Jyväskylä rail accident
Jyväskylä rail accident | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Details | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Date | 6 March 1998 13:49 local time (11:49 UTC) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | Jyväskylä | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Country | Finland | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line | Orivesi–Jyväskylä | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator | VR Group | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Incident type | Derailment | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cause | Excessive speed, human error | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Statistics | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Trains | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Passengers | 300 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Deaths | 9 passengers, 1 crew | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Injured | 94 (8 seriously) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Jyväskylä rail accident occurred on 6 March 1998 in Jyväskylä, Finland, when the Sr1-driven express train P105 from Turku bound for Joensuu via Pieksämäki derailed. The train left the tracks after coming in too fast on a 35 km/h (22 mph) switch near the station. 300 people were on board (some sources say 500[1][2]); the fireman driving the train and nine passengers were killed, and 94 passengers injured.[3]
The investigation found the cause of the accident to be human error when interpreting signals. The driver of the train was expecting the train to enter the station on another track, which had a higher speed limit of 80 kilometres per hour (50 mph). An estimate of the total cost of the accident was 21.5 million FIM (3.6 million euros).[4]
Chronology of events[]
The train had departed Tampere 20 minutes late, but was arriving at Jyväskylä only 10 minutes behind schedule.[5] The crew of two drivers had switched seats at Jämsä, with the driver in charge (the engineer) looking out and the secondary driver (or fireman, Finnish: veturinlämmittäjä) driving the train when it arrived to Jyväskylä.[5] The fireman was searching for a coffee bag in his personal bag 750 m (2,460 ft) before the distant signal of Jyväskylä railyard and handed it to the engineer, who then began to brew coffee.[6]
While seven out of the nine daily trains arriving from Tampere were using track 1, this train was due to arrive on track 3 because of its length.[7] However, track 3 was entered through a so-called short switch, with a maximum speed of 35 km/h (22 mph). Track 1, which had been used by all arriving trains until the end of 1997,[8] featured a long switch, speed limit 80 km/h (50 mph). According to the data available from the event recorder, the driver was seemingly prepared to enter the switch leading to track 1 at 80 km/h (50 mph).[8] Even though emergency braking was initiated, it was effective for only 100 m (330 ft) before the switch.[9]
The locomotive was thrown some 50 metres (160 ft) away from the track, crossing a highway and hitting a concrete bridge support at approximately 90 km/h (56 mph). The driving fireman was killed on impact.[10] The two coaches at the front of the train rolled over and six others derailed, remaining upright.[3] Many passengers were thrown out of the overturned cars and nine were killed as they were crushed under them.[11]
As the accident happened close to the city center, the first rescuers were on the scene only four minutes after the accident.[12] However, more units were quickly needed when the extent of the accident became clear.[13] Luckily many of the rescue workers had been involved in a large scale accident less than two years earlier during the 1996 Neste 1000 Lakes Rally (renamed the following year as Rally Finland), when one spectator was killed and 32 injured when a rally car hit a group of spectators during the Harju special stage.[14][1] Lifting equipment was needed, as many passengers were trapped under overturned carriages; three people were saved from under the cars with air cushions.[1]
Causes[]
The investigation of the accident was slow at first and included reconstructions of the accident. The causes became clearer after a few days when the black box of the train was deciphered and the surviving engineer had recovered enough to be heard.[15]
The main cause of the accident was blamed on human error when interpreting signals. The Finnish signalling system at that time was still less than ten years old.[16] It contained a number signal as a complement to the expect 35 or proceed 35 aspects to allow higher speeds, such as 80 or 110 km/h (50 or 68 mph).[17] The signals at Jyväskylä were showing expect 35 and proceed 35; with the number signal they were able to show the signals expect 80 and proceed 80 respectively for trains directed on track 1.[18] According to the data recovered from the train and subsequent braking tests,[19] it seems that the driver had misinterpreted the signals and arrived at Jyväskylä, fully expecting to enter track 1 at a speed of 80 km/h (50 mph), and, realising what had happened, applied emergency braking just before the fateful switch.[20]
The accident also showed problems in VR's management. The company had not upgraded safety instructions and the notes handed to the drivers were not easily readable.[21] The accident investigation board interviewed 100 railway engineers, 70 of which answered, during the investigation.[22] Almost 30% of them had mixed up number signals and over half had seen unsafe incidents during the past year.[23]
The fireman driving the train was tired as he had finished his previous shift at 06:05 in the morning and had not slept well at the provided facilities at Tampere.[24] Additionally, the engineer had begun brewing coffee just before arriving at Jyväskylä. He was then unable to warn his colleague about the overspeed before it was too late.[20]
Aftermath[]
This accident, following the Jokela rail accident two years before, showed the importance of the automatic train control system, which could have prevented both of them. At Jyväskylä, the system would have first warned the driver, then braked automatically 1.4 kilometres (0.87 mi) before the switch, slowing the train to a safe speed.[25] Deployment of the system had started in 1995, and it was hurried in the aftermath of the accidents.[26]
VR offered compensations to those involved in the accident,[27] and VR Cargo cancelled a safety campaign that was started only a few days before.[28] The accident caused major disturbances to Jyväskylä's road and rail traffic.[29][30]
The accident investigation board recommended the use of seatbelts in trains.[31][32] VR implemented airplane-style seatbelts[33] in three InterCity carriages during the year 1999,[34] but finally decided against a wide-range deployment due to their impracticality.[citation needed]
The surviving engineer was sued on 25 January 2000 for causing a traffic hazard, negligent homicide and negligent bodily injury.[35] He was acquitted during the same year by the Jyväskylä District Court.[36] The decision was upheld in November 2001 by the Vaasa Court of Appeal, freeing him from charges.[37]
See also[]
Similar accidents[]
- Jokela rail accident – overspeed through turnout
- Brühl train disaster – overspeed through turnout
- Waterfall rail accident – overspeed through sharp curve
References[]
- ^ Jump up to: a b c Katajamäki, Juhani (1998). "Jyväskylän synkkä junaturma oli myös nopea pelastusoperaatio" (PDF). Pelastustieto (in Finnish) (2): 8–11. Archived from the original (PDF) on 25 April 2012.
- ^ "Jyväskylän junaturmassa kymmenen kuollutta". MTV3. 6 March 1998. Archived from the original on 12 March 2005. Retrieved 15 November 2011.
- ^ Jump up to: a b OTKES 1999, p. 9.
- ^ OTKES 1999, p. 10.
- ^ Jump up to: a b OTKES 1999, p. 2.
- ^ OTKES 1999, pp. 57–58.
- ^ OTKES 1999, p. 1.
- ^ Jump up to: a b OTKES 1999, p. 57.
- ^ OTKES 1999, p. 3.
- ^ OTKES 1999, p. 15.
- ^ OTKES 1999, p. 11.
- ^ OTKES 1999, p. 18.
- ^ OTKES 1999, pp. 21–22.
- ^ OTKES 1999, p. 22.
- ^ "Jyväskylän junaturman palaset kohdalleen". STT (in Finnish). MTV3. 17 March 1998. Retrieved 28 July 2011.
- ^ OTKES 1999, p. 32.
- ^ OTKES 1999, p. 33.
- ^ OTKES 1999, p. 34.
- ^ OTKES 1999, pp. 34–37.
- ^ Jump up to: a b OTKES 1999, p. 59.
- ^ OTKES 1999, pp. 51–53.
- ^ OTKES 1999, p. 42.
- ^ OTKES 1999, pp. 43–44.
- ^ OTKES 1999, p. 55.
- ^ OTKES 1999, p. 39.
- ^ "Kulunvalvontajärjestelmän rakentamista nopeutetaan". STT (in Finnish). MTV3. 12 March 1998. Retrieved 28 July 2011.
- ^ "VR valmistautuu maksamaan korvauksia". STT (in Finnish). MTV3. 7 March 1998. Retrieved 28 July 2011.
- ^ "VR Cargo perui turvallisuuskampanjan". STT (in Finnish). MTV3. 10 March 1998. Retrieved 28 July 2011.
- ^ "Raivaustyöt haittaavat Jyväskylän ohitusliikennettä". STT (in Finnish). MTV3. 7 March 1998. Retrieved 28 July 2011.
- ^ "Jyväskylän junaliikenteessä vielä viivytyksiä". MTV3 (in Finnish). 9 March 1998. Retrieved 28 July 2011.
- ^ OTKES 1999, p. 63.
- ^ "Juniin halutaan turvavyöt". MTV3 (in Finnish). 21 December 1998. Retrieved 28 July 2011.
- ^ Määttä, Janne (9 May 2000). "Ex 26230 turvavyöt" (in Finnish). Vaunut.org. Retrieved 28 July 2011.
- ^ "Juniin tulossa turvavyöt". MTV3 (in Finnish). 29 January 1999. Retrieved 28 July 2011.
- ^ "Jyväskylän junaturmassa syytteet liikenneturvallisuuden vaarantamisesta sekä kuoleman- ja vammantuotamuksista" (in Finnish). Office of the Procecutor General. 25 January 2000. Retrieved 18 November 2011.
- ^ "Jyväskylän junaturma hovioikeuteen". MTV3 (in Finnish). 27 June 2000. Retrieved 18 November 2011.
- ^ "Hovioikeus: Ei syytteitä Jyväskylän junaonnettomuudesta". MTV3 (in Finnish). 23 November 2001. Retrieved 18 November 2011.
- Literature
- Alppivuori, Kari; Allinniemi, Jouko; Aho, Pekka; Kaukonen, Esko (1999). A1/1998R Train accident at Jyväskylä on March 6, 1998 (in Finnish and English). Accident Investigation Board of Finland. ISBN 951-836-009-X. ISSN 1239-5315.
External links[]
- Media related to Jyväskylä rail accident at Wikimedia Commons
- Railway accidents in 1998
- Derailments in Finland
- 1998 in Finland
- Transport in Jyväskylä
- Accidents and incidents involving VR Group
- March 1998 events in Europe