Long Harbour Nickel Processing Plant

From Wikipedia, the free encyclopedia
Long Harbour Nickel Processing Plant
Long Harbour Nickel Processing Plant is located in Newfoundland and Labrador
Long Harbour Nickel Processing Plant
Location of the Long Harbour Nickel Processing Plant in Newfoundland and Labrador.
General information
Typenickel processing plant
LocationLong Harbour, Newfoundland and Labrador
CountryCanada
Coordinates47°25′27″N 53°49′0″W / 47.42417°N 53.81667°W / 47.42417; -53.81667
Construction startedApril 2009
CompletedFall 2013 (Phase One Construction)
Cost4.75 billion CAD
OwnerVale Limited

The Long Harbour Nickel Processing Plant is a Canadian nickel concentrate processing facility located in Long Harbour, Newfoundland and Labrador.

Operated by Vale Limited, construction on the plant started in April 2009 and operations began in 2014. Construction costs were in excess of CAD $4.25 billion.[1] Construction involved over 3,200 workers generating approximately 3,000 person-years of employment. Operation of the plant will require approximately 475 workers.[2]

Production began in July 2014, reported in November 2014.[3] Vale's nickel processing plant in Long Harbour received its first major shipment from its Labrador mine in Voisey's Bay in May 2015. As of that date, a small proportion of the plant's raw materials came from Voisey's Bay but the majority were imported from Indonesia. A spokesman for Vale said 100 per cent of the Long Harbour facility's production materials will come from Voisey's Bay by early 2016.[4]

Using the metal processing technology of hydrometallurgy, the plant is designed to produce 50,000 t (49,000 long tons; 55,000 short tons) per year of finished nickel product, together with associated cobalt and copper products. The hydrometallurgy technology was piloted at a demonstration plant that opened in Argentia, Newfoundland and Labrador in 2004. This demonstration plant operated until 2008 and was instrumental in helping Vale decide to use the hydrometallurgy process for the Long Harbour processing plant.

A processing plant on Newfoundland was one of the requirements established by the Government of Newfoundland and Labrador in order to exploit the nickel deposit at the Voisey's Bay Mine in Labrador. The bulk carrier MV Umiak I was one of several ice-strengthened bulk carriers built to transport nickel concentrate from Voisey's Bay to the Long Harbour Nickel Processing Plant.

The Long Harbour Nickel Processing Plant was built on a partially brownfield site near the port of Long Harbour. The facility consists of a wharf for offloading nickel ore concentrate from bulk carriers, crushing and grinding facilities, a main processing plant approximately 2 km (1.2 mi) south of the port, a pipeline to supply process water, an effluent discharge pipe and diffuser, and a residue pipeline to a nearby disposal area. The hydrometallurgical process in the plant will pressure-leach the nickel ore concentrate in acidic solutions to separate iron, sulfur and other impurities from nickel, copper and cobalt.[5]

On June 11, 2018, Premier Dwight Ball announced Vale is moving forward with its underground mine at Voisey's Bay. Ball stated that the move will extend the mine's operating life by at least 15 years.[6] First ore is expected by April 2021 with processing to take place in Long Harbour.

References[]

  1. ^ "Long Harbour production should start in 2013". CBC. Retrieved 15 August 2013.
  2. ^ "Long Harbour Nickel Processing Plant - Long Harbour, Newfoundland". Kiewet Corporation. Retrieved 15 August 2013.
  3. ^ "Vale, province celebrate first production at new nickel plant in Long Harbour". CBC. Retrieved 14 July 2015.
  4. ^ "Vale Long Harbour nickel plant gets first shipment from Voisey's Bay". CBC. Retrieved 10 August 2015.
  5. ^ "Vale Long Harbour Nickel Processing Plant - EPCM". Fluor Corporation. Retrieved 15 August 2013.
  6. ^ "Amid nickel boom, Vale moves forward with underground mine at Voisey's Bay". CBC. 11 June 2018.

External links[]

Retrieved from ""