Line 7 (Suzhou Rail Transit)

From Wikipedia, the free encyclopedia
Line 7
 7 
Overview
StatusUnder construction
(one segment is operational)
OwnerSuzhou Rail Transit Co., Ltd
Termini
Muli
Stations33
Service
TypeRapid transit
SystemSuzhou Rail Transit
Operator(s)Suzhou Rail Transit Co., Ltd
Technical
Line length29.6 km
Track gauge1,435 mm (4 ft 8+12 in)

Line 7 of Suzhou Rail Transit is an under construction rapid transit line in Suzhou. Construction started on December 25, 2019.[1] The line will be 29.6 kilometers long.[1]

According to the plans, the part of Line 4 between Hongzhuang and Muli stations will be operated as Line 7.[2]

It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[3]

Stations[]

Station name Connections Distance
km
Location
English Chinese[4]
莫阳 0.000 0.000 Xiangcheng
相城大道北
Suzhou North Railway Station 高铁苏州北  2 
会展中心
青龙港路
富元路
蠡塘河路
春申湖东路
相城区行政中心北
相城区行政中心南  8 
白荡南 SIP
扬东路
扬华路
现代大道西
Central Park 中央公园  1 
中新大道西  6 
黄天荡  5 
娄葑
东兴路西
通园路南  3 
林家潭路 Wuzhong
郭巷  2 
尹中路南
澄湖东路
枫津路
Hongzhuang 红庄  4 
Lishu 蠡墅
Shihu Moshe 石湖莫舍
Yuexi 越溪
Wenxi Lu 文溪路
Tian'edang Lu 天鹅荡路
Suzhouwan North 苏州湾北
Muli 木里

References[]

  1. ^ a b "苏州轨道交通7号线开工建设". 2019-12-25.
  2. ^ "Archived copy". Archived from the original on 2012-07-13. Retrieved 2012-06-29.CS1 maint: archived copy as title (link) (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))[dead link]
  3. ^ 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.
  4. ^ "苏州轨道交通6、7、8号线站名方案征集公告". 2021-01-18.
Retrieved from ""