BVG Class IK

From Wikipedia, the free encyclopedia
BVG Class IK
Berlin U-Bahn IK at Olympia-Stadion (1).jpg
A Class IK train
In service2015-present
ManufacturerStadler Rail
Built at
Constructed2014-2020
Entered service2015
Number built2 trains (IK15)
11 trains (IK17)
27 trains (IK18)
14 trains (IK20)
Number in serviceTotal 54 trains
Number scrapped0
Formation4 cars per half set
DM–M–M–DM
Fleet numbers1025 - 1026 (IK15)
1027 - 1037 (IK17)
1038 - 1064 (IK18)
5065 - 5078 (IK20)
Capacity72/80 seated, 258 standing, 2 wheelchair spaces
Operator(s)Berliner Verkehrsbetriebe
Line(s) servedU1, U2 & U5
Specifications
Car body constructionAluminium-alloy double-skinned construction
Train length51.64 m
Width2.4 m (7.9 ft) / 2.65 m (8.7 ft) (IK17 and IK20)
Height3.21 m (10.5 ft) m / 3.28 m (10.8 ft) m (IK17 and IK20)
Floor height875 mm (34.4 in) / 950 mm (37 in) mm (IK17 and IK20)
Entrylevel
DoorsSliding plug, 3 per side per car, 1.3 m (4.3 ft) wide each
Maximum speed70 km/h (43 mph)
Power output1.08 MW (1,450 hp)
Electric system(s)750 V DC
Current collection methodThird rail
UIC classification2’Bo’+Bo’Bo’+Bo’Bo’+Bo’2’
Braking system(s)Regenerative Braking, Resistor Braking, Air Brakes
Multiple workingHK and IK classes
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The BVG Class IK is a type of electrical multiple unit used on the Berlin U-Bahn.

History[]

In August 2011, BVG announced an order of IK series to replace A3L71 stock which had reached the end of its working life. Two prototypes were bought from Stadler Rail with the remaining 38 units being delivered between 2015 and 2017. These trains are based on the Stadler Tango family of trams and light rail vehicles, but resemble and function like a full-fledged subway train. The number '1xxx' will be jumped into '18Yxxx' (where Y is the train car number). Due to regenerative braking the trains will recuperate up to 20% of the energy they require.[1]

In 2012, BVG had awarded the tender for Class IK to Stadler Pankow, which replaces the life-expired A3L71 trains, which consists of 24 trains. It costs 158 million Euros. It has options for 10 more trains. In May 2015, BVG nicknamed the train "Icke". In September 2015, the first two trains were delivered - 1025 and 1026, into U1 and U2 respectively. In July 2016, BVG has plans to buy 27 more trains.

From July to December 2017, BVG has delivered 11 more trains under IK17. The trains are deployed to the bigger profile U5, which is due to shortage of trains. It is also called "Class I". The first train began running on 27 October 2017.

From April 2018, BVG had bought 27 more trains and delivered under IK18, which replaces A3L71.

In August 2017, U5 needs 20 more trains under IK20. This is because of various reasons as mentioned above. The Class D trains will be retired when the U55 extends to Alexanderplatz and this will be replaced by I-Class trains. With the delivery of the first IK20 unit 5065 on May 25, 2020 after the COVID-19 pandemic in Germany, the next delivery series of the IK series began, which again, like the IK17, will initially be in the large profile on the U5 line in order to have enough rolling stock for the planned end of 2020, to have a connection to Berlin Hauptbahnhof. The gap bridges known from the IK17 were installed accordingly. Significant differences to previous series are, for example, the new seat upholstery with the name "Urban Jungle", which is based on the well-known worm pattern from older BVG series and can already be found in new vehicles in the bus sector. Significantly fewer passenger information monitors were also installed in the passenger compartment. The numbering is also different here. Unlike its predecessors, the trains are included in the 5000 range. The reason for this is that in the small profile the numbers from 1070 to 1094 are still occupied by the GI / 1E series, which is in active passenger use, and are therefore no longer free for numbering. The plan is to classify trains in the 1000 range after the GI/1E series has been withdrawn.

References[]

  1. ^ Kurpjuweit, Klaus (January 15, 2014). "Die neue U-Bahn ist zu dick". tagesspiegel.de (in German). Der Tagesspiegel. Retrieved March 27, 2014.

External links[]

Stadler datasheet for the class

Retrieved from ""