Crossness Sewage Treatment Works

From Wikipedia, the free encyclopedia

The Crossness Sewage Treatment Works at Crossness (TQ487805) in the London Borough of Greenwich is located at the eastern end of the Southern Outfall Sewer. It was opened in 1865 and is one of the largest sewage works in the United Kingdom. It treats the waste water from the Southern Outfall Sewer serving South and South East London, and is associated with the adjacent Crossness Pumping Station. It is operated by Thames Water.

History[]

As originally conceived the works comprised reservoirs covering 2.6 hectares designed to retain six hours’ flow of sewage. No sewage treatment was provided and the sewage was discharged untreated into the River Thames on the ebb tide. Following the Princess Alice disaster in 1878 a Royal Commission was appointed in 1882 to examine Metropolitan Sewage Disposal. It recommended that a precipitation process should be deployed to separate solids from the liquid and that the solids should be burned, applied to land or dumped at sea. A precipitation works using lime and iron sulphate was installed at Crossness in 1888–91.[1] Sludge was disposed of in the Barrow Deep and later in the Black Deep in the outer Thames estuary.[2] In the year 1912/13 the Crossness works received and treated 49,534 million gallons (225.2 million m3) of sewage, and disposed of 880,000 tons of sludge. The cost of operating the Crossness works was £44,269.[3] In 1919/20 the corresponding figures were 41,209 million gallons (187.3 million m3), of sewage, 767,000 tons of sludge sent to sea, entailing 767 sludge vessel voyages, and the costs were £52,282.[4]

Advanced treatment[]

Work began in the early 1960s to install a modern treatment plant capable of treating 450,000 cubic metres per day of sewage. The cost of the works was £9 million at 1963 prices. The plant comprised storm tanks, detritus channels, primary sedimentation, mechanical aeration, final sedimentation and sludge digestion.[5]

Treatment tanks at Crossness sewage treatment works, 1964
Service No. Type
Storm tanks Rectangular
Primary sedimentation tanks 16 Rectangular
Aeration tanks Mechanical aeration, 348 Rectangular
Final sedimentation tanks 32 Circular
Primary sludge digestion tanks 16 Circular
Secondary sludge digestion tanks 12 Circular

The treated effluent outfall from the plant is into the River Thames at the eastern end of the works. Following the 1964 upgrade the works at Crossness began to produce a nitrifying effluent whereupon sulphide disappeared from the tideway; an excess of nitrate provided a safeguard against sulphide formation in the river.[5] The practice of dumping sewage sludge at sea was banned in 1998. In that year a sludge incineration plant was commissioned. This provides 6 MW of power for use at the treatment works.[6]

New processes[]

In 2010–14 the Crossness works were upgraded to treat 44 per cent more sewage to reduce storm sewage flowing into the Thames during heavy rainfall. The works cost £220m (2010 prices). The upgrade involved the installation of new renewable energy sources including a 2.3 MW wind turbine and thermal hydrolysis plant, an advanced digestion plant and an odour control treatment system. The project enabled the plant to treat 13 cubic metres per second of sewage and incorporated new inlet works, primary settlement tanks, secondary biological treatment implementing the activated sludge process and final settlement tanks. It also included the installation of associated sludge thickening and odour treatment facilities. The hydrolysis plant burns combustible sludge flakes created after waste water treatment to 160 °C, this produces 50 per cent more biogas prior to the anaerobic digestion process. The biogas is used to generate renewable energy which is powered by 3x 2MWe gas engines.[7] The project included the installation of eight new primary settlement tanks where sewage is collected to remove primary sludge passing through two 1.2 km-long culverts of 2 m diameter. Sewage passes through a pair of new aeration lanes into twelve final settlement tanks of 40 m diameter. The activated sludge plant includes six aeration lanes of 69 m with total volume of 86,000 cubic metres and a treatment capacity of 564,000 cubic metres per day. It includes anoxic zone mixers, a fine bubble diffused aeration system and five centrifugal blowers giving an air flow of up to 21,000 cubic metres per hour. Additional sludge storage and thickening facilities store the additional sludge. The five raw sludge gravity belt thickeners have a capacity of 6,055 cubic metres per day each.[8]

See also[]

Crossness Pumping Station

Southern Outfall Sewer

Beckton Sewage Treatment Works

References[]

  1. ^ Wood, Leslie B (1982). The Restoration of the Tidal Thames. Bristol: Adam Hilger. p. 42.
  2. ^ Wood, Leslie B (1982). The Restoration of the Tidal Thames. Bristol: Adam Hilger. p. 62.
  3. ^ London County Council (1915). London Statistics 1912-13 vol. XXIV. London: London County Council. p. 203.
  4. ^ London County Council (1922). London Statistics 1920-21 vol. XXVII. London: London County Council. p. 99.
  5. ^ a b Wood, Leslie B (1982). The Restoration of the Tidal Thames. Bristol: Adam Hilger. pp. 105–07.
  6. ^ "Crossness Incineration Plant". IndustryAbout.com. 2 March 2017. Retrieved 15 February 2020.{{cite web}}: CS1 maint: url-status (link)
  7. ^ "Edina 6MWe CHP increases power production at Crossness Sewage Treatment Works". Edina.{{cite web}}: CS1 maint: url-status (link)
  8. ^ "Crossness Sewage Treatment Works Upgrade". Arjay Engineering. Retrieved 15 February 2020.{{cite web}}: CS1 maint: url-status (link)
Retrieved from ""