List of tallest buildings in North Carolina
This article needs additional citations for verification. (August 2019) |
This list of tallest buildings in North Carolina ranks skyscrapers in the U.S. state of North Carolina by height. The tallest building in North Carolina is the Bank of America Corporate Center in Charlotte, which contains 60 floors and is 871 ft (265 m) tall. The second-tallest building in the state is the Duke Energy Center also in Charlotte, North Carolina, which rises 786 feet (240 m) above the ground.
Tallest buildings[]
This list ranks North Carolina skyscrapers that stand at least 200 feet (60.96 m) tall, based on standard height measurement. This includes spires and architectural details but does not include antenna masts or other objects not part of the original plans. Existing structures are included for ranking purposes based on present height.
Rank | Name | Image | Height ft / m |
Floors | Year | City | Notes |
---|---|---|---|---|---|---|---|
1 | Bank of America Corporate Center | 871 / 265[1] | 60 | 1992 | Charlotte | 56th-tallest in the United States and the tallest between Philadelphia and Atlanta; tallest building in Charlotte and North Carolina since 1992[2] | |
2 | 550 South Tryon | 786 / 240[3] | 54 | 2010 | Charlotte | 479th-tallest in the world; 62nd-tallest in the United States; 2nd-tallest in North Carolina. Tallest building constructed in Charlotte in the 2010s.[4][5] It is the largest building in Charlotte by leasable square feet.[6] | |
3 | Truist Center | 659 / 201[7] | 47 | 2002 | Charlotte | Tallest building constructed in Charlotte in the 2000s.[8][9] It is the fourth largest building in Charlotte by leasable square feet.[6] | |
4 | Bank of America Tower | 632 / 193[10] | 35 | 2019 | Charlotte | It is the seventh largest building in Charlotte by leasable square feet.[6] | |
5 | One Wells Fargo Center | 588 / 179[11] | 42 | 1988 | Charlotte | Tallest building constructed in Charlotte in the 1980s.[12][13][14] It is the third largest building in Charlotte by leasable square feet.[6] | |
6 | The Vue | 560 / 170[15] | 51 | 2010 | Charlotte | 5th Tallest building in Charlotte and the tallest residential high rise in North Carolina[16] | |
7 | PNC Plaza | 538 / 164[17] | 32 | 2008 | Raleigh | Previously known as RBC Plaza; was the U.S. headquarters of RBC Bank | |
8 | Bank of America Plaza | 503 / 153[18] | 40 | 1974 | Charlotte | [19][20][21] It is the ninth largest building in Charlotte by leasable square feet.[6] | |
9 | 1 Bank of America Center | 484 / 148[22] | 32 | 2010 | Charlotte | Also known as 150 North College[23][24] or 1 BAC | |
10 | 300 South Tryon[a] | 463 141[25] | 25 | 2017 | Charlotte | Anchored by Barings[26][27][28] | |
11 | 121 West Trade | 462 / 141[29] | 32 | 1990 | Charlotte | Also known as the Interstate Tower[30][31] | |
12 | 100 North Main Street | 460 / 140[32] | 34 | 1995 | Winston-Salem | Tallest building in Winston-Salem since 1995, as well as the tallest in North Carolina outside of Charlotte and Raleigh | |
13 | Three Wells Fargo Center | 450 / 137[33] | 32 | 2000 | Charlotte | Originally known as Three First Union Center[34][35] It is the fifth largest building in Charlotte by leasable square feet.[6] | |
14 | Fifth Third Center | 447 / 136.3[36] | 30 | 1997 | Charlotte | Also known as the IJL Financial Center and 201 North Tryon[37][38] | |
Museum Tower | 447 / 136.3[39] | 42 | 2017 | Charlotte | 43-story apartment tower developed by Childress Klein, built atop of the Mint Museum | ||
16 | Two Wells Fargo Center | 433 / 132[40] | 32 | 1971 | Charlotte | Originally known as Two First Union Center[41][42] It is the eighth largest building in Charlotte by leasable square feet.[6] | |
17 | Two Hannover Square | 431 / 131[43] | 29 | 1991 | Raleigh | Commonly referred to as the "BB&T Building"[44] | |
18 | Ally Charlotte Center | 427 / 115.2[45] | 26 | 2021 | Charlotte | Construction started in December 2016. Delivered on May 3, 2021.[46][47][48][49] It is the tenth largest building in Charlotte by leasable square feet.[6] | |
19 | Ascent Uptown | 426 / 129.8[50] | 33 | 2017 | Charlotte | 32-story apartment tower developed and owned by Greystar Real Estate Partners | |
20 | Avenue | 425 / 130[51] | 36 | 2007 | Charlotte | [52][53] | |
21 | 400 South Tryon | 420 / 128[54] | 32 | 1974 | Charlotte | Also known as Duke Energy Plaza. Originally known as Wachovia Corporate Center and First Union Corporate Center.[55][56][57] | |
22 | Winston Tower | 410 / 125[58] | 29 | 1966 | Winston-Salem | Tallest building in Winston-Salem from 1966 to 1995 | |
23 | Wells Fargo Capitol Center | 400 / 122[59] | 30 | 1990 | Raleigh | ||
24 | Carillon Tower | 394 / 120[60] | 24 | 1991 | Charlotte | ||
25 | Charlotte Plaza | 388 / 119[61] | 28 | 1982 | Charlotte | [62] | |
26 | The Ellis | 384 / 117[63] | 33 | 2021 | Charlotte | 549 apartment units with 19,000 square feet of retail. Completed June 2021.[64] It is one of the tallest residential towers in Charlotte.[65] | |
FNB Tower Charlotte | 384 / 117[66] | 30 | 2021 | Charlotte | FNB Corporation anchored building will include 156,000 square feet of office space, 196 luxury apartments, and 2,300 square feet of retail. Ground broke in December 2018.[67] The building opened on July 21, 2021.[68] | ||
28 | Lincoln Financial Building | 374 / 114[69] | 20 | 1990 | Greensboro | Tallest building in Greensboro | |
29 | Lowe's Global Technology Center | 357 / 108.814[70] | 23 | 2021 | Charlotte | Being constructed across from the Design Center of the Carolinas, will be anchored by Lowe's. Construction started August 2019.[71] Once completed it will become the tallest building in Charlotte outside of Uptown.[72] | |
30 | University Tower | 356 / 108[73] | 17 | 1986 | Durham | Tallest building in Durham | |
31 | Catalyst | 338 / 103[74] | 27 | 2009 | Charlotte | ||
32 | GMAC Tower | 330 / 101[75] | 21 | 1980 | Winston-Salem | ||
33 | 525 North Tryon | 330 / 100.6[76] | 19 | 1999 | Charlotte | ||
34 | Wells Fargo Tower | 328.50 / 100 | 21 | 1989 | Greensboro | Office | |
35 | TradeMark | 325 / 99.1 [77] | 28 | 2007 | Charlotte | ||
36 | First Citizens Plaza | 320 / 97.5 [78] | 23 | 1987 | Charlotte | [79][80][81] | |
AC Hotel/Residence Inn Charlotte EpiCentre | 320 (97.5)[82] | 23 | 1987 | Charlotte | [83][84][85] | ||
38 | SkyHouse Uptown North Tower | 318 / 96.9 [86] | 24 | 2015 | Charlotte | [87] | |
SkyHouse Uptown South Tower | 318 / 96.9 [88] | 24 | 2017 | Charlotte | [89] | ||
40 | The Arlington | 310 / 94.5 [90] | 24 | 2002 | Charlotte | ||
Skye | 310 / 94.5[91] | 23 | 2013 | Charlotte | [92][93][94] | ||
42 | Honeywell Tower | 305 / 93.05[95] | 23 | 2021 | Charlotte | Construction starting September 2019. The third building as part of the Legacy Union development.[96] | |
JW Marriott Charlotte | 305 (93.05)[97] | 22 | 2021 | Charlotte | Construction started in December 2018. Part of the Ally Charlotte Center. Once completed it will be the 7th largest hotel in Charlotte by number of rooms with 381 rooms.[98][99] The hotel opened August 17, 2021.[100] | ||
44 | 101 Independence Center | 301 / 91.8[101] | 22 | 193 | Charlotte | [102][103][104] | |
45 | BB&T Center | 300 / 91.4[105] | 22 | 1974 | Charlotte | [106][107][108] | |
One City Center | 300 / 91.44[109] | 27 | 2018 | Durham | Mixed use residential. | ||
47 | 200 South Tryon | 299 / 91.1[110] | 18 | 1961 | Charlotte | Tallest building constructed in Charlotte in the 1960s.[111][112][113] | |
48 | The Westin Charlotte | 293 / 89.3[114] | 25 | 2003 | Charlotte | Largest hotel in Charlotte by number of rooms[98] | |
NASCAR Plaza | 293 / 89.3[115] | 20 | 2009 | Charlotte | [116][117][118] | ||
50 | Sheraton Greensboro Hotel at Four Seasons | 270 / 82[119] | 28 | 1991 | Greensboro | Tallest hotel in Greensboro | |
51 | Renaissance Plaza | 256.50 / 78[120] | 19 | 1989 | Greensboro | ||
52 | The Tower at Mutual Plaza | 252 (77)[121] | a14 | 1965 | Durham | Headquarters of N.C Mutual Life Insurance. Tallest building in Durham from 1965 to 1986. | |
53 | Jefferson Standard Building | 233 / 71[122] | 18 | 1923 | Greensboro | Tallest building in Greensboro from 1923 to 1989 | |
54 | Center Pointe | 233 / 71[123] | 16 | 1966 | Greensboro | ||
55 | Duke Chapel | 210 / 64[124] | 1935 | Durham | Tallest building in Durham from 1935 to 1937. | ||
56 | Hill Building | 200 / 61.6[125] | 17 | 1937 | Durham | 21c Hotel. Tallest building in Durham from 1937 to 1965. A window was broken after a man was pushed off the top floor. |
Tallest under construction[]
This lists buildings that are under construction in North Carolina and are planned to rise at least 200 ft (61 m). Buildings that have already been topped out are also included. As of December 2021 there are 7 buildings under construction.
Name | Image | Height ft (m) |
Floors | Year | City | Notes |
---|---|---|---|---|---|---|
Duke Energy Plaza | 597 / 181.96[126] | 40 | 2022 | Charlotte | Will be leased by Duke Energy. Construction started in May 2019. It will become the new headquarters for Duke.[127] The building topped out on August 20, 2021, as reported by the Charlotte Business Journal.[128] | |
The Eastern | 423 / 128.93[129] | 33 | 2022 | Raleigh | Located in the North Hills area, this tower will feature 376 residential units and 6,500 SF of retail. ]] | |
300H | 263 / 80.16 | 19 | 2021 | Raleigh | Phase 1 of the Raleigh Crossing development.[130] Future headquarters of Pendo.[131] | |
400H | 256 / 72.273 [132] | 20 | Fall 2023 | Raleigh | 144,000 SF office space, 16,000 SF retail, and 242 apartments[133][134] | |
The Tower at Cardinal North Hills | 239 / 73 | 18 | Spring 2023 | Raleigh | Located in the North Hills area, this high rise development will feature 192 residential units.[135] | |
1714 South Boulevard | 318 / 96.9 | 24 | 2024 | Charlotte | 24 story residential tower with 324 apartments. It will be developed by White Point Partners and Greystar. Located at the corner of South Blvd and Kingston in South End. Construction started in December 2021. | |
The Line | 212 / 69.7 | 16 | 2021 | Charlotte | Portman developed office tower with retail anchored by Sycamore Brewing and a food hall. Construction is underway as of 2020[137] The building should be completed in the fourth quarter of 2021.[72] | |
Radius Dilworth | 325 / 99.1 | 26 | 2024 | Charlotte | Two apartment towers at the corner of Morehead Street and Euclid Avenue with a combined total of 626 units.[138] Construction will begin in the fourth quarter of 2021.[139] | |
110 East | 308 / 93.8 | 23 | 2023 | Charlotte | 370,000 square foot office tower with 7,000 square of street level retail at the intersection of South Boulevard and East/West Boulevard. Construction will be starting in the second quarter of 2021.[140][141] |
Proposed and Approved[]
This lists buildings that are proposed, approved, or on hold in North Carolina that are planned to rise at least 200 ft (61 m).
Name | Height* ft / m |
Floors | Year | Status | Primary Purpose | City | Notes |
---|---|---|---|---|---|---|---|
2161 Hawkins | 24 | 2024 | Approved | Residential | Charlotte | Apartment tower with 200 to 300 units, planned next to the current The Line construction site where Sycamore Brewing is currently.[142] | |
Metropolitan Apartment Tower | 285 / 86.86 | 22 | Approved | Residential | Charlotte | Apartment tower with 330 units, planned next to the Metropolitan and Midtown Park.[143] | |
Stream Realty Partners Tower | 20 | 2024 | Approved | Office | Charlotte | 325,000 square foot building on a 1.7 acre lot located directly next to Suffolk Punch and the Lynx Blue Line's New Bern Station in South End, construction will start in the second quarter of 2022 and finish in 2024[144][145] | |
1111 S. Tryon St. Residential Tower | 35 | 2 | Approved | Residential | Charlotte | Apartment tower with 350 units to be developed by Riverside Investment & Development, planned on the site of the Uptown Cabaret and Midnight Diner.[96][146] | |
1111 S. Tryon St. Office Tower | 40 | Approved | Office | Charlotte | Office tower with a minimum of 800,000 square feet to be developed by Riverside Investment & Development, planned on the site of the Uptown Cabaret and Midnight Diner.[96][146] | ||
1728 South Boulevard | 20 | 2025 | Approved | Office | Charlotte | Office Tower that will be a joint venture between White Point Partners, MRP Realty and Barings with 400,000 square of office space, ground floor retail, and a rooftop terrace. The building will be near 1714, which is the 24 story residential tower that is currently under construction. It will built on the lot that Walgreen currently occupies and the store will be on the ground floor once complete. Construction will begin in 2023[147] | |
Southern Land Co. Residential Tower | 30 | 2025 | Approved | Residential | Charlotte | Apartment tower with 300 units to be developed by Southern Land Co., planned on the site of Tyber Creek Pub. It will break ground in early 2023 and finish by 2025. Tyber Creek will occupy 6,700 square of the building with outdoor and indoor areas.[148] | |
Catalyst Capital Partners and Stiles Corp. Residential Tower | 30 | 2024 | Approved | Residential | Charlotte | Apartment tower with 291 units, 9,500 square feet of ground floor retail, and 10,000 square feet of office space occupied by Catalyst is being developed by Catalyst Capital Partners and Stiles Corp. It is planned on the former site of Price's Chicken Coop located at 1600 and 1604 Camden Road. It will break ground in the third quarter of 2022.[149][150] | |
Project 561 | 561 / 171 | 28 | Approved | Office | Greensboro | Will become the tallest building in North Carolina outside of Charlotte and include 400,000 square feet of Class A office space and a hotel. The 28-story tower would sit on top of an 8-story parking deck and would include a spire.[151] | |
506 Capital Blvd | 40 | Approved | Office/Residential | Raleigh | [152] | ||
Smoky Hollow Phase III | 500 / 150 | 40 | Approved | Office/Residential | Raleigh | [153] | |
Nexus Phase 1 | 15 | Proposed | Office/Residential | Raleigh | [154] | ||
Raleigh Civic Campus Phase 1 | 20 | Proposed | Government | Raleigh | Phase 1 of 3. Referred to as "New City Hall, East Building" in City of Raleigh materials.[155][156] | ||
Raleigh Civic Campus Phase 2 | 20 | Proposed | Government | Raleigh | Phase 2 of 3. Referred to as "New City Hall, West Building" in City of Raleigh materials. Master plan refers to this building as a "twin" to phase 1.[156] | ||
Raleigh Civic Campus Phase 3 | 20 | Proposed | Government | Raleigh | Phase 3 of 3. Third-party development of up to 20 stories with parking deck.[156] | ||
Salisbury Square Residential Building | 239 / 73 | 20 | Proposed | Residential | Raleigh | [157] | |
Salisbury Square Mixed Use Building | 239 / 73 | 20 | Proposed | Office/Residential | Raleigh | [157] | |
301 Hillsborough Phase 2 | 19 | Proposed | Office/Residential | Raleigh | Phase 2 of the Raleigh Crossing development. Mixed-use tower with 135 residential units, 165 room hotel, and 8,000 SF of retail.[130] | ||
Crabtree Valley Mall Tower | 30 | Proposed | Hotel/Office | Raleigh | Part of a larger redevelopment plan for Crabtree Valley Mall[158] | ||
Carolina Development Group Tower | 37 | On Hold | Residential | Charlotte | 350 apartments and up to 6,500 square feet of retail space at the intersection North Smith and West 10th streets[159] | ||
The Howard R. Levine Center for Education | 270 | 18 | Approved | Education | Charlotte | Main tower as part of the Wake Forest School of Medicine's Innovation District. Construction starting in 2022.[160] | |
Moxy Hotel | 230 / 70.1 | 20 | Approved | Hotel | Charlotte | Construction starting 2022 | |
Intercontinental Hotel at Belk Place | 420 / 128 | 32 | Approved | Hotel | Charlotte | Construction started in 2019 going vertical in 2022 | |
Third Street and Baldwin Office Tower | 299 / 91.2 | 20 | Approved | Office/Hotel | Charlotte | Office tower with planned 240 room hotel near the Cherry and Elizabeth neighborhoods. Construction starting in 2022 | |
The Nash (Tower 1) | 40 | Proposed | Mixed-Use | Raleigh | Multi-use building planned for downtown Raleigh located near Nash Square. | ||
The Nash (Tower 2) | 40 | Proposed | Mixed-Use | Raleigh | Multi-use building planned for downtown Raleigh located near Nash Square. | ||
302 South St. | 20 | Proposed | Residential | Raleigh | Would include approximately 300 apartments.[161] | ||
RUSBUS (Tower 1) | 30 | Approved | Mixed-Use | Raleigh | 1 of 2 towers planned for GoTriangle's Raleigh Union Station Bus Facility Project.[162] To begin construction in 2022. | ||
Raleigh Convention Hotel and Downtown Development Project (Tower 1) | ~550/~168 | 40 | 2030 | On Hold | Hospitality | Raleigh | Planned to be constructed near Raleigh's convention center and performing arts center.[163] |
Raleigh Convention Hotel and Downtown Development Project (Tower 2) | ~800/~244 | 40 | 2030 | On Hold | Office/Mixed-Use | Raleigh | Planned to be constructed near Raleigh's convention center and performing arts center.[163] |
Downtown South (Tower 1) | 40 | Approved | Office | Raleigh | Part of Kane Realty's Downtown South Soccer Stadium project.[164] | ||
Downtown South (Tower 2) | 40 | Approved | Hospitality | Raleigh | Part of Kane Realty's Downtown South Soccer Stadium project.[164] | ||
110 South McDowell Street | 20 | 2025 | Approved | Mixed-Use | Raleigh | To begin construction in 2023.[165] | |
North Hills Redevelopment (Tower 2) | 30 | Proposed | Raleigh | One of multiple towers planned for North Hills.[166] | |||
North Hills Redevelopment (Tower 3) | 40 | Proposed | Raleigh | One of multiple towers planned for North Hills.[166] | |||
North Hills Redevelopment (Tower 4) | 40 | Proposed | Raleigh | One of multiple towers planned for North Hills.[166] | |||
227 W. Davie St. | 40 | Proposed | Mixed-Use | Raleigh | To be developed by NCR Hospitality Corporation.[167] |
See also[]
- List of tallest buildings in Charlotte
- List of tallest buildings in Raleigh, North Carolina
- List of tallest buildings in Durham, North Carolina
- List of tallest buildings in Winston-Salem
- List of tallest buildings in the United States
- List of tallest buildings by U.S. state
Notes[]
References[]
- ^ "Bank of America Corporate Center". Emporis. Retrieved September 24, 2021.
- ^ "Bank of America Corporate Center". Emporis. Retrieved 16 April 2015.
- ^ "Duke Energy Center". Emporis. Retrieved September 24, 2021.
- ^ "Duke Energy Center". Emporis. Retrieved July 14, 2017.
- ^ "Duke Energy Center". Skyscraper Source Media. Retrieved July 14, 2017.
- ^ a b c d e f g h Shapiro, Amy (9 October 2020). "Charlotte's largest office buildings Ranked by Leasable square feet". Charlotte Business Journal. Retrieved 30 May 2021.
- ^ "Hearst Tower". Emporis. Retrieved September 24, 2021.
- ^ "Hearst Tower". Skyscraper Source Media. Retrieved July 14, 2017.
- ^ "Hearst Tower". Emporis. Retrieved July 14, 2017.
- ^ "Bank of America Tower". Emporis. Retrieved September 24, 2021.
- ^ "One Wells Fargo Center". Emporis. Retrieved September 24, 2021.
- ^ "One Wells Fargo Center". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- ^ "One Wells Fargo Center". Emporis. Retrieved July 14, 2017.
- ^ "One Wells Fargo Center". Skyscraper Source Media. Retrieved July 14, 2017.
- ^ "The Vue". Emporis. Retrieved September 24, 2021.
- ^ "The Vue, Charlotte". Emporis. Retrieved 17 April 2015.
- ^ "PNC Plaza". Emporis. Retrieved October 7, 2021.
- ^ "Bank of America Plaza". Emporis. Retrieved September 24, 2021.
- ^ "1 Bank of America Center". The Skyscraper Center. CTBUH. Retrieved July 14, 2017.
- ^ "1 Bank of America Center". Emporis. Retrieved July 14, 2017.
- ^ "1 Bank of America Center". Skyscraper Source Media. Retrieved July 14, 2017.
- ^ "1 Bank of America Center". Emporis. Retrieved September 24, 2021.
- ^ "Bank of America Tower". Emporis.com. Retrieved 2007-12-31.
- ^ "1 Bank of America Center". Retrieved 2008-09-15.
- ^ "300 S Tryon". Council on Tall Buildings and Urban Habitat. Retrieved September 24, 2021.
- ^ "300 South Tryon". The Skyscraper Center. CTBUH. Retrieved November 20, 2017.
- ^ "300 South Tryon". Emporis. Retrieved November 20, 2017.
- ^ "300 South Tryon". Skyscraper Source Media. Retrieved November 20, 2017.
- ^ "121 West Trade". Emporis. Retrieved September 24, 2021.
- ^ "121 West Trade". Emporis.com. Retrieved 2007-12-27.
- ^ "Interstate Tower". SkyscraperPage.com. Retrieved 2007-12-31.
- ^ "100 North Main Street". Emporis. Retrieved October 7, 2021.
- ^ "Three Wells Fargo Center". Emporis. Retrieved September 24, 2021.
- ^ "Three Wachovia Center". Emporis.com. Retrieved 2007-12-27.
- ^ "Three Wachovia Center". SkyscraperPage.com. Retrieved 2007-12-31.
- ^ "Fifth Third Center". Emporis. Retrieved September 24, 2021.
- ^ "201 North Tryon". Emporis.com. Retrieved 2007-12-27.
- ^ "IJL Financial Center". SkyscraperPage.com. Retrieved 2007-12-31.
- ^ "Museum Tower". Emporis. Retrieved September 24, 2021.
- ^ "Two Wells Fargo Center". Emporis. Retrieved September 24, 2021.
- ^ "Two Wachovia Center". Emporis.com. Retrieved 2007-12-27.
- ^ "Two Wachovia Center". SkyscraperPage.com. Retrieved 2007-12-31.
- ^ "Two Hanover Square". Council on Tall Buildings and Urban Habitat. Retrieved October 7, 2021.
- ^ "Two Hanover Square". Emporis. Retrieved 17 April 2015.
- ^ Fahey, Ashley (10 July 2019). "Uptown office tower tops out, on track to deliver in 2021". Charlotte Business Journal. Retrieved 7 October 2021.
- ^ Chemtob, Danielle (May 3, 2021). "Construction on the latest bank tower in the Charlotte skyline is now complete". Charlotte Observer. Retrieved 2021-05-05.
- ^ "Uptown will be getting a new bank tower — Ally Charlotte Center". Agenda. Charlotte Agenda. Retrieved December 12, 2017.
- ^ "Busy uptown intersection is closing for December to make way for a new office tower". Charlotte Observer. Ely Portillio. Retrieved December 12, 2017.
- ^ "Uptown office tower tops out, on track to deliver in 2021". Charlotte Business Journal. bizjournals. Retrieved February 23, 2020.
- ^ "Ascent Uptown". Emporis. Retrieved October 7, 2021.
- ^ "Avenue". Emporis. Retrieved September 24, 2021.
- ^ "Avenue". Emporis.com. Retrieved 2007-12-27.
- ^ "Avenue". SkyscraperPage.com. Retrieved 2007-12-31.
- ^ "400 South Tryon". Emporis. Retrieved September 24, 2021.
- ^ "400 South Tryon". Emporis.com. Retrieved 2007-12-27.
- ^ "400 South Tryon". SkyscraperPage.com. Retrieved 2007-12-31.
- ^ "400 South Tryon". SkyscraperCity.com. Archived from the original on 2006-05-16. Retrieved 2007-03-29.
- ^ "Winston Tower". Emporis. Retrieved October 7, 2021.
- ^ "150 Fayetteville". Emporis. Retrieved October 7, 2021.
- ^ "Carillon Tower". Emporis. Retrieved September 24, 2021.
- ^ "Charlotte Plaza". Emporis. Retrieved September 24, 2021.
- ^ "Charlotte Plaza". Emporis.com. Retrieved 2007-12-27.
- ^ "The Ellis". Emporis. Retrieved September 24, 2021.
- ^ Sealey, Clayton (23 June 2021). "Charlotte's newest residential tower is complete, with hundreds of ready-to-lease units". Charlotte Observer. Retrieved 24 June 2021.
- ^ "Hoar Construction Completes 33-Story Ellis Apartment High-Rise in Uptown Charlotte". ReBusiness Online. 2021-06-28. Retrieved 2021-06-28.
- ^ "FNB Tower-Charlotte". Emporis. Retrieved July 21, 2021.
- ^ Cope, Cassie (26 December 2018). "Construction begins on 29-story uptown bank tower. It will have more than offices". Charlotte Observer. Retrieved 11 June 2021.
- ^ Kuznitz, Allison (21 July 2021). "The newest addition to the Charlotte skyline just opened near Bank of America Stadium". Charlotte Observer. Retrieved 22 July 2021.
- ^ "Lincoln Financial Building". Emporis. Retrieved January 13, 2022.
- ^ "Lowe's Global Technology Center". Emporis. Retrieved July 21, 2021.
- ^ Crane, Brianna (27 June 2019). "View Renderings: Lowe's choose South End for new tech hub, moving into stunning 23-story tower". . Retrieved 19 March 2021.
- ^ a b Soloff, Katie Peralta (7 October 2021). "6 biggest developments underway shaping South End". Axios Charlotte. Retrieved 7 October 2021.
- ^ "University Tower | Buildings". Durham /: Emporis. Retrieved 2012-07-15.
- ^ "Catalyst". Emporis. Retrieved September 24, 2021.
- ^ "GMAC Tower". Emporis. Retrieved October 7, 2021.
- ^ "525 North Tryon". Emporis. Retrieved September 24, 2021.
- ^ "TradeMark". Emporis. Retrieved September 24, 2021.
- ^ "First Citizens Plaza". Emporis. Retrieved September 24, 2021.
- ^ "First Citizens Plaza". The Skyscraper Center. CTBUH. Retrieved July 15, 2017.
- ^ "First Citizens Plaza". Emporis. Retrieved July 15, 2017.
- ^ "First Citizens Building". Skyscraper Source Media. Retrieved July 15, 2017.
- ^ "AC Hotel/Residence Inn Charlotte City Center". Emporis. Retrieved September 24, 2021.
- ^ "First Citizens Plaza". The Skyscraper Center. CTBUH. Retrieved July 15, 2017.
- ^ "First Citizens Plaza". Emporis. Retrieved July 15, 2017.
- ^ "First Citizens Building". Skyscraper Source Media. Retrieved July 15, 2017.
- ^ "SkyHouse Uptown I". Emporis. Retrieved October 7, 2021.
- ^ "SkyHouse Uptown North Tower". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
- ^ "SkyHouse Uptown II". Emporis. Retrieved October 7, 2021.
- ^ "SkyHouse Uptown South Tower". The Skyscraper Center. CTBUH. Retrieved July 16, 2017.
- ^ "The Arlington". Emporis. Retrieved September 24, 2021.
- ^ "SKYE Condominiums". Emporis. Retrieved September 24, 2021.
- ^ "Skye Building". The Skyscraper Center. CTBUH. Retrieved July 15, 2017.
- ^ "SKYE Condominiums". Emporis. Retrieved August 4, 2017.
- ^ "SKYE Condominiums". Skyscraper Source Media. Retrieved July 15, 2017.
- ^ "Honeywell Tower". Emporis. Retrieved July 21, 2021.
- ^ a b c "Chicago-based Riverside Investment & Development to lead major mixed-use project at prime site near uptown". Charlotte Business Journal. bizjournals. Retrieved November 11, 2021.
- ^ "JW Marriott Charlotte". Emporis. Retrieved September 24, 2021.
- ^ a b Shapiro, Amy (8 January 2021). "Charlotte's largest hotels Ranked by No. of units or suites". Charlotte Business Journal. Retrieved 30 May 2021.
- ^ Cite error: The named reference
Charlotte Business Journal
was invoked but never defined (see the help page). - ^ Thomas, Jennifer (26 July 2021). "Luxury hotel JW Marriott set to open in uptown Charlotte". Charlotte Business Journal. Retrieved 27 July 2021.
- ^ "101 Independence Center". Emporis. Retrieved September 24, 2021.
- ^ "101 Independence Center". The Skyscraper Center. CTBUH. Retrieved July 15, 2017.
- ^ "101 Independence Center". Emporis. Retrieved July 15, 2017.
- ^ "101 Independence Center". Skyscraper Source Media. Retrieved July 15, 2017.
- ^ "BB&T Center". Emporis. Retrieved September 24, 2021.
- ^ "BB&T Center". The Skyscraper Center. CTBUH. Retrieved July 15, 2017.
- ^ "BB&T Center". Emporis. Retrieved July 15, 2017.
- ^ "BB&T Building". Skyscraper Source Media. Retrieved July 15, 2017.
- ^ "One City Center". Emporis. Retrieved January 13, 2022.
- ^ "200 South Tryon". Emporis. Retrieved September 24, 2021.
- ^ "200 South Tryon Street". The Skyscraper Center. CTBUH. Retrieved July 15, 2017.
- ^ "200 South Tryon". Emporis. Retrieved July 15, 2017.
- ^ "200 South Tryon". Skyscraper Source Media. Retrieved July 15, 2017.
- ^ "The Westin Charlotte". Emporis. Retrieved September 24, 2021.
- ^ "NASCAR Plaza". Emporis. Retrieved September 24, 2021.
- ^ "NASCAR Plaza". The Skyscraper Center. CTBUH. Retrieved July 15, 2017.
- ^ "NASCAR Plaza". Emporis. Retrieved July 15, 2017.
- ^ "NASCAR Plaza". Skyscraper Source Media. Retrieved July 15, 2017.
- ^ "Sheraton Greensboro Hotel at Four Seasons". Emporis. Retrieved January 13, 2022.
- ^ "Renaissance Plaza". Emporis. Retrieved January 13, 2022.
- ^ "The Tower at Mutual Plaza". Emporis. Retrieved January 13, 2022.
- ^ "Jefferson Standard Building". Emporis. Retrieved January 13, 2022.
- ^ "Center Pointe". Emporis. Retrieved January 13, 2022.
- ^ "Duke Chapel". Emporis. Retrieved January 13, 2022.
- ^ "Hill Building". Council of Tall Building and Urban Habitats. Retrieved January 13, 2022.
- ^ "Charlotte Metro Tower". Emporis. Retrieved July 20, 2021.
- ^ Fahey, Ashley (2021-05-17). "Duke Energy to exit current HQ building in uptown after company's new tower delivers". Charlotte Business Journal. Retrieved 2021-05-17.
- ^ Wilson, Jen (20 August 2021). "CBJ Morning Buzz: Duke Energy's uptown tower tops out; Charlotte makes jobs ranking". Charlotte Business Journal. Retrieved 25 August 2021.
- ^ "The Eastern". Emporis. Retrieved October 7, 2021.
- ^ a b "Raleigh Crossing, Raleigh, NC • The Fallon Company". The Fallon Company. Retrieved 2020-09-07.
- ^ "Pendo to Relocate Corporate Headquarters to 301 Hillsborough Street in Downtown Raleigh in 2022". www.businesswire.com. 2019-05-30. Retrieved 2020-09-07.
- ^ "400H". www.emporis.com.
- ^ "400 Hillsborough Street | Projects". Gensler. Retrieved 2019-02-27.
- ^ "400H". Barnhill Contracting Company. Retrieved 2020-09-07.
- ^ Graham, Ben. “North Hills Tower Plans Increase Height to 18 Stories.” Bizjournals.com, 2 Nov. 2018, www.bizjournals.com/triangle/news/2018/11/02/north-hills-tower-plans-increase-height-to-18.html.
- ^ "The Line". Emporis. Retrieved July 20, 2021.
- ^ "Guide: The Growing Skyline in Charlotte's South End". Charlotte Magazine. 26 November 2019. Retrieved February 23, 2020.
- ^ "A 26-story apartment tower is planned near Dilworth. Here's what it will include". Charlotte Business Journal. bizjournals. Retrieved May 18, 2021.
- ^ "26-story tower with skyline views breaks ground soon in Dilworth". Axios Charlotte. Axios Charlotte. Retrieved September 24, 2021.
- ^ "RENDERINGS: Shorenstein, Stiles Corp. to break ground on $165M South End office tower this summer". Charlotte Business Journal. bizjournals. Archived from the original on August 19, 2013. Retrieved February 2, 2021.
- ^ "RENDERINGS: Here's what South End's next office tower will look like". Charlotte Business Journal. Retrieved March 3, 2020.
- ^ Fahey, Ashley (18 May 2021). "Portman Residential planning high-rise apartment tower at South End site near the Rail Trail". Charlotte Business Journal. Retrieved 18 May 2021.
- ^ "Elizabeth medical office building, Metropolitan tower among rezoning petitions approved". Charlotte Business Journal. bizjournals. Retrieved April 25, 2021.
- ^ Fahey, Ashley (15 June 2021). "Stream Realty Partners, The Durban Group plan mixed-use tower adjacent to The Suffolk Punch in South End". Charlotte Business Journal. Retrieved 15 June 2021.
- ^ Lu, Yiwen (16 June 2021). "New mixed-use tower planned next to popular South End brewery. Here's what we know". Charlotte Observer. Retrieved 16 June 2021.
- ^ a b "Sources: Developer circling prime site near uptown Charlotte for project". Charlotte Business Journal. bizjournals. Retrieved November 11, 2021.
- ^ "Joint venture plans South End office tower to start construction in 2023". Charlotte Business Journal. bizjournals. Retrieved February 3, 2022.
- ^ "High-rise planned at prime South End site, with Tyber Creek Pub slated for revamp". Charlotte Business Journal. bizjournals. Retrieved November 11, 2021.
- ^ "Catalyst Capital Partners, Stiles to develop mixed-use tower in South End". Charlotte Business Journal. bizjournals. Retrieved November 16, 2021.
- ^ "30-story tower coming to Charlotte skyline, replacing the old home of Price's Chicken". Charlotte Observer. McClatchy. Retrieved November 16, 2021.
- ^ "Developer Roy Carroll may build Greensboro's tallest office tower". 17 June 2015. Retrieved 27 October 2017.
- ^ Eanes, Zachery. “Another Peace Street Rezoning Request Asks for the Ability to Build up to 40 Stories.” Newsobserver, Raleigh News & Observer, 15 May 2019, www.newsobserver.com/news/business/article230436969.html.
- ^ Eanes, Zachery (April 25, 2019). "Kane Realty's 40-story tower gets positive recommendation from planning commission". The News & Observer. Retrieved August 8, 2019.
- ^ "Administrative Site Plan Review Plans For: NEXUS MXU - PHASE 1" (PDF). cityofraleigh. Retrieved 2020-09-07.
- ^ "Envisioning the New Civic Tower | raleighnc.gov". www.raleighnc.gov. Retrieved 2019-02-27.
- ^ a b c "Civic Campus Master Plan" (PDF).
- ^ a b "Administrative Site Review Application - Salisbury Square" (PDF).
- ^ WRAL (2019-06-25). "Crabtree Valley Mall unveils new $290M redevelopment project". WRAL.com. Retrieved 2020-09-07.
- ^ "Uptown tower, Ballantyne hospital among development projects approved by city". Charlotte Business Journal. bizjournals. Retrieved February 23, 2020.
- ^ Craver, Richard. "Wake Forest's Charlotte medical school building to be named for Howard R. Levine, retired CEO of Family Dollar". Retrieved 2022-02-09.
- ^ "Downtown Raleigh development calls for 20-story building with hundreds of apartments". www.bizjournals.com.
- ^ "GoTriangle's 40-story tower in downtown Raleigh could get more affordable housing". Raleigh News & Observer.
- ^ a b "Raleigh Convention Hotel and Downtown Development Project". raleighnc.gov.
- ^ a b "Home". Downtown South.
- ^ "MCDowell Street Is Growing". Instagram. Retrieved 2022-02-09.
{{cite web}}
: CS1 maint: url-status (link) - ^ a b c "North Hills Rezoning". North Hills. Retrieved 2022-02-09.
- ^ Harshberg, Caleb. "Another hotelier eyes 40-story option in downtown Raleigh". Retrieved 2022-02-09.
- Lists of tallest buildings in the United States
- Lists of buildings and structures in North Carolina