Hotan–Ruoqiang railway

From Wikipedia, the free encyclopedia
Hotan–Ruoqiang railway
Overview
Native name和若铁路
StatusUnder construction
TerminiHotan
Continues fromKashgar–Hotan railway
Connecting linesGolmud–Korla railway
Service
TypeHeavy rail
Technical
Line length825.5 km (513 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed120 km/h (75 mph)

The Hotan–Ruoqiang railway (Chinese: 和若铁路) is a railway line currently under construction in Xinjiang, China. It will have a design speed of 120 kilometres per hour (75 mph) and is expected to be completed in June 2022.[1][2][3]

History[]

Construction on the line began in 2018. Tracklaying began in May 2020 and by April 2021, over half the track had been laid.[1] On 27 September 2021, the construction of the track was fully completed with the laying of the last length of track.[4] Rail welding was completed on 28 October 2021, with track bed tamping and fine adjustment of the line required before scheduled opening of the entire line in 2022.[5]

Route[]

The line is 825.5 kilometres (512.9 mi) long and runs from west to east.[1] In Hotan it continues as the Kashgar–Hotan railway and in Ruoqiang it branches off the Golmud–Korla railway.

References[]

  1. ^ a b c "456公里,和若铁路铺轨过半" [456 km, over half the track for the Hotan–Ruoqiang railway has been laid] (in Chinese). cnr.cn. 30 April 2021. Retrieved 30 April 2021.
  2. ^ "国家发改委同意新建和田至若羌铁路,总投资221.5亿元" (in Chinese). Sina. 8 May 2018. Retrieved 30 April 2021.
  3. ^ "和若铁路正式"闭环"". 高铁网 (in Chinese). 2021-11-19. Retrieved 2021-11-20.{{cite web}}: CS1 maint: url-status (link)
  4. ^ "完成铺轨,沙漠环形铁路网闭环" [Completed track laying, the desert loop railway line is completed]. 高铁网 (in Chinese). 2021-09-29. Retrieved 2021-09-29.{{cite web}}: CS1 maint: url-status (link)
  5. ^ "新疆和若铁路全线焊轨完成" [The rail welding of Xinjiang Heruo Railway is completed]. 中国新闻网 (China News Network) (in Chinese). 2021-10-28. Retrieved 2021-11-25.{{cite web}}: CS1 maint: url-status (link)