Coimbatore Integrated Bus Terminus

From Wikipedia, the free encyclopedia

Coimbatore Integrated Bus TerminusBus interchange
கோயம்புத்தூர் ஒருங்கிணைந்த பேருந்து நிலையம்
TNSTC Bus Terminus, SETC Bus Terminus and Town Bus Terminus
LocationChettipalayam Road, Podanur, Vellalore (Post) Coimbatore
Tamil Nadu-641023
Owned byCoimbatore City Municipal Corporation
Operated byDepartment of Transport (Tamil Nadu)
Platforms253
ConnectionsCoimbatore Metro, Tamil Nadu State Transport Corporation
Construction
ParkingYes
Bicycle facilitiesYes
Disabled accessYes
Other information
Fare zoneTNSTC Coimbatore Division (191-CBE)
History
OpenedUnder Construction
Passengers
3,50,000 Expected

The Coimbatore Integrated Bus Terminus, commonly known as the CIBT, is the integrated bus terminus under construction in Podanur on Chettipalayam Road, Coimbatore, Tamil Nadu, India, to serve both intercity and intracity buses.[1]

Background[]

The bus terminus was planned to reduce traffic congestion in the city by integrating the Gandhipuram Central Bus Terminus, Gandhipuram Thiruvalluvar Bus stand (For SETC), KSRTC Buses (Karnataka) and KSRTC Buses (Kerala), Ukkadam Bus Terminus, Singanallur Bus Terminus, Saibaba Colony Bus Terminus within a single campus. The terminus would come up at Chettipalayam Road at Vellalore at a site of 61.6 acres area.[2]

Timeline[]

  • 2014-The Coimbatore Integrated Bus Terminus project was announced by former Chief Minister J. Jayalalithaa.[3]
  • 2020-The foundation stone was laid on 22 February.[4] The proposed terminus will be built at a cost of 168 crores.
  • 2020-The CMRL proposed to connect CIBT and Ukkadam Bus Terminus by the corridor-V of Coimbatore Metro[5]

Inclusion of Battery-based buses in CIBT[]

In the project, special battery charging points and maintenance sheds for battery-based buses are included.[6]

Facilities[]

The size of the land earmarked for the project is 61 acres. The proposed terminus will have the following facilities:[7]

  • 140 bus bays
  • 33 town bus bays
  • 112 idle parking bays
  • 80 omni bus bays
  • Mother's room
  • Medical centre,
  • Clinic,
  • Store room
  • Cloak room
  • 11 ATM's
  • 71 shops
  • seven offices for transport corporations
  • 20 ticket counters, 3 transport offices and 3 time offices
  • 2 restaurants over 405 square meters
  • 2 dormitories
  • 3 commercial office spaces
  • The parking will have 110 four wheeler parking slots and 1200 two wheeler parking slots.
  • TNSTC Coimbatore, Tiruppur Head Office[8]

Planning Phase-1[]

The phase 1 will include the construction of Mofussil, SETC and City bus terminals.[9]

Planning Phase-2[]

The phase 2 will include the construction of Omni bus terminal.[10]

Connections[]

The terminus is connected to all the major places within the city such as:

Metro[]

The proposal of the Coimbatore Metro Corridor-V has been proposed to connect Ukkadam Bus Terminus with CIBT via Podanur Junction.[11][12]

See also[]

References[]

  1. ^ "Coimbatore Corporation floats tender for new bus stand in Vellalore". The Hindu. 14 October 2019. Retrieved 14 October 2019.
  2. ^ "Coimbatore Corporation plans to build new bus stand in Vellalore by integrating all the existing bus stands". The Hindu. Coimbatore. 24 January 2020. Retrieved 24 January 2020.
  3. ^ "Coimbatore Corporation plans to build new bus stand in Vellalore". The Hindu. 16 July 2014. Retrieved 16 July 2014.
  4. ^ "Foundation stone laid for Integrated bus stand in Coimbatore". The Hindu. Coimbatore. 24 January 2020. Retrieved 24 January 2020.
  5. ^ "Coimbatore Metro project to connect CIBT at Vellalore and Ukkadam begin soon". Metro Rail News. Coimbatore. 12 March 2020. Retrieved 12 March 2020.
  6. ^ "Futuristic Planning in CIBT design". Simplicity. Coimbatore. 31 March 2021. Retrieved 18 April 2021.
  7. ^ "Facilities in CIBT". The Hindu. Coimbatore. 24 January 2020. Retrieved 14 March 2021.
  8. ^ "TNSTC Coimbatore,Tiruppur Head Office to be included in CIBT design". Simplicity. Coimbatore. 31 March 2021. Retrieved 18 April 2021.
  9. ^ "CIBT Phase-1". The Times of India. Coimbatore. 24 January 2020. Retrieved 18 April 2021.
  10. ^ "CIBT Phase-2". The Hindu. Coimbatore. 14 January 2019. Retrieved 18 April 2021.
  11. ^ Subburaj, A. (18 February 2020). "Tamil Nadu: Fifth corridor of metro rail to connect Vellalore and Ukkadam | Coimbatore News". The Times of India. Retrieved 27 May 2021.{{cite web}}: CS1 maint: url-status (link)
  12. ^ Subburaj, A. (2 August 2021). "Coimbatore Metro Project gets going with tenders for carrying out topographical survey". Metro Rail News. Retrieved 2 August 2021.{{cite web}}: CS1 maint: url-status (link)

Retrieved from ""