Kelana Jaya line
Kelana Jaya Line | ||
---|---|---|
5![]() | ||
![]() Bombardier Innovia Metro at KL Sentral station | ||
Overview | ||
Native name | LRT Laluan Kelana Jaya | |
Status | Fully operational | |
Owner | Prasarana | |
Line number | 5 (Ruby) | |
Locale | Klang Valley | |
Termini | KJ1 Gombak KJ37 Putra Heights | |
Stations | 37[1] | |
Website | myrapid | |
Service | ||
Type | Rapid transit | |
Services | Gombak–Putra Heights | |
Operator(s) | Rapid Rail | |
Depot(s) | Subang Depot | |
Rolling stock | Bombardier Innovia Metro 200 & 300 266 carriages; 2-car & 4-car trainsets Width: 2.65 m (8 ft 8 in) - narrow profile Length: 67.1 m (220 ft) & 33.7 m (111 ft) | |
Daily ridership | 329,406 (2019)[2] | |
Ridership | 94.658 million (2019) | |
History | ||
Opened | Phase 1 Kelana Jaya - Pasar Seni 1 September 1998 Phase 2 Pasar Seni - Gombak 1 June 1999 | |
Last extension | Kelana Jaya - Putra Heights 30 June 2016 | |
Technical | ||
Line length | 46.4 km (28.8 mi) | |
Character | Mostly elevated Subsurface station(s): Sri Rampai Underground station(s): Ampang Park - Masjid Jamek | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge Standard gauge | |
Electrification | Fourth rail 750 V DC – Linear induction motor | |
Operating speed | 80 km/h (50 mph) | |
|