Line 5 (Chennai Metro)

From Wikipedia, the free encyclopedia

Line 5 (Red Line)
Overview
StatusUnder Construction
OwnerCMRL
Termini
Stations48
Service
TypeRapid Transit
SystemChennai Metro
Operator(s)Chennai Metro Rail Limited
Technical
Line length47 km (29 mi)
Number of tracks2
Character5.3 km Underground and 41.7 km Elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV , 50 Hz AC through Overhead catenary
Operating speed80 km/hr (50 mph)

The Red Line or Line 5 is one of the three lines of Chennai Metro, Phase 2 Project . The under construction line stretches from to . The line will consist of 48 stations, out of which 6 are underground, 1 at grade and 41 are elevated.

Phase II[]

E. Sreedharan, in 2013, stressed on the need of a greater expansion of Chennai metro network by undertaking subsequent phases. In July 2016, the then Chief Minister J. Jayalalithaa announced that Chennai Metro Phase 2 would be 104 km long and have 104 stations.[1] In July 2017, in a suo motu statement in the State Legislative Assembly, an extension in Phase II, involving an extension of Line 4 from Lighthouse up to Poonamallee, with the MadhavaramSholinganallur and Lighthouse–Poonamallee lines intersecting at Alwarthirunagar was announced, making Phase 2 118.91 km long.[2] The key focus for Phase 2 is to connect the northern (Madhavaram, Thiruvottriyur, Redhills) and southern parts (Siruseri, Sholinganallur) and the east parts of Chennai (Light house, Mylapore) to the western parts of Chennai (Porur, Poonamallee). Tamil Nadu Road Development Corporation (TNRDC) has also proposed an elevated 17.2 km (10.7 mi) four-lane corridor for the IT corridor from Taramani to Siruseri. CMRL will construct its piers on top of the flyover built by TNRDC.

Of the three corridors in phase II, Line 5 features three crossovers, where the Metro trains run over flyovers. Trains will zip over the Porur and Medavakkam flyovers, the Kathipara grade separator and another yet-to-be built flyover between Mugalivakkam and Ramapuram.[3]

Line Terminal Length
(km)
Number of stations Rolling stock
Line 3 45.81 kilometres (28.47 mi) 48 21 trains of 3 cars each exclusively for Line 3 plus 25 trains of 3 cars each and 18 trains of 6 cars each common for Lines 3 and 5 circular train operation.
Line 4 Poonamallee Bypass Lighthouse 26.1 kilometres (16.2 mi) 28[4] 26 trains of 3 cars each
Line 5 47 kilometres (29 mi) 48 22 trains of 3 cars each and 4 trains of 6 cars each exclusively for Line 5 plus 25 trains of 3 cars each and 18 trains of 6 cars each common for Lines 3 and 5 circular train operation as mentioned above in Line 3 table.
Total 118.91 km (73.89 mi) 124 94 trains of 3 cars each and 22 trains of 6 cars each.

The lines 3, 4 and 5 are proposed to have 42.41 km (26.35 mi) underground and 76.5 km (47.5 mi) elevated routes. The present estimate for the phase 2 stands at Rs. 61,000 crore and approval has been received from the state government. Foundation stone for phase 2 was laid on 20 November 2020 by Union Home Minister Amit Shah and construction for the phase from Poonamallee to Power House of Line 4 commenced on 1 June 2021.[5][6] The construction work for certain sections of the second phase of Chennai Metro Rail project is hit due to delay in the selection of the general consultant (GC) after concerns were raised by more than 50% of bidders on the CMRL shortlisting companies based on their technical qualifications. Addressing an event in Chennai, Prime Minister Narendra Modi on Sunday 14 February 2021 said the Centre has set aside Rs 63,000 crore in this year’s Budget for the second phase of Chennai Metro totaling 135 km, which is one of the largest projects sanctioned for any city in one-go.[7] The map and list of stations for all 3 proposed lines to be part of Phase 2 has also been published by CMRL.

There are also plans to extend the Poonamallee line (Line 4) by 4 km to the proposed township of Tirumazhisai in the western part of the city[8] by CMRL.[9] Phase 2 is expected to be completed by 2026.[10] Phase 2 will have trains with three and six coaches, making a total of 414 coaches.[11]

The stations in phase II will be smaller at 150 m (490 ft) compared with 220 m (720 ft) in phase I. Phase II will have three depots, namely, Madhavaram (27.8 hectares), SIPCOT (4.5 ha [11 acres]), and Poonamallee (15.4 ha [38 acres]).[12]

CMRL has decided to implement LRT Metrolite, covering 17 km connecting Tambaram and Velachery railway stations along the Velachery -Tambaram Road and in February 2021, the state assembly announced that the feasibility study had started for the same to soon prepare a dpr.

Stations[]

Red Line
S.No Station Name Connections Layout Opened
English Tamil
1 மாதவரம் பால் பண்ணை Line 3 (Chennai Metro) Underground UC
2 Madhavaram Depot மாதவரம் பணிமனை None At-grade UC
3 அசிசி நகர் None Elevated UC
4 மஞ்சம்பாக்கம் None Elevated UC
5 வேல்முருகன் நகர் None Elevated UC
6 மாதவரம் பேருந்து முனையம் Bus interchange Bus Terminus Elevated UC
7 சாஸ்திரி நகர் None Elevated UC
8 இரெட்டேரி சந்திப்பு None Elevated UC
9 கொளத்தூர் சந்திப்பு None Underground UC
10 சீனிவாச நகர் None Underground UC
11 வில்லிவாக்கம் Mainline rail interchange Chennai Suburban Railways Underground UC
12 வில்லிவாக்கம் பேருந்து முனையம் Bus interchange Bus Terminus Underground UC
13 வில்லிவாக்கம் எம்.டி.எச். சாலை None Underground UC
14 அண்ணா நகர் மேற்கு Bus interchange Bus Terminus Elevated UC
15 திருமங்கலம் சந்திப்பு None Elevated UC
16 அண்ணா நகர் கே.வி. None Elevated UC
17 கோயம்பேடு நூறடி சாலை None Elevated UC
18 Puratchi Thalaivi Dr. J. Jayalalithaa CMBT புரட்சி தலைவி டாக்டர் ஜெ. ஜெயலலிதா புறநகர் பேருந்து நிலையம்  Green Bus interchange Puratchi Thalaivar Dr. M.G.R Bus Terminus Elevated UC
19 கோயம்பேடு அங்காடி None Elevated UC
20 நடேசன் நகர் None Elevated UC
21 விருகம்பாக்கம் None Elevated UC
22 ஆழ்வார்திருநகர் Line 4 (Chennai Metro) Elevated UC
23 வளசரவாக்கம் Line 4 (Chennai Metro) Elevated UC
24 காரம்பாக்கம் Line 4 (Chennai Metro) Elevated UC
25 ஆலப்பாக்கம் Line 4 (Chennai Metro) Elevated UC
26 போரூர் சந்திப்பு Line 4 (Chennai Metro) Elevated UC
27 முகலிவாக்கம் None Elevated UC
28 ராமாபுரம் None Elevated UC
29 மணப்பாக்கம் None Elevated UC
30 சென்னை வர்த்தக மையம் None Elevated UC
31 பட் சாலை None Elevated UC
32 Aringar Anna Alandur அறிஞர் அண்ணா ஆலந்தூர்  Blue  Green Elevated UC
33 St. Thomas Mount பரங்கிமலை  Green Chennai Suburban Railways Mainline rail interchange Chennai Suburban Railways MRTS Elevated UC
34 ஆதம்பாக்கம் Mainline rail interchange Chennai Suburban Railways MRTS Elevated UC
35 வானுவம்பேட்டை None Elevated UC
36 உள்ளகரம் None Elevated UC
37 மடிப்பாக்கம் None Elevated UC
38 கீழ்க்கட்டளை None Elevated UC
39 ஈச்சங்காடு None Elevated UC
40 கோவிலம்பாக்கம் None Elevated UC
41 வெள்ளக்கல் None Elevated UC
42 மேடவாக்கம் 1 None Elevated UC
43 மேடவாக்கம் 2 None Elevated UC
44 மேடவாக்கம் 3 None Elevated UC
45 பெரும்பாக்கம் None Elevated UC
46 செம்மொழி தமிழாய்வு நிறுவனம் None Elevated UC
47 எல்காட் பூங்கா None Elevated UC
48 சோழிங்கநல்லூர் Line 3 (Chennai Metro) Elevated UC

References[]

  1. ^ Sekar, Sunitha. "104 km, 104 stations: Unveiling Phase II of Metro". The Hindu. Retrieved 24 January 2017.
  2. ^ "Metro's second phase to go up to Poonamallee". The Hindu. Chennai: Kasturi & Sons. 20 July 2017. Retrieved 1 October 2017.
  3. ^ Deepa H. Ramakrishnan and Sunitha Sekar (14 June 2021). "Chennai Metro phase II project will tower over 3 flyovers and Kathipara grade separator". The Hindu. Chennai: Kasturi & Sons. Retrieved 30 December 2021.
  4. ^ U, Tejonmayam. "Metro to link route planned under monorail network". The Times of India. Retrieved 17 February 2019.
  5. ^ Sekar, Sunitha. "Detailed project report for Phase II of Metro Rail ready". The Hindu. Retrieved 24 January 2017.
  6. ^ U, Tejonmayam. "Chennai: Metro rail to trim stations under phase 2". The Times of India. Retrieved 24 January 2017.
  7. ^ Dipak K, Dash. "Ground work for Chennai metro rail phase-2 hit". Times of India. Retrieved 19 February 2021.
  8. ^ Sekar, Sunitha (26 December 2018). "CMRL mulls extending line to Tirumazhisai". The Hindu. Retrieved 1 January 2019.
  9. ^ "Chennai Metro: Corridor-4 extension plans on cards". The New Indian Express. Retrieved 23 January 2021.
  10. ^ "Metro Rail second phase likely to be completed in six years". The New Indian Express. Retrieved 26 April 2019.
  11. ^ Sekar, Sunitha (11 March 2019). "Chennai Metro phase II to have three-coach and six-coach trains". The Hindu. Chennai: Kasturi & Sons. p. 2. Retrieved 1 May 2019.
  12. ^ Sekar, Sunitha (25 April 2019). "For phase II, Chennai Metro will need less private land". The Hindu. Chennai: Kasturi & Sons. p. 3. Retrieved 2 May 2019.
Retrieved from ""