Cremona–Fidenza railway

From Wikipedia, the free encyclopedia

Cremona–Fidenza railway
Mappa ferrovia Cremona-Fidenza.png
Overview
Statusin use
OwnerRFI
LocaleItaly
TerminiCremona
Fidenza
Service
TypeHeavy rail
Operator(s)Trenitalia
History
Opened1906 (1906)
Technical
Line length34 km (21 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification3 kV DC
Route map

Legend
km
elev
0.000
Cremona
46 m
6.087
Castelvetro
39 m
9.394
San Giuliano Piacentino
39 m
14.132
Villanova d'Arda
41 m
21.122
Busseto
42 m
28.126
Castione dei Marchesi
54 m
30.363
2° Bivio/PP Fidenza Ovest
from the HSR
33.893
Fidenza
74 m
to La Spezia / to Bologna
Source: Italian railway atlas[1]

The Cremona–Fidenza railway is a railway line in Italy.

History[]

The line was opened on 12 September 1906 [2] and operated by the private railway company (SIFT). Later it came to the state company Ferrovie dello Stato (FS).

It was electrified at the end of the 1970s, in order to provide an alternative route (via Treviglio, Cremona and Fidenza) for the freight trains from Milan to the south. The electrical service started on 27 May 1979.[3]

See also[]

References[]

  1. ^ Atlante ferroviario d'Italia e Slovenia (Italy and Slovenia railway atlas). Köln: Schweers + Wall. 2010. p. 34. ISBN 978-3-89494-129-1.
  2. ^ Alessandro Tuzza (6 February 2014). "Prospetto cronologico dei tratti di ferrovia aperti" (in Italian). www.trenidicarta.it. Archived from the original on 24 June 2009. Retrieved 2015-02-18.
  3. ^ Claudio Cerioli: Elettrficata la Cremona – Fidenza. In: ″Italmodel Ferrovie″ Nr. 230 (September 1979), p. 28–30.

Bibliography[]

  • RFI - Fascicolo linea 30

External links[]

Media related to Cremona–Fidenza railway at Wikimedia Commons

Retrieved from ""