS1 maint: postscript (link)
  47. ^ Jump up to: a b c Britain), Institution of Civil Engineers (Great (1908). Minutes of Proceedings of the Institution of Civil Engineers. The Institution.
  48. ^ New York City Subway chaining Archived April 5, 2008, at the Wayback Machine TheJoeKorner Retrieved September 1, 2008
  49. ^ Scott, Charles (1978). "Design and Construction of the IRT: Civil Engineering" (PDF). Historic American Engineering Record. pp. 208–282 (PDF pp. 209–283). Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.CS1 maint: postscript (link)
  50. ^ Jump up to: a b c "96th Street Neighborhood Map". mta.info. Metropolitan Transportation Authority. April 2018. Retrieved December 20, 2020.
  51. ^ 96th Street NYCSubway Retrieved September 1, 2008
  52. ^ Stern, Robert A. M.; Gilmartin, Gregory; Massengale, John Montague (1983). New York 1900: Metropolitan Architecture and Urbanism, 1890-1915. New York: Rizzoli. ISBN 0-8478-0511-5. OCLC 9829395.
  53. ^ http://www.scoutingny.com/the-new-york-city-filming-locations-of-the-warriors-part-3/

External links[]

External video
video icon 96 St Station House, Metropolitan Transportation Authority; April 16, 2010; 2:14 YouTube clip
Retrieved from ""