Chałubińskiego 8

From Wikipedia, the free encyclopedia
Chałubińskiego 8
Biurowiec Chałubińskiego 8 w Warszawie 2020.jpg
General information
Address8 ul. Chałubińskiego
Town or cityWarsaw
CountryPoland
Construction started1975
Completed1978
Height150m
Technical details
Floor count46 (+2 underground)
Design and construction
ArchitectJerzy Skrzypczak, Halina Świergocka-Kaim, Wojciech Grzybowski, Jan Zdanowicz, Jerzy Janczak

The Chałubińskiego 8 (formerly known as Elektrim and INTRACO II, then Oxford Tower) is a skyscraper located in Warsaw on 8 Chałubiński Street next to the Centrum LIM skyscraper.[1]

It was constructed from 1975 to 1978, from the design of Jerzy Skrzypczak, H. Świergocka-Kaim, and Wojciech Grzybowski. The skyscraper is a blue-white building whose styling was designed and constructed to appeal to an international audience. A similar second building, called Intraco I, was built a few years earlier and is located at Stawki Street.

The Oxford Tower building was one of the first, along with the Forum Hotel (now the Novotel Warszawa Centrum) and Intraco 1, of several skyscrapers in Warsaw.[2] The skyscraper is part of the so-called Center West; built in order to hide, and therefore weaken, the dominance of the pre-existing Palace of Culture and Science. The Oxford Tower consists of Class B office space which houses offices of companies such as Citibank Handlowy, Minex, Grappahl, Polservice, and AV investor Polferries. The headquarters of Elektrim was formerly housed in this building.

See also[]

References[]

  1. ^ "Oxford Tower, Warsaw | 111502". Emporis.com. Retrieved 2016-01-01.
  2. ^ "Nobel – Warsaw City Center". Nobel.pro. Retrieved 2016-01-01.

Coordinates: 52°13′34″N 21°00′15″E / 52.22611°N 21.00417°E / 52.22611; 21.00417


Retrieved from ""