List of major power stations in Sichuan

From Wikipedia, the free encyclopedia

This page lists the major power stations located in Sichuan Province.

Non-renewable[]

Coal-based[]

Station Name in Chinese Coordinates Capacity (MW) Status Operational units and (type) Under construction units Planned units Reference
Guang'an Power Station 广安电厂 30°31′40″N 106°49′34″E / 30.52778°N 106.82611°E / 30.52778; 106.82611 (Guang'an Power Station) 2,400 Operational 4*300MW, 2*600MW [1][2]
Tianming Power Station 天明电厂 31°52′12″N 104°54′35″E / 31.87000°N 104.90972°E / 31.87000; 104.90972 (Tianming Power Station) 2,000 Under Construction 2*1,000MW [3]
Jiangyou Power Station 江油电厂 31°48′17″N 104°46′10″E / 31.80472°N 104.76944°E / 31.80472; 104.76944 (Jiangyou Power Station) 1,260 Operational 2*300MW, 2*330MW [4]
Luzhou Power Station 泸州电厂 28°46′31″N 105°17′01″E / 28.77528°N 105.28361°E / 28.77528; 105.28361 (Luzhou Power Station) 1,200 Operational 2*600MW 2*600MW [5]
Jintang Power Station 金堂电厂 30°42′20″N 104°34′47″E / 30.70556°N 104.57972°E / 30.70556; 104.57972 (Jintang Power Station) 1,200 Operational 2*600MW 4*600MW [6]
Fuxi Power Station 福溪电厂 28°39′49″N 104°41′01″E / 28.66361°N 104.68361°E / 28.66361; 104.68361 (Fuxi Power Station) 1,200 Operational 2*600MW 2*600MW [7]
Gongxian Power Station 珙县电厂 28°16′08″N 104°40′26″E / 28.26889°N 104.67389°E / 28.26889; 104.67389 (Gongxian Power Station) 1,200 Operational 2*600MW 4*1000MW [8]
Baima Power Station 白马电厂 29°31′30″N 105°00′47″E / 29.52500°N 105.01306°E / 29.52500; 105.01306 (Baima Power Station) 600 Operational 1*600MW 2*600MW
Huayinshan Power Station 华蓥山发电厂 30°53′31″N 107°03′03″E / 30.89194°N 107.05083°E / 30.89194; 107.05083 (Huayinshan Power Station) 600 Operational 2*300MW [9][10]

Gas-based[]

Station Name in Chinese Coordinates Capacity (MW) Status Operational units and (type) Under construction units Planned units Reference
Dazhou Natural Gas Power Station 达州燃气电厂 31°06′54″N 107°29′05″E / 31.11500°N 107.48472°E / 31.11500; 107.48472 (Dazhou Natural Gas Power Station) 700 Operational 2*350MW

Renewable[]

Hydroelectric[]

The installed conventional hydropower capacity in Sichuan province has broken through 31,000MW in present. [11] By 2020, The hydropower installed capacity in Sichuan province will increase to over 90,000 MW, accounting for a quarter share of whole Chinese hydropower installed capacity.

Conventional[]

Station Name in Chinese Coordinates River Total capacity (MW) Dam height (meters) Status Units Reference
Xiangjiaba Hydro Power Station 向家坝水电站 28°38′41″N 104°23′32″E / 28.64472°N 104.39222°E / 28.64472; 104.39222 (Xiangjiaba Hydro Power Station) Yangtse (Jinsha) 7,750 161 Operational 8*800MW, 3*450MW
Xiluodu Hydro Power Station 溪洛渡水电站 28°15′06″N 103°39′34″E / 28.25167°N 103.65944°E / 28.25167; 103.65944 (Xiluodu Hydro Power Station) Yangtse (Jinsha) 13,860 278 Operational 18*770MW
Baihetan Hydro Power Station 白鹤滩水电站 27°13′22″N 102°54′10″E / 27.22278°N 102.90278°E / 27.22278; 102.90278 (Baihetan Hydro Power Station) Yangtse (Jinsha) 16,000 289 Operational/Under construction 16*1,000MW
Wudongde Hydro Power Station 乌东德水电站 26°20′02″N 102°37′48″E / 26.33389°N 102.63000°E / 26.33389; 102.63000 (Wudongde Dam) Yangtse (Jinsha) 10,200 270 Operational 12*850MW
银江水电站  26°35′17″N 101°45′59″E / 26.58806°N 101.76639°E / 26.58806; 101.76639 (Yinjiang Dam) Yangtse (Jinsha) 390 Under construction
金沙水电站 26°34′24″N 101°38′34″E / 26.57333°N 101.64278°E / 26.57333; 101.64278 (Jinsha Dam) Yangtse (Jinsha) 560 Under construction
Guanyinyan Hydro Power Station 观音岩水电站 26°31′13″N 101°26′15″E / 26.52028°N 101.43750°E / 26.52028; 101.43750 (Guanyinyan Hydro Power Station) Yangtse (Jinsha) 3,000 159 Operational 5*600MW
拖顶水电站 Jinsha 2060 In prep
日冕水电站 Jinsha 2700 In prep
白丘水电站 Jinsha 1500 Proposed
俄南水电站 Jinsha 900 Proposed
旭龙水电站 Jinsha 2,400 In prep [12] [13]
昌波水电站 Jinsha 826 45 Proposed [14]
Suwalong Hydro Power Station 苏洼龙水电站 Jinsha 1340 112 Under Construction
巴塘水电站 Jinsha 750 69 Under Construction [15]
Lawa Hydro Power Station 拉哇水电站 30°05′14″N 099°02′26″E / 30.08722°N 99.04056°E / 30.08722; 99.04056 (Lawa Dam) Jinsha 2,000 239 Under Construction
Yebatan Hydro Power Station 叶巴滩水电站 Jinsha 2,240 217 Under Construction 4*510MW, 1*200MW [16]
波罗水电站 Jinsha 960 Proposed
岩比水电站 Jinsha 300 Proposed
岗托水电站 Jinsha 1100 Proposed
桐子林水电站 26°42′25″N 101°51′01″E / 26.70694°N 101.85028°E / 26.70694; 101.85028 (Tongzilin Hydro Power Station) Yalong 600 71.3 Operational 4*150MW
Ertan Hydro Power Station 二滩水电站 26°49′15″N 101°46′52″E / 26.82083°N 101.78111°E / 26.82083; 101.78111 (Ertan Hydro Power Station) Yalong 3,300 240 Operational 6*550MW [17]
Guandi Hydro Power Station 官地水电站 27°44′39″N 101°55′47″E / 27.74417°N 101.92972°E / 27.74417; 101.92972 (Guandi Hydro Power Station) Yalong 2,400 168 Operational 4*600MW
Jinping II Hydro Power Station 锦屏二级水电站 Inlet 28°14′20″N 101°38′32″E / 28.23889°N 101.64222°E / 28.23889; 101.64222 (Jingping II, inlet), Outlet 28°08′16″N 101°47′32″E / 28.13778°N 101.79222°E / 28.13778; 101.79222 (Jingping II, outlet) Yalong 4,800 34 Operational 8*600MW
Jinping I Hydro Power Station 锦屏一级水电站 28°10′53″N 101°37′45″E / 28.18139°N 101.62917°E / 28.18139; 101.62917 (Jingping I Hydro Power Station) Yalong 3,600 305 Operational 6*600MW
卡拉水电站 28°24′05″N 101°16′37″E / 28.40139°N 101.27694°E / 28.40139; 101.27694 (Kala Hydro Power Station) Yalong 1,080 128 Under construction
杨房沟水电站 28°38′39″N 101°12′12″E / 28.64417°N 101.20333°E / 28.64417; 101.20333 (Yangfanggou Hydro Power Station) Yalong 1,500 158 Under construction
孟底沟水电站 28°56′54″N 101°10′47″E / 28.94833°N 101.17972°E / 28.94833; 101.17972 (Mendigou Power Station) Yalong 2,400 198 In prep 4*600MW [18]
楞古水电站 29°24′58″N 101°08′29″E / 29.41611°N 101.14139°E / 29.41611; 101.14139 (Lenggu Hydro Power Station) Yalong 2,718 174 In prep
牙根一级水电站 30°05′25″N 101°00′17″E / 30.09028°N 101.00472°E / 30.09028; 101.00472 (Yageng I Hydro Power Station) Yalong 214 Proposed
牙根二级水电站 29°40′04″N 101°05′02″E / 29.66778°N 101.08389°E / 29.66778; 101.08389 (Yageng II Hydro Power Station) Yalong 990 In prep
Lianghekou Hydro Power Station 两河口水电站 30°11′11″N 101°00′43″E / 30.18639°N 101.01194°E / 30.18639; 101.01194 (Lianghekou Hydro Power Station) Yalong 3,000 293 Under Construction 6*500MW
龚坝沟水电站 Yalong 500 Proposed
共科水电站 Yalong 400 Proposed
新龙水电站 Yalong 500 Proposed
英达水电站 Yalong 500 Proposed
通哈水电站 Yalong 200 Proposed
格尼水电站 Yalong 200 Proposed
阿达水电站 Yalong 250 Proposed
热巴水电站 Yalong 250 Proposed
仁青岭水电站 Yalong 300 Proposed
安谷水电站 29°30′51″N 103°38′19″E / 29.51417°N 103.63861°E / 29.51417; 103.63861 (Angu Hydro Power Station) Dadu 772 40.7 Operational 4*190MW, 1*12 [19]
沙湾水电站 29°20′05″N 103°36′38″E / 29.33472°N 103.61056°E / 29.33472; 103.61056 (Shawan Hydro Power Station) Dadu 480 Operational 4*120MW [20]
铜街子水电站 29°15′24″N 103°37′58″E / 29.25667°N 103.63278°E / 29.25667; 103.63278 (Tongjiezi Hydro Power Station) Dadu 600 82 Operational 4*150MW [citation needed]
龚嘴水电站 29°18′12″N 103°28′45″E / 29.30333°N 103.47917°E / 29.30333; 103.47917 (Gongzui Hydro Power Station) Dadu 770 85.5 Operational 7*110MW
沙坪二级水电站 29°14′12″N 103°12′28″E / 29.23667°N 103.20778°E / 29.23667; 103.20778 (Shaping II Hydro Power Station) Dadu 348 63 Under construction 6*58MW
沙坪一级水电站 29°17′34″N 103°07′59″E / 29.29278°N 103.13306°E / 29.29278; 103.13306 (Shaping II Hydro Power Station) Dadu 330 Proposed 6*55MW
枕头坝二级水电站 Inlet 29°16′46″N 103°01′46″E / 29.27944°N 103.02944°E / 29.27944; 103.02944 (Zhengtouba II, inlet), Outlet 29°15′59″N 103°04′53″E / 29.26639°N 103.08139°E / 29.26639; 103.08139 (Zhangtouba II, outlet) Dadu 246 Operational
枕头坝一级水电站 29°14′19″N 103°02′41″E / 29.23861°N 103.04472°E / 29.23861; 103.04472 (Zhengtouba I Hydro Power Station) Dadu 720 Under construction 4*180MW
深溪沟水电站 29°18′06″N 102°55′58″E / 29.30167°N 102.93278°E / 29.30167; 102.93278 (Shenxigou Hydro Power Station) Dadu 660 49.5 Operational 4×165MW
Pubugou Hydro Power Station 瀑布沟水电站 29°12′34″N 102°50′11″E / 29.20944°N 102.83639°E / 29.20944; 102.83639 (Pubugou Hydro Power Station) Dadu 3,600 186 Operational 6*600MW
老鹰岩水电站 Dadu 640 In prep
龙头石水电站 29°20′08″N 102°13′02″E / 29.33556°N 102.21722°E / 29.33556; 102.21722 (Longtoushi Hydro Power Station) Dadu 700 72.5 Operational 4*175MW
Dagangshan 大岗山水电站 29°26′57″N 102°15′10″E / 29.44917°N 102.25278°E / 29.44917; 102.25278 (Dagangshan) Dadu 2600 210 Operational 4*650MW
硬梁包水电站 Inlet 29°44′18″N 102°12′13″E / 29.73833°N 102.20361°E / 29.73833; 102.20361 (Yingliangbao, inlet), Outlet 29°38′06″N 102°10′33″E / 29.63500°N 102.17583°E / 29.63500; 102.17583 (Yingliangbao, outlet) Dadu 1,160 (run-of-the-river, 15.1 km tunnel) In prep 4*270MW, 1*36MW
泸定水电站 29°56′47″N 102°13′37″E / 29.94639°N 102.22694°E / 29.94639; 102.22694 (Luding) Dadu 920 85.5 Operational 4*230MW
黄金坪水电站 30°09′19″N 102°10′41″E / 30.15528°N 102.17806°E / 30.15528; 102.17806 (Huanjinping) Dadu 850 95.5 Under construction 4*200MW
Changheba Hydro Power Station 长河坝水电站 30°15′43″N 102°11′43″E / 30.26194°N 102.19528°E / 30.26194; 102.19528 (Changheba Hydro Power Station) Dadu 2,600 240 Operational 4*650MW
Houziyan Hydro Power Station 猴子岩水电站 30°32′46″N 102°03′29″E / 30.54611°N 102.05806°E / 30.54611; 102.05806 (Houziyan Hydro Power Station) Dadu 1,700 223.5 Under construction 4*425MW
巴底水电站 Dadu 680 112 Proposed
金川水电站 31°35′09″N 102°04′39″E / 31.58583°N 102.07750°E / 31.58583; 102.07750 (Jinchuan Hydro Power Station) Dadu 860 111.5 Under construction 4*215MW
Shuangjiankou Hydro Power Station 双江口水电站 31°47′53″N 101°54′50″E / 31.79806°N 101.91389°E / 31.79806; 101.91389 (Shuangjiankou Hydro Power Station) Dadu 2,000 314 Under construction 4*500MW
卜寺沟水电站 Dadu 360 130 Proposed
达维水电站 Dadu 270 107 Proposed 2*135MW
巴拉水电站 Dadu 700 220 Under construction
下尔呷水电站 Dadu 540 Proposed
Kajiwa Hydro Power Station 卡基娃水电站 28°42′26″N 100°53′35″E / 28.70722°N 100.89306°E / 28.70722; 100.89306 (Kajiwa Hydro Power Station) Muli 452.4 171 Under construction 4*110MW
Lizhou Hydro Power Station 立洲水电站 Muli 355 138 Under construction 3*115MW, 1*10MW
上通坝水电站 Muli 240 Under construction 3*80MW
木里河沙湾水电站 Muli 280 Operational
Zipingpu Hydro Power Station 紫坪铺水电站 31°02′06″N 103°34′27″E / 31.03500°N 103.57417°E / 31.03500; 103.57417 (Zipingpu Hydro Power Station) Min 760 156 Operational 4*190MW
太平驿水电站 31°13′33″N 103°29′11″E / 31.22583°N 103.48639°E / 31.22583; 103.48639 (Taipingyi Hydro Power Station) Min 260 Operational 4*65MW
福堂水电站 31°29′03″N 103°36′12″E / 31.48417°N 103.60333°E / 31.48417; 103.60333 (Futang Hydro Power Station) Min 360 Operational 4*90MW
犍为航电枢纽 29°14′18″N 103°55′19″E / 29.23833°N 103.92194°E / 29.23833; 103.92194 (Jianwei Hydro Power Station) Min 500.4 Operational 9*55.6MW
龙溪口航电枢纽 29°03′39″N 104°08′34″E / 29.06083°N 104.14278°E / 29.06083; 104.14278 (Longxikou Hydro Power Station) Min 480 Under Construction 9*53.3MW
Baozhusi Hydro Power Station 宝珠寺水电站 32°31′12″N 105°36′43″E / 32.52000°N 105.61194°E / 32.52000; 105.61194 (Baozhusi Hydro Power Station) Bailong 700 132 Operational 4*175MW
Qiaoqi Hydro Power Station 硗碛水电站 Baoxinghe 240 125 Operational 3*80MW
Yele Hydro Power Station 冶勒水电站 28°55′08″N 102°13′03″E / 28.91889°N 102.21750°E / 28.91889; 102.21750 (Baozhusi Hydro Power Station) Nanyahe 240 124.5 Operational
Jinwo Hydro Power Station 金窝水电站 Tianwanhe 280 124.5 Operational 2*130MW
Renzonghai Hydro Power Station 仁宗海水电站 Tianwanhe 240 56 Operational
小天都水电站 Wasigou 240 39 Operational
Tingzikou Hydro Power Station 亭子口水电站 31°49′24″N 105°52′07″E / 31.82333°N 105.86861°E / 31.82333; 105.86861 (Tingzikou Hydro Power Station) Jialing 1,100 116 Operational 4*275MW
独松水电站 Big Jinchuan 1,360 111.5 Proposed
Maoergai Hydro Power Station 毛尔盖水电站 32°03′56″N 103°13′55″E / 32.06556°N 103.23194°E / 32.06556; 103.23194 (Maoergai Hydro Power Station) Heishui 420 147 Operational 3*140MW
剑科水电站 Maoergai 246 83 Under construction 3*82MW
江边水电站 28°36′18″N 101°41′58″E / 28.60500°N 101.69944°E / 28.60500; 101.69944 (Jiangbian Hydro Power Station) Jiulong 330 Under construction 3*110MW
溪古水电站 Jiulong 249 Under construction 3*83MW
关州水电站 Xiaojinchuan 240 Under construction 3*80MW
吉牛水电站 Geshizha 240 Under construction 2*120MW
绰斯甲水电站 Chuosijia 392 Under construction
Quxue Hydro Power Station 去学水电站 Shuoqu 246 164.2 Under construction 2*123MW
Guwa Hydro Power Station 古瓦水电站 Shuoqu 222 150 Operational 3*74MW
Gungqiao Hydro Power Station 锅浪跷水电站 30°0′15″N 102°28′05″E / 30.00417°N 102.46806°E / 30.00417; 102.46806 (Guolangqiao Hydro Power Station) Tianquanhe 220 186.3 Under construction 3*70MW

*Jingping II Hydro Power Station is a Run-of-the-river type of power station. There are 4 water tunnels which are 16.6 km long in average each to divert the water through the . The deepest point of the tunnel is 2,525 meters from the top of mountain.

Pumped-storage[]

Station Name in Chinese Coordinates Capacity (MW) Status Generator units Height difference (meters) Under construction units Planned units Reference
李家山抽水蓄能电站 Proposed [21]

Wind[]

Station Name in Chinese Coordinates Operational capacity (MW) Status Units
德昌风电场 16 Underconstruction 8*2MW

References[]

  1. ^ "四川广安发电有限责任公司". ccpi.gov.cn. Archived from the original on 2010-04-05. Retrieved 2020-12-09.
  2. ^ "四川广安电厂240万千瓦规划装机容量全投产". China Radio International. 2007-07-05.
  3. ^ "神华四川天明电厂2×100万千瓦新建工程#2机组 电除尘顺利开工 - 北极星电力新闻网". news.bjx.com.cn. Retrieved 2017-09-10.
  4. ^ "受灾严重的省属企业 江油电厂全面复发电". sichuan.scol.cn. 2009-03-04. Archived from the original on 2011-07-07.
  5. ^ "四川泸州电厂投运". power.in-en.com. 2008-02-28. Archived from the original on 2013-01-26.
  6. ^ "国电成都金堂电厂正式投入运营". power.in-en.com. 2007-09-25. Archived from the original on 2010-12-30.
  7. ^ "投资46亿 四川中电(宜宾)福溪电厂600MW火电项目开工(组图)". 163.com. 2009-11-18. Archived from the original on 2012-03-07.
  8. ^ http://www.ocn.com.cn/qyqb/2006hlfd03.htm
  9. ^ "Archived copy". Archived from the original on 2011-07-14. Retrieved 2010-10-08.CS1 maint: archived copy as title (link)
  10. ^ "Archived copy". Archived from the original on 2011-07-07. Retrieved 2010-10-08.CS1 maint: archived copy as title (link)
  11. ^ "占全国1/4四川水电装机容量未来十年翻一番". news.china.com.cn. 2010-09-10. Archived from the original on 2012-03-04.
  12. ^ 网易 (2021-07-23). "旭龙水电站导流洞工程完成首次爆破". www.163.com. Retrieved 2021-08-22.
  13. ^ "云南旭龙水电站2号索道桥建成通车-国际电力网". power.in-en.com. Retrieved 2021-08-22.
  14. ^ "金沙江上游昌波水电站环境影响评价公众参与第一次公示". www.batang.gov.cn. Retrieved 2021-08-22.
  15. ^ "总投资102亿元!甘孜州巴塘水电站开工建设,预计2022年投产!_工作". www.sohu.com. Retrieved 2019-07-07.
  16. ^ 网易 (2020-12-27). "高程2894米,叶巴滩水电站左右岸边坡均开挖至坝顶". www.163.com. Retrieved 2021-06-20.
  17. ^ "Archived copy". Archived from the original on 2011-07-07. Retrieved 2010-09-29.CS1 maint: archived copy as title (link)
  18. ^ "雅砻江孟底沟水电站项目获得核准 --中国水力发电工程学会". www.hydropower.org.cn. Retrieved 2021-06-20.
  19. ^ "Archived copy". Archived from the original on 2014-02-19. Retrieved 2012-04-01.CS1 maint: archived copy as title (link)
  20. ^ http://blog.sina.com.cn/s/blog_5e3fe91f0100dctv.html
  21. ^ "四川金堂要建抽水蓄能水电站". www.huaxiawind.com.cn. 2010-08-16. Archived from the original on 2012-03-13.
Map all coordinates using: OpenStreetMap 
Download coordinates as: KML
Retrieved from ""