KRI Banda Aceh (593)
KRI Banda Aceh on 7 October 2014
| |
History | |
---|---|
Indonesia | |
Name | Banda Aceh |
Namesake | Banda Aceh |
Ordered | 28 March 2005 |
Builder | PT PAL, Surabaya |
Laid down | 7 December 2007 |
Launched | 19 March 2010 |
Commissioned | 21 March 2011 |
Identification | Pennant number: 593 |
Status | Active |
General characteristics | |
Class and type | Makassar-class landing platform dock |
Tonnage | 12,400 tons |
Displacement |
|
Length | 122 meters |
Beam | 22 meters |
Height | 56 meters |
Draft | 4.9 meters |
Decks | (Tank Deck); 6.7 meter,(Truck Deck); 11.3 meter |
Propulsion |
|
Speed |
|
Range | 30 days, up to 10,000 Nm |
Endurance | +45 days |
Boats & landing craft carried | 2 x LCVP |
Capacity | up to 35 infantry vehicles |
Troops | 354 troops |
Complement | accommodations up to 507 persons |
Crew | 126 crew |
Armament | 1 x Bofors 40mm SAK40/L70
2 x 20mm Oerlikon 2 x Mistral Simbad |
Aircraft carried | Up to 5 helicopters |
Aviation facilities | 2 helideck spot (Medium-sized helicopters) |
KRI Banda Aceh (593) is the fourth ship of the Makassar-class landing platform dock of the Indonesian Navy.
Development and design[]
Indonesia signed a US$150 million contract in December 2004[1] and the first two units were built in Busan, South Korea. The remaining two were built at Indonesia's PT PAL shipyard in Surabaya with assistance from Daesun.The contract for the 3rd and 4th LPD to be built in Indonesia was signed with PT PAL on March 28, 2005.
On 19 October 2006, the first of the two Indonesian-built units, was laid down in a ceremony by Admiral Slamet Subiyanto, Chief of Staff, Indonesian Navy.[2] The 3rd and 4th units had been designed to function as flagships with provisions for a command and control system, 57mm gun and air defence systems.
The 5th ship ordered by Indonesian navy on January 11, 2017.[3] First steel cutting ceremony for said ship was conducted on April 28, 2017.[3] The ship's keel was laid on August 28. 2017.[4]
Construction and career[]
Banda Aceh was laid down 7 December 2007 and launched on 19 March 2010 by PT PAL at Surabaya. She was commissioned on 21 March 2011.
She participated in RIMPAC 2014.
Gallery[]
KRI Banda Aceh, KRI Sultan Iskandar Muda and USCGC Waesche on 7 June 2012.
KRI Banda Aceh arrives at Pearl Harbor for RIMPAC on 25 June 2014.
References[]
- ^ "Daewoo International to Export 4 Warships to Indonesia". Archived from the original on 13 August 2010. Retrieved 9 June 2010.
- ^ "PAL Indonesia gaining the ordered for 2 units Landing Platform Dock". Archived from the original on 12 September 2007. Retrieved 9 September 2007.
- ^ Jump up to: a b "PT PAL Mulai Garap Kapal LPD Pesanan TNI AL".
- ^ "Keel Laying Lebih Awal, Kapal LPD TNI AL Diharapkan Cepat Rampung".
External links