Central Spine Road

From Wikipedia, the free encyclopedia
Federal Route 34 shield}}
Federal Route 34
Kuala Krai–Kuala Pilah Highway, Central Spine Road
Lebuhraya Kuala Krai–Kuala Pilah, Jalan Utama Tengah
Route information
Length325 km (202 mi)
Major junctions
North endKuala Krai, Kelantan
Major intersectionsE8 Jkr-ft2.png AH141 Kuala Lumpur–Karak Expressway
Jkr-ft2.png Federal Route 2
Jkr-ft185.png Simpang Pulai–Kuala Berang Highway
South end, Pahang / Kuala Pilah
Location
Primary
destinations
Gua Musang



Kuala Lipis
Raub / Sungai Ruan
Bentong
Karak
Mempaga / Kuala Pilah
Highway system
  • Expressways
  • Federal
  • State

Central Spine Road (CSR) or Kuala Krai–Kuala Pilah Highway, Federal Route 34, is a new toll-free highway under construction in the center of Peninsular Malaysia. The 325 km (201 miles) highway is built to eventually replace the former two-lane Federal Route 8 Gua Musang Highway and Federal Route 9 Karak–Tampin highway. Construction of CSR starts at Package 3 which is from Merapoh to Kampung Relong. It commences at Package 3 as the Gua Musang Highway passes through Chegar Perah which is prone to roadkill. The highway has a long eco-viaduct built in this section. Package 5 which is from north Raub to Karak will be built next, which will connect it to E8 Kuala Lumpur–Karak Expressway bypassing Bentong and . This will help detour traffic from the steep mountainous grade between Raub and Bentong.

History[]

  • On 15 December 2016, section 3H (Kg. Kechur to Kg. Sbrg. Jelai) was opened to traffic
  • Phase 1 is a 51 km stretch from Kuala Krai to Jambatan Sungai Lakit in Kelantan.
  • Phase 2 spans 63 km from Jambatan Sungai Lakit to Gua Musang in Kelantan
  • Phase 3 covers 107 km from Gua Musang to Kampung Relong in Pahang.
  • Phase 4 comprises 56 km from Kampung Relong to Raub in Pahang
  • Phase 5, 54 km from Raub to Bentong
  • Phase 6, is 47 km and connects Bentong and Simpang Pelangai.

Features[]

  • Four lanes, two on each side[1]
  • A long eco-viaduct for wild animals crossing
  • Some sections are concrete paved, making CSR as the only newly completed road paved using concrete

In most sections, the original Federal Route was built under JKR R5 road standards, allowing maximum speed limit of up to 90 km/h.

From Kampung Sungai Yu to Chegar Perah and from Chegar Perah to Bukit Tujuh, it overlaps Federal Route 8 Merapoh Highway.

Federal Route 8 may eventually remain as an alternative route.

There are no sections with motorcycle lanes.

List of interchanges[]

Km Exit Interchange To Remarks
Kuala Krai
Jkr-ft34.png Central Spine Road
Package 1
Start/End of highway
Under construction
Jkr-ft34.png Central Spine Road
Package 1
Under construction
Sungai Lakit Bridge
Jkr-ft34.png Central Spine Road
Package 2
Under construction
Jkr-ft34.png Central Spine Road
Package 2
Under construction
Gua Musang
Jkr-ft34.png Central Spine Road
Package 3
Under construction
Mentara
Kelantan Darul Naim
Gua Musang district border
Kelantan–Pahang border
Pahang Darul Makmur
Lipis district border
Jkr-ft34.png Central Spine Road
Under construction
Jkr-ft34.png Central Spine Road
Package 3
(Gua Musang–Kampung Relong)
Section 3F
JKR border limit
Kubang Rusa Interchange Jkr-ft8.png Merapoh Highway

West
Kampung Kubang Rusa
Merapoh
Gua Musang
Kuala Krai
Kota Bharu
Jkr-ft185.png Simpang Pulai–Kuala Berang Highway
Cameron Highland
Ipoh
Tasik Kenyir
Kuala Terengganu

East
Kampung Sungai Yu
Pusat Rekreasi Sungai Yu
Parclo B-2 interchange
Sungai Yu Eco-Viaduct
Eco-Viaduct
Sungai Yu Interchange Jkr-ft8.png Merapoh Highway

West
Kampung Sungai Yu
Pusat Rekreasi Sungai Yu
Merapoh
Trumpet interchange
Chegar Perah Jkr-ft8.png Merapoh Highway

West
Chegar Perah
LILO Kuala Krai bound
Chegar Perah Jkr-ft8.png Merapoh Highway

West
Chegar Perah
LILO Kuala Krai bound
U-Turn Jkr-ft8.png Central Spine Road

U-Turn
Chegar Perah
Sungai Yu
Kubang Rusa
Mentara
Gua Musang
Kuala Krai
Kota Bharu
U-Turn south bound
Under Construction
Jkr-ft34.png Central Spine Road
Package 3
(Gua Musang–Kampung Relong)
Section 3F
JKR border limit
Jkr-ft34.png Central Spine Road
Under construction
FELDA Telang
Kampung Kechur
Jkr-ft34.png Central Spine Road
Package 3
(Gua Musang–Kampung Relong)
Section 3H
JKR border limit
Kampung Seberang Jelai
Jkr-ft34.png Central Spine Road
Package 3
(Gua Musang–Kampung Relong)
Section 3H
JKR border limit
Jkr-ft34.png Central Spine Road
Package 3J
Under construction
Kampung Relong
Jkr-ft34.png Central Spine Road
Package 3
Under construction
Jkr-ft34.png Central Spine Road
Package 4
Under construction
Lipis–Raub district border
Jkr-ft34.png Central Spine Road
Package 5
Under construction
Raub
Raub–Bentong district border
Bentong Interchange Jkr-ft8.png Federal Route 8
Bentong
Bukit Fraser
Diamond interchange
Mempaga Interchange Mempaga Roundabout interchange
KLK Interchange E8 Jkr-ft2.png AH141 Kuala Lumpur–Karak Expressway

West
Kuala Lumpur
Genting Highlands

East
Gambang
Kuantan
Kuala Terengganu
Trumpet interchange
Jkr-ft34.png Central Spine Road
Under construction
Kampung Telemong
Mancis
Jkr-ft34.pngCentral Spine Road
Start/End of highway
Under construction
Northwest
Jkr-ft9.png Karak
Jkr-ft9.png Mancis

Southeast
Jkr-ft34.png Kuala Klawang
Jkr-ft9.png Kuala Pilah
Jkr-ft51.png Seremban
T-junctions

References[]

External links[]

Retrieved from ""