Görlinger-Zentrum station
KVB light rail station | |||||||||||
Location | Görlinger-Zentrum 50829 Cologne North Rhine-Westphalia Germany | ||||||||||
Coordinates | 50°58′50″N 6°52′14″E / 50.98055°N 6.87047°ECoordinates: 50°58′50″N 6°52′14″E / 50.98055°N 6.87047°E | ||||||||||
Owned by | Stadtwerke Köln | ||||||||||
Operated by | KVB | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Parking | No | ||||||||||
Bicycle facilities | Yes | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Fare zone | VRS: 2100[1] | ||||||||||
Website | www.kvb.koeln | ||||||||||
History | |||||||||||
Opened | 27 August 2018 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Görlinger-Zentrum Location in North Rhine-Westphalia |
Görlinger-Zentrum is the northwesternmost terminal station of Cologne Stadtbahn line 3, located in Cologne, Germany. The station lies in the Görlinger-Zentrum of the district of Bocklemünd.
The station was opened on 27 August 2018[2] and consists of two side platforms with together two rail tracks.
By lowering the tracks in the area of the terminal stop, a level access at sidewalk level was made possible. The new terminus was equipped with a 90-centimetre high platform for barrier-free access.
See also[]
References[]
- ^ "VRS-Gemeinschaftstarif" (PDF) (in German). Verkehrsverbund Rhein-Sieg. 20 April 2020. p. 202. Retrieved 9 May 2020.
- ^ "Neue Stadtbahnhaltestelle „Görlinger-Zentrum"" (in German). Kölner Verkehrs-Betriebe AG. 2018-08-25. Retrieved 2020-01-04.
External links[]
- KVB station info page (in German)
- VRS station info page (in German)
Categories:
- Cologne KVB stations
- Ehrenfeld, Cologne
- Railway stations in Germany opened in 2018
- German rapid transit stubs
- North Rhine-Westphalia railway station stubs