Bijayapur-1 Hydropower Station
Bijayapur-1 Hydropower Station | |
---|---|
Location of Bijayapur-1 Hydropower Station in Nepal | |
Official name | Bijayapur-1 Hydropower Project |
Country | Nepal |
Location | Kaski District |
Coordinates | 27°50′11″N 85°48′15″E / 27.83639°N 85.80417°E |
Purpose | Power |
Status | Operational |
Owner(s) | Bhagawati Hydropower Development Company |
Dam and spillways | |
Type of dam | Gravity |
Impounds | |
Commission date | 2069-05-05 BS |
Type | Run-of-the-river |
Installed capacity | 4.5 MW |
Bijayapur-1 Hydropower Station (Nepali: बिजयपुर-१ जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Kaski District of Nepal. The flow from Bijayapur River is used to generate 4.5 MW electricity. The plant is owned and developed by Bhagawati Hydropower Development Company , an IPP of Nepal. The plant started generating electricity from 2069-05-05 BS. The generation licence will expire in 2101-12-21 BS, after which the plant will be handed over to the government.[1] The power station is connected to the national grid and the electricity is sold to Nepal Electricity Authority. [2]
See also[]
References[]
- ^ "Operating Projects :: Hydro (Above 1MW)".
- ^ Annual Report 2019/2020. Nepal Electricity Authority.
Categories:
- Hydroelectric power stations in Nepal
- Gravity dams
- Run-of-the-river power stations
- Dams in Nepal
- Irrigation in Nepal
- Buildings and structures in Kaski District
- Hydroelectric power plant stubs