Haikou Nandu River Water Diversion Project

From Wikipedia, the free encyclopedia
Pumping station under construction, the source of the diverted water, May 2018

Haikou Nandu River Water Diversion Project (Chinese: 海口南渡江引水工程) is a project to divert water from the Nandu River to parts of Haikou Prefecture, in particular, an agricultural area west of Haikou City where lychee are grown.[1][2][3][4][5][6][7]

Tunnel construction[]

One of the many access pit showing tunnel

The project is ongoing in 2017 and includes a pumping station on the east bank of the Nandu River just south of the Longtang Dam. Tunnels are being bored from the west side of the Nandu westward to the areas where the water is needed. This involves underground blasting and the creation of numerous pits along the route for equipment access.

References[]

  1. ^ "海口市南渡江引水工程正式开工-中国水网".
  2. ^ L_104238. "海口市南渡江引水工程开工 总投资36.2亿元--人民网海南视窗--人民网".
  3. ^ yfs001. "海口市南渡江引水工程立项_滚动读报_光明网".
  4. ^ http://www.haikou.gov.cn/xxgk/szfbjxxgk/cztz/zfcg/cggg/201510/t20151009_891539.html
  5. ^ http://www.hq.xinhuanet.com/news/2013-11/26/c_118295366.htm
  6. ^ 宁波. "海口市南渡江引水工程开工 缓解海口工农业缺水 - 国内新闻 - 中国日报网".
  7. ^ "南渡江引水工程 - 海南省水务厅门户网站".

External links[]

Retrieved from ""