Coeur d'Alene Subdivision
This article has multiple issues. Please help or discuss these issues on the talk page. (Learn how and when to remove these template messages)
|
Coeur d'Alene Subdivision[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Coeur d'Alene Subdivision is a railway line running about 12.3 miles (19.8 km) from Coeur d'Alene, ID to Hauser Junction near Hauser, ID. It is operated by BNSF Railway.
The territory is track warrant controlled.
BNSF has since removed the line from Coeur d'Alene to Hutter, ID. Currently the subdivision is currently only 8.4 miles (13.5 km) but the rail line is still timetabled to Coeur d'Alene
References[]
- ^ BNSF Northwest Division Timetable No. 5
External links[]
Categories:
- BNSF Railway lines
- Rail infrastructure in Idaho