Interstate 74 in North Carolina

From Wikipedia, the free encyclopedia

Interstate 74 marker
Interstate 74
Open segments of I-74 as of March 2015 in red
Route information
Maintained by NCDOT
Length124.91 mi[1][2][3][4] (201.02 km)
Existed1997–present
Major junctions
West end I-77 at the Virginia state line
 
East end US 74 / NC 41 near Lumberton
Location
CountiesSurry; Forsyth, Guilford, Randolph, Montgomery, Richmond; Robeson
Highway system
NC 73 US 74

Interstate 74 (I-74) is a partially completed part of the Interstate Highway System that will eventually run from Davenport, Iowa to Myrtle Beach, South Carolina. In the U.S. state of North Carolina, I-74 currently exists in three distinct segments; from I-77 at the Virginia state line to U.S. Route 52 (US 52) near Mount Airy, from I-40 in Winston-Salem to US 220 near Ellerbe, and from US 74 and US 74 Business near Maxton to US 74/North Carolina Highway 41 (NC 41) near Lumberton. I-74 has an extensive concurrency with I-73 from Randleman to Ellerbe in Central North Carolina. When completed, I-74 will link the cities of Mount Airy, Winston-Salem, High Point, Rockingham, Laurinburg, and Lumberton.

The Intermodal Surface Transportation and Efficiency Act of 1991 (ISTEA) authorized a new high priority transportation corridor from Michigan to Myrtle Beach, South Carolina, originally to be I-73. Conflicts over the routing of I-73 led to a compromise in 1995 that created a proposed extension of Interstate 74 from Cincinnati, Ohio to Myrtle Beach. The first section of I-74 was completed on August 27, 1996 between Steeds and Ulah, North Carolina. I-74 replaced NC 752 in 1998 near Mount Airy, and the entirety of the Mount Airy segment was completed by 2000. A segment of the Interstate was opened in 2008 between Maxton and Lumberton, creating the third segment of I-74 in North Carolina. In 2012, I-74 was extended from Ellerbe to Winston-Salem along US 311. The Central North Carolina segment was extended south in June 2013 and June 2018 in concurrency with I-73 and US 220 to Randleman.

Route description[]

As of September 27, 2018, there is a total of 124.91 miles (201.02 km) of I-74, broken in three segments across the state: Mount Airy, the Piedmont Triad and Laurinburg areas.[5]

Mount Airy[]

Southern terminus of the Mount Airy segment of I-74. Pilot Mountain can be seen in the background.

The first section of I-74 begins at the Virginia state line (overlapped with I-77 for approximately 4 miles (6.4 km). After separation, it goes east and connects to US 52 near Mount Airy, where the first section ends.

I-74 is to be routed along US 52 from Mount Airy to Bethania, where it will then separate onto the new Winston-Salem Northern Beltway and go east around Winston-Salem before connecting to existing I-74 south of Kernersville. Under a new accelerated construction plan for the Beltway, right-of-way acquisition began in 2012 and construction started in December 2014. Until construction is completed, travelers wanting to connect between the first and second section of I-74 should stay on US 52 through downtown Winston-Salem, and then take I-40 East to I-74 East towards High Point.[6]

I-73/I-74/US 220, near Asheboro

Piedmont Triad[]

The second section of I-74 extends from the intersection with I-40 in Southeastern Winston-Salem to High Point. Until January 2019, this section of I-74 was concurrent with US 311. This section was designated despite not having 10-foot shoulders, with the promise that shoulders would be widened later. Signs were installed by August 2014. This section connects directly to another section,[7] called the High Point East Belt. It connects High Point with both I-85 Business and I-85. Construction completed on June 7, 2013 extended the freeway an additional 8 miles to US 220/I-73 at mile marker 86 in Randleman.[citation needed] The highway was originally to be completed by October 2012.[8]

I-74 joins with I-73/US 220 South in Randleman going south to Asheboro. The freeway is already completed, but was not allowed to be signed as a full Interstate until the segment through Asheboro was upgraded to Interstate Highway standards in December 2013.[citation needed] The fourth section of I-74 (and I-73) starts along a bypass of Asheboro where a project to improve US 220 to Interstate standards was completed, and Interstate signs went up in 2012.[7][9]

I-74 continues concurrently with I-73 and US 220 between I-73 mile markers 68-42 (26 miles (42 km)), the first section marked as I-74 (and I-73) in North Carolina in 1997. It continues south bypassing the towns of Seagrove, Biscoe and Candor. Visitor centers (completed in 2010) are located eastbound and westbound at mile marker 61.[10] After Exit 41 U.S. 220 leaves the freeway, the route continues as I-73, I-74 for another 16 miles (26 km) towards Rockingham. Though this part of I-73/I-74 was completed in 2008 and is up to Interstate standards, it was initially signed as a future Interstate route because it had not been accepted into the Interstate Highway System by the FHWA by the time it was opened, necessitating the posting of future shields. This situation was remedied on July 7, 2011 when the FHWA approved the addition of this segment to the Interstate Highway System.[11] The route was finally signed as Interstates 73 and 74 in the fall of 2013.[citation needed]

I-73/I-74/US 220, near Biscoe

In late 2018, this segment was extended by 2.91 miles (4.68 km), from US 220/Haywood Cemetery Road to a partially completed trumpet interchange on US 220 north of Rockingham. A bypass under construction will extend this stretch to US 74 Bypass south of Rockingham.[citation needed]

Sandhills[]

At Rockingham, Future I-73 and I-74 will separate from current US 220 along a to-be-built bypass around the west of the city and then join the existing US 74 bypass freeway, which goes south around Rockingham and Hamlet. The first section of the Bypass, four miles of upgraded US 220, is under construction with a planned completion date of March 2018.[citation needed] Future I-73 ends near the NC 38 exit where it is planned to be routed south into South Carolina. Future I-74 continues to the end of the freeway. Between Hamlet and Laurinburg is an at-grade expressway that will eventually be upgraded to Interstate standards.[citation needed] At Laurinburg, I-74 is to use the Laurinburg Bypass was at the standard North Carolina freeway grade and signed as I-74 in 2008; however, NCDOT had to remove the signage the following year when FHWA ruled against using them until the freeway was up to Interstate standards.

The third section of I-74 is officially named the American Indian Highway, completed in 2008, this (19 miles (31 km)) section stretches from Maxton to south of Lumberton, connecting with I-95/US 301.[12] After NC 41, I-74 ends for the final time as the highway continues on as an at-grade expressway signed as US 74/Future I-74 Corridor.[citation needed]

East of I-95[]

I-74/US 74 near the intersection with I-95 in Lumberton

Future I-74 is to continue to follow US 74, going through the city of Whiteville and bypassing the town of Lake Waccamaw. While there are no funded projects to upgrade the entire highway to Interstate standards, NCDOT is funding several smaller projects to replace intersections with interchanges for several of the remaining cross streets, including for NC 72/NC 130 north of Boardman and replacing other intersections with grade separations, such as with Old US 74 near Evergreen over the next ten years.[citation needed] Before the town of Bolton, it will separate from US 74 onto a proposed new freeway towards Shallotte, then go west on the proposed extension of the Carolina Bays Parkway into South Carolina. This entire section of I-74 is still under a Feasibility Study with several possible routing options, it thus may take years before reaching South Carolina. Current NCDOT plans suggest that construction may not begin until after 2020, and that this will likely be the last section of I-74 to be completed.[13][14]

An interchange at Boardman Road has begun construction starting May 25, 2021 and is scheduled for completion in 2024. Another interchange at NC 72 & NC 130 is due to start in 2022. A third project, now combined, would build an interchange at Chauncey Town Road (SR 1735) and a overpass at Old Lake Road (SR 1740) starting in 2025 for an estimated cost of $30 million for both projects. This would almost build a completed freeway to the NC 211 interchange in Bolton, North Carolina with one exception: an at-grade intersection at US-74/Creek Road (SR 2225) that would need to be closed.

Alternate names[]

Though the highway is commonly known as I-74 throughout the state, the highway does have other known names it uses locally in areas.

  • American Indian Highway—official name of the 19 miles (31 km) section of I-74 in Robeson County (mile marker 191-213). It is named to honor the large American Indian population in Robeson County.[12]
  • Blue Star Memorial Highway—unofficial North Carolina honorary name of I-74 in Randolph County (dedicated on June 7, 2013).[15][16]
  • High Point East Belt—road name in Guilford County.

History[]

The Intermodal Surface Transportation and Efficiency Act (ISTEA) of 1991 initially authorized the new high priority transportation corridor 5, tentatively known as I-73, to travel from Michigan to South Carolina.[citation needed] Because of several disputes to the routing, a compromise was reached in 1995, by Senator John Warner and Senator Lauch Faircloth, that extended I-74 from its then current eastern terminus of Cincinnati, Ohio, to overlap I-73. (Original plans called for I-73 to run through Winston-Salem and Mt. Airy, but when its alignment was shifted to serve Greensboro instead, this compromise resulted in I-74 using the Winston-Salem to Mt. Airy route.) In Virginia, I-74 would follow I-77 into North Carolina, while I-73 would go east to Roanoke then south along US 220 towards Greensboro.[17][18][19] However, when I-73 crossed a border between two states, the federal law authorizing the road required that the two states agree that their sections meet. Originally, both Carolinas selected a route running south from Rockingham, North Carolina. North Carolina had more money to spend on roads, though,[20] and on May 10, 1995, the U.S. Senate Environment and Public Works Committee approved North Carolina's plan for I-73 to run eastward to the coast and enter South Carolina at North Myrtle Beach.[21] Another compromise, between Senator Lauch Faircloth and Senator Strom Thurmond, agreed to have both interstates enter South Carolina: I-73 south of Rockingham and I-74 south of Wilmington.[22][23] After later amendments and the Transportation Equity Act for the 21st Century of 1996 (TEA-21), on July 25, 1996, AASHTO accepted Interstates 73/74 into the Interstate Highway System within the states of South Carolina, North Carolina, and Virginia.[citation needed]

I-74 & I-77 near Pine Ridge

The 12.6 miles (20.3 km) portion from south of Steeds north to south of Ulah was completed August 27, 1996, and was the first road marked as I-74 (and I-73).[24] Future signage was also installed north to the Greensboro area.[25] The remainder of 26 miles (42 km) of existing and new freeway between Ulah and Candor was also signed as I-73/I-74 along US 220.[citation needed] In 1998, NC 752, a freeway spur of I-77 was renumbered as the segment of completed I-74, from I-77 to US 601. On June 30, 1999, the freeway was extended an additional 5 miles (8.0 km) to US 52, south of Mount Airy. In April 2001, I-74 was overlapped with I-77 from the Virginia state line to exit 101.[citation needed]

In January 2008, a 16.8-mile (27.0 km) section of freeway was completed from Candor to Ellerbe; however, it was signed Future I-73/I-74.[26] On November 22, 2010, a 14-mile (23 km) section (known as the East Belt) was added between North Main Street in High Point to Cedar Square Road near Glenola. This also includes the 6.4 miles (10.3 km) section of new freeway that opened between I-85 Business Cedar Square Road.[27] On October 4, 2012, I-74 was extended west from High Point to I-40, in Winston-Salem.[28]

On June 7, 2013, I-74 extended 8 miles (13 km) east onto new primary routing from Cedar Square Road to I-73/US 220, near Randleman. Continuing in concurrency with I-73/US 220, it now connects two segments of the Interstate from Winston-Salem to Candor.

American Indian Highway and Laurinburg Bypass[]

On September 26, 2008, a 19-mile (31 km) section of I-74/US 74 was opened between Maxton to NC 41 near Lumberton, known as the American Indian Highway.[citation needed] The Laurinburg Bypass was also resigned I-74/US 74 at the same time.[citation needed] The following year the Laurinburg Bypass was removed of its I-74 designation by NCDOT, during the summer, after a ruling from the FHWA (it was re-signed as a Future I-74 Corridor). The reason was that the section, though a freeway by North Carolina standards, it was not up to Interstate standards. It was also at this same time that NCDOT fixed an exit number error along mile markers 181-191.[citation needed]

North Carolina Highway 752[]

North Carolina Highway 752 marker

North Carolina Highway 752

LocationPine Ridge, North Carolina
Length1.0 mi[29] (1.6 km)
Existed1994–1998

North Carolina Highway 752 (NC 752) was the designation of the four-lane limited access highway that traversed from I-77 to NC 89, near Pine Ridge. Established in 1994, it was a 1-mile (1.6 km) freeway spur. In 1998, the freeway was extended to US 601 and was renumbered as I-74. Its short four-year existence was simply to be a placeholder for I-74.[citation needed]

Future[]

Pilot Mountain Parkway

From Mount Airy to Rural Hall, US 52 is planned to be upgraded to Interstate standards. However it is currently flagged "Scheduled for Reprioritization", with no estimated cost or date established.[30]

The section from Rockingham-Hamlet Bypass to Laurinburg Bypass is planned to be upgraded to Interstate standards. However it is currently flagged "Scheduled for Reprioritization", with no estimated cost or date established.[31] When this section opened it was signed "Future I-74" but those signs were taken down in Fall 2016.[citation needed]

A proposed new freeway in Columbus and Brunswick counties would traverse from Whiteville to the Carolina Bays Parkway in South Carolina. However it is currently flagged "Scheduled for Reprioritization," with no estimated cost or date established.[13][14][32][33]

Winston-Salem Northern Beltway[]

North Carolina Highway 74 marker

North Carolina Highway 74

LocationWinston-Salem, North Carolina
Length5.5 mi (8.9 km)
Existed2020–present

The Winston-Salem Northern Beltway is an under construction freeway loop around the North Carolina city of Winston-Salem. The western section has been designated as North Carolina Highway 452 (NC 452), which will later become I-274 when completed, and the eastern section of the beltway is designated as North Carolina Highway 74 (NC 74), which will later become part of I-74 when completed.[34][35]

On September 7, 2011, North Carolina Governor Bev Perdue announced that construction of a part of the eastern leg of the beltway would begin in 2014. The section to be built connects US 158 to I-40 Bus. (now US 421/Salem Parkway). Right-of-way acquisition began in 2012, and cost $34 million; construction was estimated to cost $156 million.[36][37] Construction on the segment, Project U-2579B; commenced in December 2014,[6][37] with an anticipated completion date of November 2018.[citation needed] However, after delays, including an opening date of fall 2019,[35] it was finally opened to traffic on September 5, 2020.[38]

Since then, funding has been allocated to complete the remaining sections of NC 74 between US 52 and the current I-74 (formerly cosigned with US 311), starting with the segment between US 311 and US 158, known as Project U-2579C; in October 2017.[citation needed] Construction on this segment began in 2018,[citation needed] this section has since opened to traffic effective December 23, 2020.[39]

That same year, a contract for the segment between NC 66 and US 311, Projects U-2579D, U-2579E, and U-2579F; was awarded. Actual construction began April 2019 and is scheduled to be completed in September 2021.[39][35] Next, construction on the segments between I-74 and US 421/Salem Parkway, Projects U-2579AA and U-2579AB; are scheduled to begin in 2020,[39][6] and will open in 2024.[35] Construction on the interchange with US 52, which began in 2019,[40] is scheduled to be completed in September 2022.[35]

Rockingham bypass[]

A western bypass of Rockingham is planned, beginning at the partially-built trumpet interchange with US 220 where I-73 and I-74 currently end, and running southwest to the trumpet interchange between US 74 and US 74 Business, which will be reconfigured to accommodate the new bypass. Construction was initially scheduled for 2026, but was rescheduled for late 2019, and is planned to last three years, costing $146.1 million.[41][42] Upon completion of the bypass, I-74 will be designated along its length and along US 74 around Rockingham and Hamlet, terminating east of Hamlet at US 74 Business.[43] The bypass will also carry I-73, which will terminate at the interchange with US 74 west of Rockingham until the section of I-73 extending into South Carolina is completed.[43]

Exit list[]

CountyLocationmikmExitDestinationsNotes
Surry0.00.0 I-77 north – WythevilleWestern terminus of I-74 at the Virginia state line
Pine Ridge5.08.05 I-77 south – StatesvilleSouth end of I-77 overlap
5.69.06 NC 89 – Mount Airy
7.812.68Red Brush Road
Mount Airy11.017.711 US 601 – Mount Airy, Dobson
13.020.913Park Drive
17.027.417 US 52 north – Mount Airy
Route transition from I-74 to Future I-74
Cook School RoadExisting interchanges of US 52 (upgrade to Interstate standards, unfunded)[44]
West Main Street – Pilot Mountain
Pilot Mountain NC 268 – Pilot Mountain, Elkin
Pilot Knob Park Road – Pilot Mountain State Park
StokesPerch Road – Pinnacle
ForsythKingSouth Main Street – King, Tobaccoville
Moore-RJR Drive
Rural HallWestinghouse Road
41A NC 65 – Rural Hall, BethaniaCompletion scheduled for October 2019 (preliminary work for Northern Beltway project)[6][45]
Bethania41B US 52 south – Winston-SalemUnder construction (completion scheduled for September 2022)
Winston-Salem42 NC 66 (University Parkway)Under construction (completion scheduled for September 2021)[6][40][45]
43 NC 8 (Germanton Road)
45Baux Mountain Road
Walkertown49 US 311 (New Walkertown Road)Segment currently designated as NC 74, opened on December 23, 2020
50 US 158 (Reidsville Road)Segment currently designated as NC 74, opened on September 5, 2020[6][45][38]
Kernersville53 US 421 / NC 150 (Salem Parkway)
Kernersville RoadFuture interchange
Winston-Salem I-40 – Statesville, GreensboroFuture interchange
55.288.8Route transition from Future I-74 to I-74
55 I-40 – Statesville, GreensboroTemporary designation of I-74, future NC 192
56.691.156Ridgewood Road
Union Cross NC 192 west – Winston-SalemFuture interchange
58.994.859Union Cross Road
60.397.060High Point Road
Horneytown63.0101.463 NC 66 – Kernersville
GuilfordHigh Point65.0104.665North Main Street
66.4106.966Johnson Street
67.4108.567 NC 68 (Eastchester Drive) – High Point, GreensboroTo Piedmont Triad International Airport and High Point University
69.0111.069Greensboro Road
70.3113.170Martin Luther King Jr. DriveFormerly named Kivett Drive[46]
71.1114.471AEast Green Drive
71.7115.471B I-85 BL / US 29 / US 70 – Thomasville, Greensboro
Archdale75.2121.075 I-85 – Charlotte, Greensboro
RandolphGlenola79.4127.879Cedar Square Road
Sophia84.0135.284Old US Highway 311
Randleman86.8139.786 I-73 north / US 220 north – GreensboroNorth end of I-73/US 220 overlap; eastbound left exit
Asheboro87.9141.579Pineview Street
89.3143.777Spero Road
90.7146.076

To US 220 Bus. north / North Fayetteville Street / Vision Drive
91.5147.375Presnell Street
92.4148.774 NC 42 – AsheboroLeft exit; western terminus of NC 42
94.0151.372
A-B
A:
US 64 Bus. east / NC 49 north – Raleigh
B:
US 64 Bus. west / NC 49 south – Lexington, Charlotte
To North Carolina Zoo
95.1153.071McDowell Road
70 US 64 – Raleigh, Lexington
98.7158.868
US 220 Bus. north / NC 134 south – Ulah, Troy
To US 220 Alt
100.9162.465New Hope Church RoadTo North Carolina Zoo
Seagrove105.1169.161 NC 705 – Seagrove, Robbins
108.4174.558Black Ankle Road
MontgomeryEther111.1178.856
US 220 Alt. – Ether, Steeds
Star114.2183.852Spies Road – Star, Robbins
Biscoe117.4188.949 NC 24 / NC 27 – Biscoe, Carthage, Troy
Candor122.4197.044 NC 211 – Candor, Pinehurst
Emery125.5202.041
US 220 south / US 220 Alt. north – Candor
South end of US 220 overlap
127.4205.039Tabernacle Church Road
RichmondNorman131.4211.535Moore Street – Norman
133.2214.433 NC 73 – Windblow,
136.5219.730Haywood Parker Road
Ellerbe138.8223.428
To NC 73 west / Millstone Road
141.5227.725 US 220 north – Ellerbe
23Dockery Road / Haywood Cemetery Road
22 I-73 end / US 220 south – RockinghamPartial interchange (rest to be constructed by 2028)[47]
Route transition from I-74 to Future I-74
16
US 74 west / US 74 Bus. east – Wadesboro, Rockingham
Future interchange (funded)[47]
15Galestown Road – CordovaExisting interchanges of US 74

US 1 to US 220 – Rockingham, Southern Pines, Cheraw
NC 177 – Hamlet, Cheraw
NC 38 – Bennettsville
I-73 south – BennettsvilleFuture interchange (unfunded)[48][49]
NC 381 – Hamlet, GibsonExisting interchanges of US 74[31]

US 74 Bus. west – Hamlet
ScotlandLaurel Hill NC 144 east (Old Wire Road) – WagramExisting interchanges of US 74 (upgrade to Interstate standards, unfunded)[31][citation needed]
180.4290.3181
US 74 Bus. – Laurinburg
181.2291.6182 NC 79 – Laurinburg, Gibson
Laurinburg182.8294.2183 US 15 / US 401 / US 501 north – Fayetteville, Aberdeen, BennettsvilleExisting interchanges of US 74 / US 501 (upgrade to Interstate standards, unfunded)[citation needed]
183.2294.8184

US 15 Bus. / US 401 Bus. – Laurinburg
184.1296.3185 US 501 south – Rowland, Myrtle Beach
185.8299.0186

To US 74 Bus. (Highland Road) – Laurinburg
Existing interchanges of US 74 (upgrade to Interstate standards, unfunded)[citation needed]
186.6300.3187
US 74 Bus. – Laurinburg, Maxton
189.4304.8190Airport Road – Laurinburg–Maxton Airport, Maxton
RobesonMaxton190.8307.1191 NC 71 – Maxton, Red Springs
194.0312.2Route transition from Future I-74 to I-74
194

US 74 Alt. east / US 74 Bus. west – Maxton
Signed as 194A (west) and 194B (east)
197.0317.0197Cabinet Shop Road
200.7323.0200 NC 710 – Pembroke, Red Springs
203.9328.1203Dew Road – Pembroke
207.9334.6207Back Swamp Road
Lumberton209.3336.8209 I-95 / US 301 – Lumberton, Fayetteville, FlorenceSigned as 209A (south) and 209B (north)
210.5338.8210
US 74 Alt. west
213.1343.0213 NC 41 – Lumberton, Fairmont
213.6343.8Route transition from I-74 to Future I-74
219.4353.1219Broadridge Road (SR 2220)Completed November 2019
222 NC 72 west / NC 130 west – Lumberton, FairmontPreliminary engineering scheduled to begin in January (start scheduled for 2022)
ColumbusBoardman225Old Boardman Road (SR 1506)Contract was awarded April 20, 2021 (was rescheduled for 2029 start). Interchange construction has started effective May 25, 2021 (completion scheduled for February 2025).
Evergreen228.9368.4228 NC 242 (Haynes Lennon Highway) – Bladenboro, Cerro GordoCurrent interchanges of US 74 (upgrade to Interstate standards, unfunded)[13][14]
Chadbourn233.7376.1233
US 74 Bus. east / NC 130 east / NC 410 – Chadbourn, Bladenboro
235.7379.3235 US 76 west – Chadbourn, Fair BluffExisting interchanges of US 74 / US 76 (upgrade to Interstate standards, unfunded)[13][14]
238.5383.8238Union Valley Road
Whiteville241.4388.5241 US 701 – Whiteville, Clarkton
244.3393.2244


US 74 Bus. / US 76 Bus. west to NC 214 east – Whiteville, Lake Waccamaw
Hallsboro248.0399.1248Hallsboro Road (SR 1001)Opened to traffic June 12, 2020
Lake WaccamawChauncey Town Road (SR 1735)Preliminary engineering scheduled to begin in January (start date scheduled for 2022)
Old Lake Road (SR 1740)Preliminary engineering scheduled to begin in January (start date scheduled for 2022; combined with intersection above)
Bolton258.4415.9258 NC 211 – Bladenboro, SouthportLast exit with I-74 exit number on US 74
Proposed Interstate 74 corridor from US 74/US 76 to US 17/South Carolina state line (route unconfirmed).[13][14][32][33]
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Concurrency terminus
  •       Incomplete access
  •       Route transition
  •       Unopened

See also[]

  • Blank shield.svg U.S. Roads portal

References[]

  1. ^ Federal Highway Administration (October 31, 2002). "Table 1: Main Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways as of October 31, 2002". Route Log and Finder List. Federal Highway Administration. Retrieved August 29, 2012.
  2. ^ Google (February 14, 2013). "Interstate 74 (Mount Airy Segment)" (Map). Google Maps. Google. Retrieved February 14, 2013.
  3. ^ Google (October 26, 2013). "Interstate 74 (Piedmont Triad Segment)" (Map). Google Maps. Google. Retrieved October 26, 2013.
  4. ^ Google (February 14, 2013). "Interstate 74 (Laurinburg Segment)" (Map). Google Maps. Google. Retrieved February 14, 2013.
  5. ^ Proposed I-73 and I-74 Routes (PDF) (Map). North Carolina Department of Transportation. Retrieved May 12, 2014.
  6. ^ Jump up to: a b c d e f North Carolina Department of Transportation. "Winston-Salem Northern Beltway". North Carolina Department of Transportation. Archived from the original on October 6, 2011. Retrieved November 26, 2011.
  7. ^ Jump up to: a b Wesley Young (March 4, 2013). "Road to the Future". Winston-Salem Journal. p. A4.
  8. ^ "I-74/US 311 Connector Expected to Open on Friday". MyFox8.com. June 4, 2013.[full citation needed]
  9. ^ North Carolina Department of Transportation. "Contract C202472". NCDOT Construction Progress Report. North Carolina Department of Transportation. Retrieved June 4, 2013.
  10. ^ North Carolina Department of Transportation. "North Carolina Rest Area System". North Carolina Department of Transportation. Retrieved January 27, 2011.
  11. ^ Mendez, Victor M. (July 7, 2011). "Letter to Terry R. Gibson, P.E., State Highway Administrator, North Carolina Department of Transportation" (PDF). Federal Highway Administration. Retrieved August 11, 2012.
  12. ^ Jump up to: a b North Carolina Department of Transportation (November 18, 2010). "I-74 'The American Indian Highway' Naming Ceremony" (Press release). North Carolina Department of Transportation. Archived from the original on December 25, 2012. Retrieved December 31, 2010.
  13. ^ Jump up to: a b c d e North Carolina Department of Transportation. "I-74 Feasibility Study". North Carolina Department of Transportation. Archived from the original on June 5, 2013. Retrieved August 27, 2012.
  14. ^ Jump up to: a b c d e I-74 Feasibility Map (PDF) (Map). North Carolina Department of Transportation. Retrieved August 27, 2012.
  15. ^ "NCDOT: NC Blue Star Memorial Marker Locations". Archived from the original on May 22, 2011. Retrieved June 7, 2013.
  16. ^ North Carolina Department of Transportation. "Final Section of US 311 Bypass Opens in Randolph County". North Carolina Department of Transportation. Retrieved June 7, 2013.
  17. ^ Lounsbury, Helen (November 11, 1993). "Road to Roanoke Vital, Group Says Lobbying for New Interstate". News & Record. Greensboro, North Carolina. p. B3. ISSN 0747-1858.
  18. ^ Catanoso, Justin (April 14, 1995). "New Proposal for I-73 Stirs Triad Rivalry". News & Record. Greensboro, NC. p. B1. ISSN 0747-1858.
  19. ^ Catanoso, Justin (May 2, 1995). "New Interstates May Cross Triad". News & Record. Greensboro, North Carolina. p. A1. ISSN 0747-1858.
  20. ^ Monk, John (April 11, 1995). "Despite S.C. Objections, N.C. Prepares I-73 Link". The State. Columbia, SC. p. B5.
  21. ^ Pope, Charles (May 11, 1995). "I-73 Rolls Through Angry Thurmond's Roadblocks". The State. Columbia, SC. p. B1.
  22. ^ Soraghan, Mike (June 17, 1995). "Carolinas Make a Deal on Routes of New Interstates". The State. Columbia, SC. p. B5.
  23. ^ Porter, Arlie (June 4, 1995). "I-73: Paved with good intentions?". Post and Courier. Charleston, SC. p. A23.
  24. ^ McKay, Rich (August 28, 1996). "US 220 Widened Near Seagrove". News & Record. Greensboro, North Carolina. p. B2. ISSN 0747-1858.
  25. ^ Hall, Tony (March 28, 1997). "State Making Good Progress on Interstates". News & Record. Greensboro, North Carolina. p. B2. ISSN 0747-1858.
  26. ^ MacCallum, Tom (January 8, 2008). "Ellerbe Bypass Opens After Years of Construction". Richmond County Daily Journal. Rockingham, North Carolina.[page needed]
  27. ^ North Carolina Department of Transportation (November 22, 2010). "NCDOT Opens I-74/US 311 Bypass Near High Point" (Press release). North Carolina Department of Transportation. Retrieved December 31, 2010.
  28. ^ North Carolina Department of Transportation (October 4, 2012). "I-74 Route Change (2012-10-04)" (PDF). North Carolina Department of Transportation. Retrieved February 14, 2013.
  29. ^ Google (June 9, 2013). "North Carolina Highway 752" (Map). Google Maps. Google. Retrieved June 9, 2013.
  30. ^ North Carolina Department of Transportation. "Project I-4404". Project Details. North Carolina Department of Transportation. Archived from the original on January 9, 2012. Retrieved January 22, 2012.
  31. ^ Jump up to: a b c North Carolina Department of Transportation. "Project I-3801". Project Details. North Carolina Department of Transportation. Archived from the original on October 29, 2011. Retrieved January 22, 2012.
  32. ^ Jump up to: a b North Carolina Department of Transportation. "Project R-3436". Project Details. North Carolina Department of Transportation. Archived from the original on October 29, 2011. Retrieved August 27, 2012.
  33. ^ Jump up to: a b North Carolina Department of Transportation. "Carolina Bays Parkway". Project Details. North Carolina Department of Transportation. Archived from the original on October 29, 2011. Retrieved August 27, 2012.
  34. ^ "Route Change (1999-03-26)" (PDF). North Carolina Department of Transportation. March 26, 1999. Retrieved June 20, 2014.
  35. ^ Jump up to: a b c d e Young, Wesley (July 27, 2019). "First beltway segment opens this fall". Winston-Salem Journal. Retrieved December 27, 2019.
  36. ^ North Carolina Department of Transportation. "Winston-Salem Northern Beltway". North Carolina Department of Transportation. Archived from the original on October 6, 2011. Retrieved November 26, 2011.
  37. ^ Jump up to: a b Garber, Paul (September 7, 2011). "Construction of first segment of Northern Beltway will begin in 2014, governor says". Winston-Salem Journal. Retrieved January 22, 2012.
  38. ^ Jump up to: a b Young, Wesley (September 4, 2020). "6 new lanes, all 65 mph opening from Salem Parkway to Reidsville Road". Winston-Salem Journal. Retrieved September 5, 2020.
  39. ^ Jump up to: a b c Young, Wesley (April 5, 2018). "Three new Northern Beltway segments in Forsyth County under contract". Winston-Salem Journal. Retrieved December 27, 2019.
  40. ^ Jump up to: a b Young, Wesley (September 29, 2018). "Work starts next year on Beltway interchange with U.S. 52". Winston-Salem Journal. Retrieved January 23, 2019.
  41. ^ Stone, Gavin (January 10, 2019). "Bypass project around Rockingham accelerated from 2026 to 2020". Richmond County Daily Journal. Retrieved November 7, 2019.
  42. ^ North Carolina Department of Transportation (November 5, 2019). "NCDOT Awards Contract for Rockingham Bypass" (Press release). North Carolina Department of Transportation. Retrieved December 27, 2019.
  43. ^ Jump up to: a b "Signing Plans 2" (PDF). North Carolina Department of Transportation. July 5, 2019. Retrieved December 27, 2018.
  44. ^ North Carolina Department of Transportation. "Project #I-4404". Project Details. North Carolina Department of Transportation. Archived from the original on October 29, 2011. Retrieved August 25, 2012.
  45. ^ Jump up to: a b c North Carolina Department of Transportation. "Project U-2579". Project Details. North Carolina Department of Transportation. Archived from the original on October 29, 2011. Retrieved August 27, 2012.
  46. ^ "High Point's Kivett Drive to be renamed Martin Luther King Jr. Boulevard". Winston-Salem, North Carolina: WXII-TV. March 25, 2015. Retrieved December 9, 2015.
  47. ^ Jump up to: a b North Carolina Department of Transportation. "Project #R-3421". Project Details. North Carolina Department of Transportation. Archived from the original on October 29, 2011. Retrieved June 7, 2013.
  48. ^ I-73 Northern Map (PDF) (Map). North Carolina Department of Transportation. Wallace inset. Retrieved August 25, 2012.
  49. ^ North Carolina Department of Transportation. "Project #I-4923". Project Details. North Carolina Department of Transportation. Archived from the original on October 29, 2011. Retrieved August 27, 2012.

External links[]

Route map:

KML is from Wikidata
Interstate 74
Previous state:
Virginia
North Carolina Next state:
South Carolina
Retrieved from ""