Autostrada A18 (Italy)

From Wikipedia, the free encyclopedia
Autostrada A18 shield}}
Autostrada A18
Messina-Catania
Catania-Siracusa
Siracusa-Ragusa-Gela
Route information
Maintained by ANAS
Section 1
Length77 km (48 mi)
North endMessina
South endCatania
Section 2
Length47 km (29 mi)
North endSyracuse
South endIspica
Location
RegionsSicily
Highway system
  • Roads in Italy
The A18 near S.Alessio Siculo.

The Autostrada A18 is a 77 km (48 mi) motorway on the Ionian coast of Sicily that links Messina to Catania. The motorway is linked to the A20 Messina-Palermo at its northern-end and to the A19 Palermo-Catania through the RA15 Catania's Ring Road at its southern-end. There is also a second stretch of A18, of 50 km, on the south part of the island, running from Syracuse to Rosolini, recently extended to Ispica/Pozzallo with ongoing works to extend to Modica.

Messina – Catania[]

A18 MESSINA – CATANIA
Type Exit ↓km↓ ↑km↑ Province European Road
Italian traffic signs - autostrada.svg Autostrada A20 Italia.svg Messina-Palermo 0,0 0,0 ME Tabliczka E45.svg
AB-AS-grün.svg Messina Sud – Tremestieri 0,0 75,6 ME Tabliczka E45.svg
Italian traffic signs - stazione.svg Toll barrier Messina Sud 0,0 75,6 ME Tabliczka E45.svg
AB-AS-grün.svg Roccalumera 21,3 54,3 ME Tabliczka E45.svg
AB-Tank.svg Service station "Barracca" 25,6 50,0 ME Tabliczka E45.svg
AB-AS-grün.svg Taormina 35,2 40,4 ME Tabliczka E45.svg
AB-AS-grün.svg Giardini Naxos 41,0 34,6 ME Tabliczka E45.svg
AB-Tank.svg Service station "Calatabiano" 42,2 33,4 CT Tabliczka E45.svg
AB-AS-grün.svg Fiumefreddo 47,4 28,2 CT Tabliczka E45.svg
AB-AS-grün.svg Giarre 58,7 16,9 CT Tabliczka E45.svg
AB-AS-grün.svg Acireale 68,9 6,7 CT Tabliczka E45.svg
AB-Tank.svg Service station "Aci Sant'Antonio" 71,3 4,3 CT Tabliczka E45.svg
Italian traffic signs - stazione.svg Toll barrier Catania Nord 75,6 0,0 CT Tabliczka E45.svg
AB-AS-grün.svg Paesi etnei CT Tabliczka E45.svg
AB-Kreuz-grün.svg A18 Catania Centre – San Gregorio
Italian traffic signs - raccordo autostradale 15.svg RA15 – Catania's Bypass
0,0 0,0 CT Tabliczka E45.svg

A18dir Diramazione Catania Nord[]

A18 dir CATANIA NORD
Type Exit ↓km↓ ↑km↑ Province
AB-Kreuz-grün.svg Tabliczka E45.svg A18 to Messina
Tabliczka E45.svg Italian traffic signs - raccordo autostradale 15.svg RA15 – Catania's Bypass
0,0 CT
AB-AS-grün.svg San Gregorio CT
Zeichen 314 - Parkplatz, StVO 2013.svg Parking Area CT
AB-AS-grün.svg Canalicchio CT
Sinnbild Innerorts.svg Catania Centro 4,5 CT

Siracusa – Ragusa – Gela[]

The A18 near Noto's exit.

A first part of only 9,5 km from Syracuse to Cassibile opened 15 June 1983. After this, one had to wait for over 20 years until in March 2008 a second stretch from Cassibile to Noto went into service. The latest part, from Noto to Rosolini, opened to traffic in October 2008. An other part was opened in August 2021 from Rosolini to Ispica

Siracusa – Ispica[]

A18 SIRACUSA – ROSOLINI
Type Exit ↓km↓ ↑km↑ Province European Road
superstrada Siracusa
Strada Statale 114 Italia.svg
0 40,0 SR Tabliczka E45.svg
AB-AS-grün.svg Canicattini Bagni 0,1 SR Tabliczka E45.svg
AB-AS-grün.svg Cassibile 9,5 SR Tabliczka E45.svg
AB-AS-grün.svg Avola 16,7 SR Tabliczka E45.svg
AB-AS-grün.svg Noto 26,6 SR Tabliczka E45.svg
RWBA Tankstelle.svg Italian traffic signs - lavori.svg Service station 'Tellaro' (work in progress) 38,8 SR Tabliczka E45.svg
AB-AS-grün.svg Rosolini
Strada Statale 115 Italia.svg Sud Occidentale Sicula
40,0 0 SR Tabliczka E45.svg
AB-ende-grün.svg Ispica
Strada Statale 115 Italia.svg Sud Occidentale Sicula
50,0 0 SR Tabliczka E45.svg

Ispica – Ragusa[]

This part of the A18 was designed in the early '70s and required re-planning because the original project would have run through archeological areas and natural reserves (created in the '80s and '90s). The new project was completed in 2001 and is partially financed. Works started in 2014 taking the motorway from Rosolini to Ispica/Pozzallo, with the subsequent stretch to Modica at an advanced stage. The part from Rosolini to Ispica/Pozzallo was opened in August 2021. The next part to Modica estimated for opening towards end of 2022. Authorities are awaiting for further funding for the completion of this second part of the A18 that should run to Scicli and Ragusa.

Planned Exits (km from Syracuse):

AB-AS-grün.svg Modica 61
AB-AS-grün.svg Scicli 71
RWBA Tankstelle.svg Area servizio 'Irminio' 81
AB-AS-grün.svg Ragusa
Marina di Ragusa RWB Fähre(L).svg
85 0

Ragusa – Gela[]

The original plan of the A18 would have connected Ragusa to Gela. This part of the project is in advanced state of re-planning but has not got any funding yet.

Planned Exits:

References[]