Huai Kum Dam
This article needs additional citations for verification. (June 2020) |
Huai Kum Dam | |
---|---|
Official name | Huai Kum Dam |
Country | Thailand |
Location | Kaset Sombun, Chaiyaphum |
Coordinates | 16°24′37″N 101°47′35″E / 16.410198°N 101.793102°ECoordinates: 16°24′37″N 101°47′35″E / 16.410198°N 101.793102°E |
Opening date | 1980 |
Owner(s) | Electricity Generating Authority of Thailand |
Dam and spillways | |
Type of dam | Rockfill |
Impounds | Nam Phrom River |
Height | 35.5 m (116 ft) |
Length | 282 m (925 ft) |
Reservoir | |
Creates | Huai Kum Dam Reservoir |
Power Station | |
Operator(s) | Electricity Generating Authority of Thailand |
Installed capacity | 1.2 MW |
Annual generation | 2 GWh |
Huai Kum Dam (Thai: เขื่อนห้วยกุ่ม, RTGS: Khuean Huai Kum, pronounced [kʰɯ̀a̯n hûa̯j kùm]), is on the in Kaset Sombun District, Chaiyaphum Province, Thailand.[1] It consists of a rockfill dam with clay core (35.5 metres high and 282 metres long) and a 1.2 MW semi-underground powerhouse which rises four metres high from the ground and 11 metres beneath the surface. The dam forms a reservoir with a storage capacity of 22 million cubic metres to supply water for the downstream irrigation areas of Chulabhorn Dam in Chaiyaphum Province whereas the power plant provides two million kWh of electric energy per year. The king and the queen accompanied by Princess Maha Chakri Sirindhorn and Princess Chulabhorn presided over the inauguration ceremony on 19 December 1980.[2]
References[]
- ^ "Huai Kum Dam". Tourism Authority of Thailand (TAT). Retrieved 28 June 2020.
- ^ "Royally-Initiated Development Projects". Electricity Generating Authority of Thailand (EGAT). Retrieved 28 June 2020.
- Dams in the Mekong River Basin
- Dams completed in 1980
- Dams in Thailand
- Hydroelectric power stations in Thailand
- Buildings and structures in Chaiyaphum Province
- 1980 establishments in Thailand
- Energy infrastructure completed in 1980
- Thai building and structure stubs
- Asian dam stubs