Fontainebleau Las Vegas
Fontainebleau Las Vegas.JPG
Fontainebleau Las Vegas in 2009
Fontainebleau Las Vegas is located in Las Vegas Strip
Fontainebleau Las Vegas
Location Winchester, Nevada, U.S.
Address 2777 South Las Vegas Boulevard
Opening dateLate 2023
No. of rooms3,780
Total gaming space100,000 sq ft (9,300 m2)
Casino typeLand-based
OwnerFontainebleau Development
Koch Real Estate Investments
ArchitectDiller Scofidio + Renfro
Previous namesThe Drew Las Vegas (2018–2021)
Coordinates36°8′15″N 115°9′32″W / 36.13750°N 115.15889°W / 36.13750; -115.15889Coordinates: 36°8′15″N 115°9′32″W / 36.13750°N 115.15889°W / 36.13750; -115.15889
Websitewww.fontainebleaulasvegas.com

The Fontainebleau Las Vegas (formerly The Drew Las Vegas) is an unfinished hotel and casino on the Las Vegas Strip in Winchester, Nevada. It is on the 24.5-acre (9.9 ha) site previously occupied by the El Rancho Hotel and Casino and the Algiers Hotel. The project was announced as Fontainebleau Las Vegas in May 2005, with initial plans to begin construction by March 2006, and to have the resort opened by 2008. It was intended to be a sister property to the Fontainebleau Miami Beach hotel. It would be developed by Fontainebleau Resorts, which was owned by Jeff Soffer.

Construction began in February 2007, and the hotel tower was topped off on November 14, 2008. A group of banks had agreed to provide financing, but the group was sued by Fontainebleau in April 2009, after it refused to continue funding the project. Construction was slowed down considerably, and was eventually put on hold in June 2009, when the project went into Chapter 11 bankruptcy. The project was 70-percent completed, and the opening had been scheduled for October 2009. The project, upon completion, was to include a 95,000 sq ft (8,800 m2) casino, 2,871 hotel rooms, and 1,018 condo hotel units, among other features. The hotel tower rises 68 stories, standing 737 feet high. It is the tallest building in Las Vegas and in the state, excluding the nearby Strat observation tower. The Fontainebleau was designed by Carlos Zapata Studio with Bergman Walls and Associates as the executive architect.

Carl Icahn purchased the project out of bankruptcy in 2010, but he never restarted construction. In August 2017, the unfinished resort was sold to investment firms Witkoff Group and New Valley LLC for $600 million. In February 2018, Witkoff and Marriott International announced a partnership to open the resort as The Drew Las Vegas. Upon completion, the project would include a casino as well as three hotels with 3,780 rooms; plans for condominiums were scrapped. Witkoff Group founder Steve Witkoff named The Drew after his deceased 22-year-old son, Andrew Witkoff, who died of an OxyContin overdose in 2011. The Drew was intended to open in 2022. However, construction stopped in March 2020, due to the COVID-19 pandemic in Nevada.

In February 2021, Soffer bought back the project through his company Fontainebleau Development, with Koch Real Estate Investments as a partner. Soffer named it back to Fontainebleau Las Vegas and intends to open it in late 2023.

History[]

Background[]

Fontainebleau logo (2008)

The property was initially occupied by the Thunderbird hotel and casino, opened in 1948. It was later renamed as the Silverbird, and then as the El Rancho, before closing in 1992.[5] Turnberry Associates purchased the 21-acre (8.5 ha)[6] property in 2000, for $45 million. The company imploded the El Rancho later that year, to make room for a London-themed resort. The project was ultimately cancelled because of an economic downturn caused by the September 11 attacks.[5][7]

A privately held company known as Fontainebleau Resorts was later co-founded by Jeff Soffer, who was the chairman and majority owner of Turnberry Associates.[8] In March 2005, Turnberry Associates paid $97 million to purchase 3.6 acres (1.5 ha) of adjacent property – south of the former El Rancho – that had previously been occupied by the Algiers Hotel. The Algiers was to be replaced by the Krystle Sands, a high-rise condominium project that was cancelled earlier that month.[9][6][10] The purchase gave Fontainebleau Resorts and Turnberry a total of 25 acres (10 ha).[7]

Fontainebleau Resorts and Turnberry announced the Fontainebleau Las Vegas on May 12, 2005, as a casino and hotel resort. The project would be a sister property to the Fontainebleau Miami Beach hotel, purchased by Fontainebleau Resorts earlier that year. The Fontainebleau would be built on the former property of the El Rancho and Algiers, located immediately west of the Turnberry Place high-rise condominium complex. Groundbreaking was initially expected to occur by March 2006, with the project planned to be opened by 2008.[7][11] At the time, the company was considering the addition of condominiums to the project, but was still working on the final design plans.[11] Glenn Schaeffer, the former president of Mandalay Resort Group, was hired to oversee the new project as the president and chief executive officer of Fontainebleau Resorts.[7][11]

The Fontainebleau was designed by Carlos Zapata Studio, with Bergman Walls and Associates serving as the executive architect.[12][13] The resort would have a total of 3.4 million square feet,[14] including a 100,000 sq ft (9,300 m2) casino, and 353,000 sq ft (32,800 m2) of convention space.[15] The hotel tower would have 3,889 rooms, including 2,871 hotel rooms and 1,018 condo hotel units.[15][16] Condominiums were to range between 540 sq ft (50 m2) to 900 sq ft (84 m2); 17 units would be built on each floor, in the center of the tower.[16] In addition, the resort would have more than two dozen restaurants, a performing arts theater, a spa inspired by the Blue Lagoon in Iceland,[12][17][18] and a 300,000 sq ft (28,000 m2) retail mall known as The Runway.[19] Schaeffer predicted that less than one-third of the resort's revenues would come from its casino.[5]

The Fontainebleau would be LEED-certified,[13] and would have technologically advanced features. The resort would include a large antenna to provide wireless coverage for cell service and Internet access throughout the property. Connectivity issues were common in large resorts because of steel columns and concrete, which interfere with wireless signals.[20] iMac computers would be present in each hotel room, replacing information binders found in most hotels.[20][21] The computers would be used to request room service and wake-up calls, and to communicate with a concierge or other group members in the hotel. Touch-screen displays would be present throughout the resort, providing information and directions.[20]

Construction[]

Window installation in 2008

Turnberry West Construction began construction of the Fontainebleau Las Vegas in February 2007.[22] The company did not do any of its own work, instead relying on a network of subcontractors.[23] A 26-acre site north of the project was used as a staging area for construction equipment and workers. The property, owned by Archon Corporation, was leased to the Fontainebleau project for $350,000 a month.[24]

Preparation work on the property was underway in April 2007, although an official groundbreaking ceremony was not held. At that time, the project was expected to cost $2.8 billion. Publishing and Broadcasting Limited purchased 19.6 percent of Fontainebleau Resorts for $250 million to help fund the project.[8][25] In June 2007, Fontainebleau Resorts secured approximately $4 billion from a group of banks to pay off debts and to finish its projects, including the Fontainebleau Las Vegas, which was expected to open in fall 2009.[25] The company Ullico would also provide financing to the project.[23]

In July 2007, a 70-person team of ironworkers stopped working in areas of the resort that they said were unsafe. They resumed work after three days, following the implementation of several safety measures.[26] The following month, a construction worker died after a 30-foot fall on the property. Several days later, a large concrete slab in the parking garage fell and caused slabs on two lower floors to collapse. No workers were injured or killed by the three large slabs.[22]

Fontainebleau and Turnberry Place in 2010

The resort's parking garage was to stand seven stories, with the first two floors to be located underground. In mid-2007, plans were approved to increase the garage to 23 stories.[27] Later that year, residents of Turnberry Place alleged that they were deceived by Turnberry, saying they were never notified of the garage's size increase,[27] which would hamper their views.[28][29] Other residents were concerned about the impact of noise and pollutants from the new project.[27]

Soffer said Turnberry did a "respectful job" of building the Fontainebleau hotel tower away from Turnberry Place residents. Soffer also stated that the property was zoned for a hotel and casino, and said that residents knew such a project would ultimately be built on the property: "We're not going to buy a 20-acre property and leave it as a vacant lot. It's a property with proper zoning and nothing was ever promised. It's as simple as that. […] The bottom line is you can't please everyone." Turnberry Place residents planned to have a district judge rule on whether the Clark County Commission should have approved the garage re-design, which was alleged to be in violation of a county ordinance.[27] The judge ruled in favor of the project, stating that the re-design was legally approved.[30] Aside from the garage, residents had also been concerned about potential traffic increases that would be caused by the new resort.[31]

In April 2008, Fontainebleau Resorts stated that the project was fully financed and that progress was continuing, despite other local projects that had suffered financial problems amid the Great Recession. At the time, the project had $2.4 billion in debt. The company had planned to put the Fontainebleau's condo units on sale in September 2008. Between $700 million and $900 million in presales was expected to come from the units. A total of 6,000 people were expected to be employed at Fontainebleau upon its opening.[16]

The hotel tower rises 68 stories,[13][32] standing at 737 feet.[12][14] It is the tallest building in Las Vegas and in the state.[33][34][35][36] The tower was topped off on November 14, 2008. It is a concrete structure that includes 48 elevator shafts.[13]

Financial problems[]

Preview center, located across from the resort

The collapse of Lehman Brothers in September 2008, during the Great Recession, left a financing shortage in the Fontainebleau's retail component. Two months later, Moody's Investors Service warned that failure to fund the retail loan could result in a default for the Fontainebleau. The agency also downgraded the project's debt funding, noting the decline of gaming revenue and the weak demand for condo hotels in Las Vegas.[37] A preview office for the condo units opened in December 2008, with little fanfare. Sales of the units had yet to begin.[18] In early 2009, Standard & Poor's warned that the Fontainebleau would likely face difficulty in making its interest payments upon its opening in October 2009. Fontainebleau Resorts was believed to have enough financing to complete the project, although the sale of its condo units were pivotal to paying off its debt.[17][38] Moody's warned that the project would not be able to sell enough units to reduce its construction debt by the time of opening. The agency also warned of the worsening economy, noting a drop in Las Vegas tourism and gaming demand.[39]

In April 2009, the project filed a $3 billion lawsuit against the group of banking lenders, alleging that they reneged on their agreement to provide $800 million in funding. The banks stated that the loan was terminated because of an unspecified default, a claim that the lawsuit denied.[40][41][42] A "material adverse change" clause was present in the banks' agreement with Fontainebleau, giving the group wide-ranging options for terminating the loan.[43] The possible stop of construction would affect 3,300 workers who were building the resort.[40] Another 1,700 workers were expected to be hired later on to finish the project.[44] The condo units had yet to go on sale, due to weak demand, and Fontainebleau was reassessing the number of units that the project was to include, given the poor state of the economy.[40]

The resort would have a positive impact on the Las Vegas economy and employment, and the banks' decision to rescind financing was met with criticism.[44][19][45] The banks largely declined to comment on the case; they denied wrongdoing but did not specify how the project wound up in default.[46] It was later confirmed that the project had gone substantially over its construction budget, and the banks determined that the project was in default under their credit agreement. The banks also alleged that Fontainebleau officials made inaccurate statements to hide the project's financial problems.[47] According to the banks, Fontainebleau wanted $1.3 billion in debt to be forgiven.[48]

The bank group was led by Bank of America,[49] which began negotiating with Fontainebleau shortly after the lawsuit was filed.[50] Through a separate lending group,[49] the project had $130 million to continue construction while the lawsuit proceeded.[49] However, the second group partially pulled its financing in late April 2009, after the first group rescinded its loan on the project. The latest pulling of funds was substantial enough to affect construction; work was reduced to skeleton crews, and construction proceeded at a slower pace.[49][51] The worker layoffs had the potential to delay the project, depending on whether the same crews would be retained once full construction resumed. In addition, much of the construction equipment on-site – including two tower cranes – was rented and would have to be returned, only to be reassembled again later on.[52] In May 2009, Fontainebleau filed an amendment to its lawsuit, stating that Deutsche Bank, part of the main banking group, had a conflict of interest. The bank had an ownership stake in the upcoming Cosmopolitan resort, also under construction on the Las Vegas Strip. Deutsche Bank was accused of "seeking to destroy the Fontainebleau in order to minimize competition" for the Cosmopolitan. The bank was to provide $80 million to the Fontainebleau.[53][54] The allegations against Deutsche Bank were eventually dropped.[55]

During May 2009, construction consulting firm CCCS International filed a lawsuit against the Fontainebleau, alleging wrongful termination from the project. CCCS was hired as construction manager in 2008. According to the company, Fontainebleau officials said that the project was "severely over budget" and needed a construction manager to provide cost management and auditing services, in order to recover "prior unnecessary overpayments." During its time on the project, CCCS concluded that Fontainebleau was inadequate in its designing, supervising, and scheduling of the project, leading to significant construction delays. In its lawsuit, CCCS alleged the discovery of "fraudulent billing practices and inappropriate payment methods" used by the Fontainebleau, stating that this discovery led to its termination. CCCS also alleged that Fontainebleau did not have financing to fund its consulting services, and that the project failed to disclose this. CCCS stated that it was owed more than $1 million. A Fontainebleau spokesman said that CCCS was fired because it failed to perform its duties.[56][57][58] The Fontainebleau had gone an estimated $375 million over its most recent revised budget, and financial analysts expected the resort to cost at least $3.5 billion upon completion, up substantially from its original cost.[59]

Corporate layoffs began in May 2009, a result of the bank group withholding its loan.[60] Schaeffer was among those who left the project, without explanation.[61][62] Schaeffer had been primarily responsible for securing more than $1 billion in loans for the Fontainebleau, and he was to operate the resort's casino. His departure was considered a poor sign for the project's future, with the October 2009 opening unlikely to happen.[59] The project had approximately 250 construction workers remaining.[62]

Bankruptcy[]

Facing numerous liens and financing problems, the Fontainebleau filed for Chapter 11 bankruptcy on June 9, 2009. The project had 1,000 to 5,000 creditors,[63][64] including various subcontractors who were owed more than $250 million.[14][65] Subcontractors wanted a committee formed to represent them in the bankruptcy proceedings, rather than Turnberry West Construction.[66] The $3 billion lawsuit against the bank group was withdrawn and instead refiled in U.S. bankruptcy court.[46][67] Fontainebleau Las Vegas LLC sought court approval for an immediate $656 million loan from the bank group.[68] However, the banks did not believe that this would be nearly enough to finish construction.[69] Meanwhile, Crown Limited (previously Publishing and Broadcasting Limited) ended any further investment in the Fontainebleau project.[70][71] On June 11, 2009, it was announced that construction had been halted while the project proceeded through bankruptcy. The resort was 70 percent completed, and the site was secured to prevent theft of construction equipment and vandalism of lower floors, which were fully furnished.[14]

Construction on Fontainebleau had begun before the final designs were finished, a common practice that was done for Las Vegas resorts to get them opened sooner. However, this would often result in costly do-over work having to be done. When construction on Fontainebleau was halted, there were still areas of the project that had yet to be finalized. Other areas of the resort, such as the casino and hotel rooms, had undergone numerous redesigns.[72] Restaurants were among the uncompleted portions of the resort, although many hotel rooms had been finished.[73] The project owed more than $2 billion to various creditors. Because of the worsening economy, it was unlikely that the Fontainebleau could pay off such debts even if it opened within the next year. In July 2009, Fontainebleau and its affiliated companies stated that design changes were being considered to contain the project's high construction cost. In addition, Soffer considered providing additional financing himself to get the resort finished.[74] The resort subsequently sought permission in bankruptcy court to cancel events that were scheduled for the first half of 2010, as well as permission to cancel a lease for office space which was to be used for Fontainebleau's employee recruitment center.[75]

A month after the bankruptcy filing, the case was complicated further by term lenders who sued the bank group. In addition, Turnberry West filed a lawsuit against its sister company, Fontainebleau Las Vegas LLC, which owned the project. Turnberry West alleged that its liens against the project took priority over those filed by lenders. Both companies were owned by Soffer. This move, in which Soffer essentially sued himself, was viewed as an attempt to force creditors to supply funding.[76][77][78] Mediation attempts, between Fontainebleau and the banks, were unsuccessful, and a judge determined that the case would go to trial.[79][80] Financial lawsuits involving the Fontainebleau would go on for years.[81] In one case, a group of term lenders sued Soffer, Crown Limited, and Ullico, alleging that they presented false architectural drawings to conceal the project's true construction cost, and that they later conspired to hide the Fontainebleau's financial problems.[82] In Fontainebleau's lawsuit, a judge would eventually rule in Bank of America's favor;[83] the bank later reached a $300 million settlement with lenders.[84]

Prospective buyers and Icahn purchase[]

Exposed, lower-level portions of the resort in 2011

In June 2009, executives from Apollo Management and Wynn Resorts toured the Fontainebleau facility with an interest in purchasing the project.[85][86][79] Ullico was also in discussions with Fontainebleau to help finance the resort's completion, after already contributing $447.6 million to the project.[23] In September 2009, Penn National Gaming emerged as a prospective buyer.[87][88] Penn had toured the project several times,[89] and it sought a partner to help finish the resort.[90] Penn planned to convert the condo units into hotel rooms, and there was also the possibility of renaming the project. The company expected to have the resort opened in late 2011.[89]

In October 2009, a judge overseeing the bankruptcy case ruled that the Fontainebleau project be sold as soon as possible, appointing an examiner to handle the sale.[91] However, the term lenders had wanted the Chapter 11 case converted into a Chapter 7 liquidation.[92] Penn offered $50 million for the project.[89] In November 2009, corporate raider and financier Carl Icahn – who previously controlled American Casino & Entertainment Properties – offered $156 million.[93] A bidding war ensued, and Penn dropped out of the auction in January 2010, after Icahn raised his bid to $156 million.[94][95][96] Meanwhile, real estate developer Luke Brugnara announced that he would place a $170 million bid for the Fontainebleau. Brugnara planned to finish and open the retail portion, using the eventual revenue to complete the hotel tower.[97]

Icahn ultimately won control of the Fontainebleau with a $106 million bid, taking over ownership on February 18, 2010. He also paid $45 million in financing fees during bankruptcy proceedings.[98] Icahn was the only qualified person to bid on the project; two other bids were disqualified because they failed to include a deposit.[99][100] Before deciding on what to do with the Fontainebleau project, Icahn planned to wait for a rebound of the Las Vegas economy.[101][102][103] The project would require up to $1.5 billion to complete construction,[82] and some analysts believed that demolishing the resort would be more cost-effective than trying to complete it.[104][105] While the project sat vacant, it was sometimes used by local firefighters as a training ground for fire drills.[106]

In October 2010, Icahn auctioned off the furnishings previously intended for the resort, an indication that he had no intention of finishing the project.[107] As part of a renovation, the Plaza Hotel & Casino in downtown Las Vegas purchased various furnishings, wallpaper, and tiles that were meant for the Fontainebleau.[108][109] The Buffalo Bill's hotel-casino in Primm, Nevada also purchased $500,000 worth of furnishings for a renovation of its own.[110][111]

A large crane, used for constructing the hotel tower, was eventually dismantled in May 2014. The crane, like the unfinished resort, was considered an eyesore and a reminder of the Great Recession.[104][112] Rusted, lower-floor portions of the unfinished resort were located along the sidewalk on Las Vegas Boulevard, presenting a poor appearance for the area. In 2015, Icahn agreed to county requests for an exterior upgrade, which would help improve the project's appearance. A cosmetic wrap, consisting of fabric and paint, would cover the unfinished portions, similar to the stalled St. Regis tower, also on the Las Vegas Strip.[113] The blue-and-white wrap was eventually added in 2017.[114][115]

In November 2015, Icahn listed the Fontainebleau for sale at an asking price of $650 million. The project was listed through the CBRE Group.[116] The Fontainebleau required another $1.5 billion to finish, and the tower would take up to two years to complete. According to CBRE Group, "Combined with a purchase price of $650 million, it would take less than $2 billion for a buyer to enter or expand on the Strip market. That's about $500,000 per room, just half of the $1 million or more per room to build new."[105] Various rumors persisted over the next few years about a possible sale.[117][118] Richard Bosworth and Juniper Capital Partners wanted to purchase the Fontainebleau, and in early 2017, they approached Brookfield Asset Management as a possible equity partner. Bosworth planned to sell portions of the Fontainebleau to a timeshare operator, while the top floors were to be branded as a Waldorf Astoria hotel. These plans did not work out, and Bosworth and Juniper Capital ultimately bought the nearby Hard Rock Hotel instead.[119]

The Drew Las Vegas[]

In August 2017, investment firms Witkoff Group and New Valley LLC purchased the resort for $600 million, with plans to rename it. Additional plans were not disclosed for the project at that time.[120] The purchase and planned improvements were financed through Deutsche Bank, Goldman Sachs and JPMorgan.[121] In subsequent months, the Las Vegas-based Grand Canyon Development Partners became involved with the project, which also had new hotel operators. The company planned to water-proof the building immediately and eventually complete it, with a substantial interior and exterior redesign. The Fontainebleau was referred to as Project Blue in county records at the time.[122][123] Penta Building Group was hired to finish the resort, with construction expected to resume in 2018.[123] Plans to finish the project's design and to obtain a construction loan were expedited in December 2017, after the passage of the Tax Cuts and Jobs Act of 2017. The project would create 5,000 construction jobs, and 6,000 jobs upon opening.[124][125]

The Drew in August 2018

On February 12, 2018, Witkoff and Marriott International announced a partnership to open the renamed project as The Drew Las Vegas in late 2020. In addition to the Drew hotel, the resort would also house hotels from two Marriott brands, EDITION and JW Marriott Hotels, making it the first JW Marriott hotel to open on the Las Vegas Strip. Marriott would manage the three hotels,[126][127][128] and would also invest $50 million in the project.[129] The resort would feature a casino and 3,780 hotel rooms; condominiums were no longer planned for the tower. The Drew would also include more than 550,000 sq ft (51,000 m2) of convention and meeting space.[130]

The project's new name received puzzled reactions because of its unclear meaning. A representative for Steve Witkoff's company stated that The Drew "feels familiar and approachable, but also fresh and modern – it reflects what people are craving in Las Vegas and signals the experiences Witkoff and Marriott will deliver." The new name is also a tribute to Witkoff's deceased 22-year-old son, Andrew Witkoff, who died of an OxyContin overdose in 2011.[126][131] Before his purchase, Steve Witkoff said he had heard "nasty rumors" about the building being in poor condition. He said that such rumors turned out to be false and that the building was in exceptional condition.[132] Witkoff had plans for a bridge to connect The Drew to the expanded Las Vegas Convention Center, which was scheduled to complete its expansion in 2020.[126][127] A man trespassed onto the Drew property in March 2018, and sparked a number of fires out of boredom. The fires caused $10 million in damage to several areas, including a ballroom and the 11th floor of the parking garage. The man was later apprehended and charged with arson.[133][134]

In April 2019, Witkoff announced that the opening would be delayed until the second quarter of 2022.[132][131] The delay was attributed to the amount of time spent working on the project's design. The total cost would be $3.1 billion, including the $600 million purchase price, approximately $1.2 billion in construction, and hundreds of millions of dollars for pre-opening costs. The building interior was cavernous and included unfinished escalators, walls, and ceilings, as well as exposed beams and columns. The interior also contained a partially built theater.[132] Witkoff stated the delay would give him better certainty regarding the construction budget. He also announced that a substantial amount of the eventual resort's profits would go to a family foundation that fights drug addiction, in honor of his son. The resort was designed by the architecture firm Diller Scofidio + Renfro.[131] Bobby Baldwin was announced as the chief executive officer of The Drew Las Vegas in November 2019.[135][136]

Witkoff expected to finalize a construction loan of approximately $2 billion during early 2020. At the time, Witkoff said the interior of the building was active with hundreds of workers, and that a much larger construction presence would be noticeable later in the year with potentially 2,000 workers. The resort was expected to be opened by November 2022.[137] However, construction was suspended in March 2020, due to the COVID-19 pandemic in Nevada.[138] Several months later, contractors filed liens totaling millions of dollars, for allegedly unpaid work.[139] In addition, executives who had recently joined the project were laid off amid the pandemic, and they sued for lack of salary, alleging that their employee contract was broken.[140]

Return to Fontainebleau[]

In February 2021, Soffer bought back the project through his Florida-based company, Fontainebleau Development. The company partnered with Koch Real Estate Investments on the purchase, and various options were under consideration for the property, which was 75-percent complete.[141][142][143] Soffer had given little thought to returning to the project, until the pandemic resulted in the opportunity to buy it back.[144] The project was purchased for $350 million,[145] and the property was valued at $615.5 million.[146] Marriott exited the project later in 2021, citing an amicable agreement with Fontainebleau Development, which instead would manage and operate the hotel itself.[147][148]

On November 9, 2021, Fontainebleau Development held a construction commencement ceremony for the project, announcing that it would be renamed Fontainebleau Las Vegas once again, with the opening scheduled for late 2023. Richardson Construction was hired as general contractor.[144][149] Soffer intends to stick largely to the project's original plans, though with some modern updates.[149][150] The Fontainebleau's retail mall will be greatly reduced from the initial plans, and condominiums will not be part of the project.[151]

In media[]

The Fontainebleau is depicted in the 2014-15 television series Dominion, in which it has become a hydroponic farm known as the Agri-Tower.[152][153]

See also[]

  • List of tallest buildings in the United States
  • Landmark (hotel and casino), once the tallest building in Nevada; opened in 1969 after several years of delays

References[]

  1. ^ "Fontainebleau Las Vegas". CTBUH Skyscraper Center.
  2. ^ Fontainebleau Las Vegas at Emporis
  3. ^ "Fontainebleau Las Vegas". SkyscraperPage.
  4. ^ Fontainebleau Las Vegas at Structurae
  5. ^ a b c Simpson, Jeff (10 June 2007). "Jeff Simpson on why a new resort positioned in the space formerly occupied by the Thunderbird should make money this time". Las Vegas Sun. Retrieved 8 May 2017.
  6. ^ a b Smith, Hubble (March 24, 2005). "Turnberry confirms land buy". Las Vegas Review-Journal. Archived from the original on December 13, 2005.
  7. ^ a b c d Stutz, Howard (13 May 2005). "Back on the Strip: Developer counts on LV touch". Las Vegas Review-Journal. Archived from the original on 1 January 2006.
  8. ^ a b "Strip project gets new investor". Las Vegas Review-Journal. 17 April 2007. Retrieved 8 May 2017.
  9. ^ Smith, Hubble (March 23, 2005). "Valley high-rise project 'dead in the water'". Las Vegas Review-Journal. Archived from the original on March 24, 2005.
  10. ^ Shubinski, Jennifer (4 April 2005). "Cancellation of condo project spurs lawsuits". Las Vegas Sun. Retrieved 8 May 2017.
  11. ^ a b c Benston, Liz (12 May 2005). "Turnberry, Schaeffer plan new resort on the Strip". Las Vegas Sun. Retrieved 8 May 2017.
  12. ^ a b c Illia, Tony (April 1, 2011). "No Luck for Stalled Fontainebleau Las Vegas". Architectural Record. Retrieved March 8, 2021.
  13. ^ a b c d Nasvki, Joe (January 26, 2009). "Building the Fontainebleau". Concrete Construction. Retrieved March 8, 2021.
  14. ^ a b c d Knightly, Arnold M. (June 12, 2009). "Building halted, resort secured". Las Vegas Review-Journal. Retrieved March 8, 2021.
  15. ^ a b Knightly, Arnold M. (April 15, 2008). "Full Speed Ahead". Las Vegas Review-Journal. Retrieved March 8, 2021.
  16. ^ a b c Knightly, Arnold M. (15 April 2008). "Fontainebleau stays on course". Casino City Times. Retrieved 8 May 2017.
  17. ^ a b Benston, Liz (January 19, 2009). "Fontainebleau has the cash to keep rising". Las Vegas Sun. Retrieved March 8, 2021.
  18. ^ a b Knightly, Arnold M. (December 17, 2008). "Fontainebleau, what's really up with you?". Las Vegas Review-Journal. Retrieved March 8, 2021.
  19. ^ a b Knightly, Arnold M. (April 24, 2009). "Fontainebleau says $130 million available for construction". Las Vegas Review-Journal. Retrieved March 8, 2021.
  20. ^ a b c Benston, Liz (January 19, 2009). "Beneath its skin, Fontainebleau has something extra for guests' gadgets". Las Vegas Sun. Retrieved March 8, 2021.
  21. ^ Friess, Steve (June 20, 2008). "Fontainebleau resorts hook up with Apple". USA Today. Retrieved March 8, 2021.
  22. ^ a b "No one hurt as slabs fall at construction site". Las Vegas Review-Journal. 7 August 2007. Retrieved 8 May 2017.
  23. ^ a b c Illia, Tony (June 15, 2009). "Help on the Way?". Las Vegas Business Press. Archived from the original on June 19, 2009.
  24. ^ Knightly, Arnold M. (October 8, 2009). "Judge allows Fountainbleau Las Vegas out of land lease". Las Vegas Review-Journal. Retrieved March 8, 2021.
  25. ^ a b "Fontainebleau builder lands big financing". Las Vegas Review-Journal. 8 June 2007. Retrieved 8 May 2017.
  26. ^ Berzon, ra; Mishak, Michael (April 13, 2008). "A Cautious Push". Las Vegas Sun. Retrieved March 8, 2021.
  27. ^ a b c d Smith, Hubble (18 October 2007). "Fontainebleau plans viewed with wrath". Las Vegas Review-Journal. Retrieved 8 May 2017.
  28. ^ "Turnberry residents allege turnabout by developer who's ruining their views". Las Vegas Sun. July 23, 2007. Retrieved March 9, 2021.
  29. ^ Benston, Liz (April 22, 2008). "Garage goes up next door, and condo owners want out". Las Vegas Sun. Retrieved March 9, 2021.
  30. ^ Smith, Hubble (20 October 2007). "Ruling favors casino". Las Vegas Review-Journal. Retrieved 8 May 2017.
  31. ^ Stutz, Howard (21 September 2006). "Traffic concerns prompt delay in Fontainebleau zoning vote". Las Vegas Review-Journal. Archived from the original on 5 July 2008.
  32. ^ Green, Steve (October 25, 2012). "Court sides with contractors in $100 million dispute over Fontainebleau bankruptcy". VegasInc. Retrieved March 8, 2021.
  33. ^ "Question of the Day". Las Vegas Advisor. November 14, 2017. Retrieved July 5, 2019. About the 1,150-foot-tall Stratosphere … yes and no. It's the tallest observation tower in the U.S., but through some quirk of definition, it's not a "building" because it's not fully habitable. Thus, second-place Fontainebleau (735 feet) is actually the tallest building in southern Nevada [...]
  34. ^ Kachelriess, Rob (September 19, 2016). "The Worst Eyesores in Las Vegas". Thrillist. Retrieved July 5, 2019. If you don't count the Stratosphere tower, the tallest building in Las Vegas is the Fontainebleau...
  35. ^ Morris, J. D. (November 11, 2015). "Fontainebleau on north Strip for sale". Vegas Inc. Retrieved July 5, 2019. The firm's announcement also highlighted the Fontainebleau's "iconic height" as a selling point: It's one of the tallest structures in the valley, surpassed only by the Stratosphere for prominence on the Las Vegas skyline.
  36. ^ Comen, Evan; Sauter, Michael B. (February 6, 2017). "The Tallest Building in Every State". Yahoo!. Retrieved July 5, 2019.
  37. ^ Knightly, Arnold M. (November 7, 2008). "Moody's downgrades Fontainebleau debt funding". Las Vegas Review-Journal.
  38. ^ Benston, Liz (February 20, 2009). "S&P: Fontainebleau could have trouble making payments". Las Vegas Sun. Retrieved March 8, 2021.
  39. ^ "Moody's: Fontainebleau could default on debt". Las Vegas Sun. March 4, 2009. Retrieved March 8, 2021.
  40. ^ a b c Benston, Liz (April 23, 2009). "Fontainebleau files $3 billion suit over funding". Las Vegas Sun. Retrieved March 8, 2021.
  41. ^ "Berkley wants talks with Obama administration on Fontainebleau". Las Vegas Sun. April 27, 2009. Retrieved March 8, 2021.
  42. ^ Green, Steve (April 27, 2009). "In Fontainebleau's PR battle, banks have yet to talk". Las Vegas Sun. Retrieved March 8, 2021.
  43. ^ Benston, Liz (April 29, 2009). "Sued by Fontainebleau, banks could cite 'act of God' as defense for refusing funds". Las Vegas Sun. Retrieved March 8, 2021.
  44. ^ a b Knightly, Arnold M. (April 23, 2009). "Fontainebleau sues lenders who denied prearranged funding". Las Vegas Review-Journal. Retrieved March 8, 2021.
  45. ^ Green, Steve (April 29, 2009). "Union: Banks putting jobs in jeopardy over Fontainebleau". Las Vegas Sun. Retrieved March 8, 2021.
  46. ^ a b Green, Steve (June 9, 2009). "Fontainebleau developer files for bankruptcy; more jobs cut". Las Vegas Sun. Retrieved March 8, 2021.
  47. ^ Knightly, Arnold M. (June 17, 2009). "Judge puts Fontainebleau lawsuit against banks on fast track". Las Vegas Review-Journal. Retrieved March 8, 2021.
  48. ^ Green, Steve (July 2, 2009). "Court filings shed light on Fontainebleau financing". Las Vegas Sun. Retrieved March 8, 2021.
  49. ^ a b c d Knightly, Arnold (April 30, 2009). "Contractors lay off workers at Fontainebleau while waiting on money". Las Vegas Review-Journal. Retrieved March 8, 2021.
  50. ^ Knightly, Arnold M. (April 28, 2009). "Bank of America negotiating with Fontainebleau to help finance project". Las Vegas Review-Journal. Retrieved March 8, 2021.
  51. ^ "Fontainebleau developer lays off 40 employees". Las Vegas Sun. May 18, 2009. Retrieved March 8, 2021.
  52. ^ Knightly, Arnold M.; Illia, Tony (May 1, 2009). "Work interruption at Fontainebleau could hinder project later". Las Vegas Review-Journal. Retrieved March 8, 2021.
  53. ^ Knightly, Arnold M. (May 13, 2009). "Fontainebleau: Deutsche Bank seeking to destroy our project". Las Vegas Review-Journal. Retrieved March 8, 2021.
  54. ^ Benston, Liz (May 12, 2009). "Fontainebleau: Bank wanted to minimize Cosmopolitan competition". Las Vegas Sun. Retrieved March 8, 2021.
  55. ^ Green, Steve (September 17, 2009). "Fontainebleau: Bank no longer 'seeking to destroy' project". Las Vegas Sun. Retrieved March 8, 2021.
  56. ^ Green, Steve (May 14, 2009). "Contractor sues Fontainebleau over firing, says it's owed money". Las Vegas Sun. Retrieved March 8, 2021.
  57. ^ Knightly, Arnold M. (May 15, 2009). "Fontainebleau developer facing another lawsuit". Las Vegas Review-Journal. Retrieved March 8, 2021.
  58. ^ "Consulting Group Sues Las Vegas Luxury Resort". The Wall Street Journal. May 15, 2009. Retrieved March 8, 2021.
  59. ^ a b Benston, Liz (June 8, 2009). "Outlook for Fontainebleau slides from bad to worse". Las Vegas Sun. Retrieved March 8, 2021.
  60. ^ Knightly, Arnold (May 18, 2009). "Corporate layoffs begin at Fontainebleau, more cuts likely". Las Vegas Review-Journal. Retrieved March 8, 2021.
  61. ^ "Fontainebleau executive leaves company". Las Vegas Sun. May 29, 2009. Retrieved March 8, 2021.
  62. ^ a b "Fontainebleau's top executive leaves company". Las Vegas Review-Journal. May 30, 2009. Retrieved March 8, 2021.
  63. ^ Knightly, Arnold M. (June 9, 2009). "Fontainebleau Las Vegas files for Chapter 11 bankruptcy". Las Vegas Review-Journal. Retrieved March 8, 2021.
  64. ^ "Fontainebleau Las Vegas files for Ch. 11 bankruptcy". Reuters. 10 June 2009. Archived from the original on February 25, 2014.
  65. ^ Retrieved March 8, 2021:
  66. ^ Green, Steve (June 19, 2009). "Fontainebleau subcontractors say contractor conflicted". Las Vegas Sun. Retrieved March 8, 2021.
  67. ^ Knightly, Arnold M. (June 10, 2009). "Plus side seen in Fontainebleau bankruptcy despite worker layoffs". Las Vegas Review-Journal. Retrieved March 8, 2021.
  68. ^ Green, Steve (June 10, 2009). "Fontainebleau wants expedited hearing on $656 million". Las Vegas Sun. Retrieved March 8, 2021.
  69. ^ Knightly, Arnold M. (July 11, 2009). "Banks say Strip resort faces huge liabilities". Las Vegas Review-Journal. Retrieved March 8, 2021.
  70. ^ Green, Steve (June 10, 2009). "Australian company writes off Fontainebleau ownership interest". Las Vegas Sun. Retrieved March 8, 2021.
  71. ^ Knightly, Arnold M. (June 10, 2009). "Fontainebleau investor has no plans to participate in restructuring". Las Vegas Review-Journal. Retrieved March 8, 2021.
  72. ^ Benston, Liz (June 28, 2009). "Practice of building before designs are done hits wall at Fontainebleau". Las Vegas Sun. Retrieved March 8, 2021.
  73. ^ "News 3 takes viewers inside the shuttered Fontainebleau". KSNV. April 29, 2013. Archived from the original on August 19, 2016.
  74. ^ Green, Steve (July 6, 2009). "Fontainebleau developers: Design change could help costs". Las Vegas Sun. Retrieved March 8, 2021.
  75. ^ Steve Green (17 July 2009). "Fontainebleau moves to cancel conventions, worker contracts". Las Vegas Sun. Retrieved 29 August 2011.
  76. ^ Green, Steve (July 8, 2009). "Fontainebleau fires back, outlines bank dispute". Las Vegas Sun. Retrieved March 8, 2021.
  77. ^ Green, Steve (July 15, 2009). "Fontainebleau contractor says its liens take priority over lenders". Las Vegas Sun. Retrieved March 8, 2021.
  78. ^ Knightly, Arnold M. (July 18, 2009). "Fontainebleau owner suing … err, himself?". Las Vegas Review-Journal. Retrieved March 8, 2021.
  79. ^ a b Green, Steve (September 15, 2009). "Potential buyer in negotiations for stalled Fontainebleau project". Las Vegas Sun. Retrieved March 8, 2021.
  80. ^ "Fontainebleau dispute with banks to be decided in court". Las Vegas Review-Journal. August 28, 2009. Retrieved March 8, 2021.
  81. ^ Retrieved March 9, 2021:
  82. ^ a b "Soffer, Packer accused of concealing Fontainebleau cost overruns". VegasInc. April 7, 2011. Retrieved March 9, 2021.
  83. ^ "BofA Didn't Breach Fontainebleau Lending Contract, Judge Says". www.law360.com. Retrieved 2016-03-10.
  84. ^ "Bank of America agrees to $300 million Fontainebleau settlement". Las Vegas Review-Journal. February 25, 2015. Retrieved March 9, 2021.
  85. ^ Knightly, Arnold M. (June 19, 2009). "Casino groups express interest in Fontainebleau". Las Vegas Review-Journal. Retrieved March 8, 2021.
  86. ^ Knightly, Arnold M. (September 25, 2009). "Fontainebleau lenders pursue liquidation". Las Vegas Review-Journal. Retrieved March 8, 2021.
  87. ^ Stutz, Howard (September 18, 2009). "Analysts: Penn deal for Fontainebleau 'unlikely'". Las Vegas Review-Journal.
  88. ^ Stutz, Howard (October 6, 2009). "Penn National Gaming makes bid for bankrupt Fontainebleau". Las Vegas Review-Journal. Retrieved March 8, 2021.
  89. ^ a b c Stutz, Howard (November 18, 2009). "Penn seeks approval to buy Fontainebleau". Las Vegas Review-Journal. Retrieved March 8, 2021.
  90. ^ Stutz, Howard (October 22, 2009). "Penn's interest in Strip persists". Las Vegas Review-Journal. Retrieved March 8, 2021.
  91. ^ Knightly, Arnold M. (October 8, 2009). "Judge names examiner to push for Fontainbleau sale". Las Vegas Review-Journal. Retrieved March 8, 2021.
  92. ^ Knightly, Arnold M. (October 2, 2009). "Stalled Fontainebleau project appears headed for fast-track sale". Las Vegas Review-Journal. Retrieved March 8, 2021.
  93. ^ Arnold M. Knightly (27 January 2010). "Icahn wins auction to buy Fontainebleau for $150 million". Las Vegas Review-Journal. Retrieved 29 August 2011.
  94. ^ Stutz, Howard; Knightly, Arnold M. (November 23, 2009). "Fontainebleau Las Vegas has new bidder". Las Vegas Review-Journal. Retrieved March 9, 2021.
  95. ^ Steve Green (23 November 2009). "Carl Icahn offers $156 million for Fontainebleau, outbids Penn National". Las Vegas Sun. Retrieved 29 August 2011.
  96. ^ Stutz, Howard (January 14, 2010). "Penn won't pursue Fontainebleau". Las Vegas Review-Journal. Retrieved March 9, 2021.
  97. ^ "Developer eyes Fontainebleau". Las Vegas Review-Journal. January 19, 2010. Retrieved March 9, 2021.
  98. ^ Stutz, Howard (February 19, 2010). "Icahn officially the unfinished Fontainebleau's owner". Las Vegas Review-Journal. Retrieved March 9, 2021.
  99. ^ Stutz, Howard (January 20, 2010). "Icahn apparently wins Fontainebleau ownership". Las Vegas Review-Journal. Retrieved March 9, 2021.
  100. ^ Knightly, Arnold M. (January 27, 2010). "Icahn wins auction to buy Fontainebleau for $150 million". Las Vegas Review-Journal. Retrieved March 9, 2021.
  101. ^ "Icahn lands Las Veg bargain; what next?". Las Vegas Review-Journal. January 28, 2010. Retrieved March 9, 2021.
  102. ^ Green, Steve (August 5, 2010). "Carl Icahn: Fontainebleau to sit idle until economy improves". Las Vegas Sun. Retrieved March 9, 2021.
  103. ^ Velotta, Richard N. (February 9, 2011). "Executive: No plans in place for stalled Fontainebleau project on Las Vegas Strip". Las Vegas Sun. Retrieved March 9, 2021.
  104. ^ a b Stutz, Howard (May 13, 2014). "Removal of Fontainebleau's construction crane signals doom for ill-fated Strip hotel". Las Vegas Review-Journal. Retrieved March 9, 2021.
  105. ^ a b Robison, Jennifer (November 11, 2015). "Fontainebleau goes on the market — asking price $650M". Las Vegas Review-Journal. Retrieved March 9, 2021.
  106. ^ Robison, Jennifer (January 28, 2011). "Firefighters conduct drills at Fontainebleau". Las Vegas Review-Journal. Retrieved March 9, 2021.
  107. ^ Steve Friess (21 October 2010). "For many, gamble lost in once-booming Las Vegas". Agence France-Presse. Archived from the original on June 29, 2011.
  108. ^ Benston, Liz (October 7, 2010). "Plaza gets Strip stuff at downtown prices". Las Vegas Sun. Retrieved March 9, 2021.
  109. ^ O'Reiley, Tim (June 22, 2011). "Plaza gets lift from failed Fontainebleau". Las Vegas Review-Journal. Retrieved March 9, 2021.
  110. ^ Finnegan, Amanda (January 24, 2011). "$8.5 million renovation a first for Primm Valley casinos". Las Vegas Sun. Retrieved March 9, 2021.
  111. ^ "Primm hotel-casino primps". Las Vegas Review-Journal. December 29, 2010. Retrieved March 9, 2021.
  112. ^ Shine, Conor (May 18, 2014). "There's little the county can do to clean up eyesores left by recession". Las Vegas Sun. Retrieved March 9, 2021.
  113. ^ Retrieved March 9, 2021:
  114. ^ Davidson, Michael Scott (May 1, 2017). "Wrap planned for unfinished Fontainebleau on Las Vegas Strip". Las Vegas Review-Journal. Retrieved March 9, 2021.
  115. ^ "Update: Fontainebleau Las Vegas begins wrap project". KTNV. July 25, 2017. Retrieved December 11, 2017.
  116. ^ Karmin, Craig; O'Keeffe, Kate (November 12, 2015). "Carl Icahn Looking to Sell the Fontainebleau Las Vegas". The Wall Street Journal. Retrieved March 9, 2021.
  117. ^ Wargo, Buck (June 3, 2016). "Deal for Fontainebleau casino project expected by late summer". Las Vegas Review-Journal. Retrieved March 9, 2021.
  118. ^ Velotta, Richard N. (August 5, 2017). "Fontainebleau's future uncertain as sale rumors persist". Las Vegas Review-Journal. Retrieved March 9, 2021.
  119. ^ Segall, Eli (June 15, 2018). "New CEO talks about changes coming for Hard Rock in Las Vegas". Las Vegas Review-Journal. Retrieved April 12, 2020.
  120. ^ Segall, Eli; Velotta, Richard N. (August 29, 2017). "Fontainebleau on Las Vegas Strip sells for $600M". Las Vegas Review-Journal. Retrieved August 29, 2017.
  121. ^ Velotta, Richard N. (January 8, 2020). "Gaming Control Board recommends licensing for owner of The Drew". Las Vegas Review-Journal. Retrieved January 24, 2020.
  122. ^ Langeler, John (December 7, 2017). "Empty Fountainbleau sold to new owner". KLAS-TV. Retrieved December 11, 2017.
  123. ^ a b Segall, Eli (December 13, 2017). "Unfinished Fontainebleau on Las Vegas Strip becomes Project Blue". Las Vegas Review-Journal. Retrieved December 26, 2017.
  124. ^ Carmiel, Oshrat (December 22, 2017). "A Stalled Las Vegas Resort Is Now a Go Thanks to the Tax Overhaul". Bloomberg. Retrieved December 26, 2017.
  125. ^ King, Danny (December 26, 2017). "Las Vegas Fontainbleau site's buyer says tax cut will speed up development". Travel Weekly. Retrieved December 26, 2017.
  126. ^ a b c Segall, Eli (February 12, 2018). "Fontainebleau on Las Vegas Strip Has New Name and Opening Date". Las Vegas Review-Journal. Retrieved August 4, 2018.
  127. ^ a b Garcia Cano, Regina (February 12, 2018). "Stalled Fontainebleau Casino-Resort to Open in 2020 with New Name". Las Vegas Sun. Retrieved August 4, 2018.
  128. ^ "Marriott International And Witkoff Set To Open Integrated Resort To Be Named The Drew Las Vegas". prnewswire. Marriott International, Inc. February 12, 2018. Retrieved August 4, 2018.
  129. ^ Segall, Eli (February 16, 2018). "Marriott to spend $50M for ownership in former Fontainebleau". Las Vegas Review-Journal. Retrieved March 9, 2021.
  130. ^ Segall, Eli (May 10, 2019). "Plenty of work remains on Drew Las Vegas". Las Vegas Review-Journal. Retrieved January 24, 2020.
  131. ^ a b c Palmeri, Christopher (April 16, 2019). "Vegas Strip's $3.1 Billion Resort Postponed More Than a Year". Bloomberg. Retrieved April 19, 2019.
  132. ^ a b c Segall, Eli (April 16, 2019). "Opening of Drew Las Vegas pushed back until 2022". Las Vegas Review-Journal. Retrieved January 24, 2020.
  133. ^ Torres-Cortez, Ricardo (May 3, 2018). "Man faces arson charge in fire at unfinished north Strip resort". Las Vegas Sun. Retrieved March 9, 2021.
  134. ^ "Man gets 5 years in fires at Strip resort construction site". Las Vegas Sun. August 31, 2020. Retrieved March 9, 2021.
  135. ^ Schulz, Bailey (November 1, 2019). "Former MGM Resorts exec Bobby Baldwin named CEO of Drew Las Vegas". Las Vegas Review-Journal. Retrieved January 24, 2020.
  136. ^ Seeman, Matthew (November 1, 2019). "Longtime gaming executive named CEO of Drew Las Vegas". KSNV. Retrieved January 24, 2020.
  137. ^ Segall, Eli (January 24, 2020). "Drew Las Vegas developer expects to close $2B construction loan soon". Las Vegas Review-Journal. Retrieved January 24, 2020.
  138. ^ Segall, Eli (March 18, 2020). "Drew Las Vegas on hold, other construction continues amid virus' spread". Las Vegas Review-Journal. Retrieved February 13, 2021.
  139. ^ Segall, Eli (June 16, 2020). "Contractors say they're owed $36M for work done at Drew Las Vegas". Las Vegas Review-Journal. Retrieved March 9, 2021.
  140. ^ Segall, Eli (June 25, 2020). "Laid-off Drew Las Vegas staffers sue owner, claim money owed". Las Vegas Review-Journal. Retrieved March 9, 2021.
  141. ^ Horwath, Bryan (February 12, 2021). "Firm acquires Drew Las Vegas with plans to finish stalled resort project". Las Vegas Sun. Retrieved February 13, 2021.
  142. ^ Segall, Eli (February 11, 2021). "Koch Industries teams with developer to buy Drew on Las Vegas Strip". Las Vegas Review-Journal. Retrieved February 13, 2021.
  143. ^ Gittelsohn, John; Palmeri, Christopher (February 12, 2021). "Koch Industries Buys Stalled Las Vegas Casino Development". Bloomberg. Retrieved February 13, 2021.
  144. ^ a b Lochhead, Colton (November 9, 2021). "Fontainebleau to open by end of 2023, developer says". Las Vegas Review-Journal. Retrieved November 10, 2021.
  145. ^ Segall, Eli (December 31, 2021). "'Back in my hands': Fontainebleau's original developer to finally finish resort". Las Vegas Review-Journal. Retrieved January 7, 2022.
  146. ^ Segall, Eli (February 22, 2021). "New owners landed Drew Las Vegas through 'deed in lieu'". Las Vegas Review-Journal. Retrieved March 9, 2021.
  147. ^ Segall, Eli (October 15, 2021). "Marriott exits unfinished former Fontainebleau project". Las Vegas Review-Journal. Retrieved November 10, 2021.
  148. ^ "Marriott exits Fontainebleau deal". KSNV. October 14, 2021. Retrieved November 10, 2021.
  149. ^ a b Gillan, Jeff (November 9, 2021). "It's official: Work underway at Fontainebleau 2.0". KSNV. Retrieved November 10, 2021.
  150. ^ Gillan, Jeff (October 28, 2021). "Fontainebleau: New owners plan November 9 update". KSNV. Retrieved November 10, 2021.
  151. ^ Stutz, Howard (November 14, 2021). "Original Fontainebleau developer gets chance to finish resort a decade later". The Nevada Independent. Retrieved January 7, 2022.
  152. ^ "Question of the Day". Las Vegas Advisor. May 3, 2020. Retrieved March 9, 2021.
  153. ^ "Chapter Five". Syfy. Archived from the original on July 20, 2014.

External links[]