Dali–Lincang railway
Dali–Lincang railway | |||||||
---|---|---|---|---|---|---|---|
Overview | |||||||
Native name | 大临铁路 | ||||||
Status | Operating | ||||||
Termini | Dali | ||||||
Service | |||||||
Type | Heavy rail | ||||||
Operator(s) | China Railway Kunming Group | ||||||
History | |||||||
Opened | 30 December 2020 | ||||||
Technical | |||||||
Line length | 201.8 km (125 mi) | ||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||
Electrification | 50 Hz 25,000 V | ||||||
Operating speed | 160 km/h (99 mph) | ||||||
Chinese name | |||||||
Traditional Chinese | 大臨鐵路 | ||||||
Simplified Chinese | 大临铁路 | ||||||
|
The Dali–Lincang railway (Chinese: 大临铁路) is a single-track electrified railway in China. The combined passenger and freight line is 201.8 kilometres (125.4 mi) long and has a design speed of 160 kilometres per hour (99 mph).[1]
History[]
In December 2020, electrification of the railway was completed.[2] It opened on 30 December 2020. Initial service provision was three trains in each direction between Dali and Lincang, and one train per day in each direction between Kunming and Lincang.[3] Services will be increased further from 20 January 2021.[4]
Major Passenger stations[]
- Dali
- Xiaowan East (opened on November 6, 2021)
References[]
- ^ 大理巍山临沧铁路将于年内开工建设_国内铁路_中华铁道网. www.chnrailway.com. Retrieved 2020-12-18.
- ^ 大临铁路全线接触网顺利贯通. gaotie.cn. 17 December 2020. Retrieved 18 December 2020.
- ^ 大理至临沧铁路30日开通运营 - 州市 - 云南日报网. www.yndaily.com. Retrieved 2020-12-30.
- ^ 云南:1月20日起昆明至临沧动车增开至4对 出行更便捷_【高铁网】. news.gaotie.cn. Retrieved 2021-01-12.
Categories:
- Railway lines in China
- Railway lines opened in 2020
- Transport in Dali Bai Autonomous Prefecture
- Transport in Lincang
- People's Republic of China rail transport stubs