Mandalay Convention Centre
Mandalay Convention Centre | |
---|---|
မန္တလေး ကွန်ဗင်းရှင်းစင်တာ | |
General information | |
Type | RC |
Address | 101 Road and 72 street |
Coordinates | 21°57′05″N 96°05′48″E / 21.9513°N 96.0967°ECoordinates: 21°57′05″N 96°05′48″E / 21.9513°N 96.0967°E |
Construction started | 3 November 2014 |
Opened |
|
Cost | US$ 25 million |
Owner | Mandalay City Development Committee |
Height | 386 ft |
Technical details | |
Floor count | 3 |
Lifts/elevators |
|
Grounds | 2.4 acres (0.97 ha) |
Design and construction | |
Architecture firm | Gensler |
Main contractor | Mandalay Investment and Development Group (CAD Construction and Decoration + New Star Light Construction) |
Other information | |
Parking |
|
Mandalay Convention Centre (Burmese: မန္တလေးကွန်ဗင်ရှင်းစင်တာ) is a convenction centre in Mandalay.Construction began under the time of Mayor Aung Maung and opened on November 9, 2018, under Ye Lwin. It is one of four convention centers in Myanmar.[1][2]
History[]
In Mandalay, only Mandalay City Hall was used when there was a big event.Later, due to the increase in users, Mayor Aung Maung decided to built a new building in September 2012 and called for a tender.The construction began in 2014 and the building was built at a cost of US$25 million.
Construction[]
Mandalay Convention Center and Commercial Complex project is being built on a 14.78-acre plot of land, owned by MCDC, located on 101 Road between 70th and 72nd Streets.This project will be built in three phases. This convention center is the first phase of the project.The Mandalay Convention Center is built on 2.38 acres of land, measuring 386 feet by 305 feet and is a four-story concrete and steel structure with a floor area of 220,000 square feet.
When the new government came to power in 2016, Dr. Ye Lwin, the new mayor, inspected the project and found that the convention center was not up to standard, with only one large hall. The floor of the multi-purpose hall on the ground floor is cracked. Toilets are not equipped with sensors; Prior to the completion of the construction work, the escalator was repaired and the design of the building had to be changed.[3][4]
Opening[]
Soft Opening[]
The Convention Centre was pre-opened by chief minister of Mandalay Region Ye Myint and Mayor Aung Maung on 13 March 2016.
Grand Opening[]
The completed Convention Centre was opened on 9 November 2018.It was held in conjunction with the 2018 Mandalay Business Forum and Union Minister for Union Government Office and Chairman of Myanmar Investment Commission, Thaung Tun attended.Mandalay Region Chief Minister Zaw Myint Maung opened the sign of the Convention Centre.[5]
References[]
- ^ "Mandalay Convention Centre opened in Chanmyathazi Township". Global News Light of Myanmar.
- ^ "Mandalay Convention Centre Planned". The Myanmar Times.
- ^ "ကွန်ဗင်းရှင်းစင်တာ (မန္တလေး) ကြမ်းခင်းအက်ကွဲမှုကို X Ray ဖြင့် စစ်ဆေးရန် စီစဉ်လျက်ရှိပြီး အပေါ်ဆုံးအလွှာ အက်ကွဲမှု မဟုတ်ပါက လက်ခံမည် မဟုတ်ကြောင်း မြို့တော်ဝန် ပြောကြား". Eleven Media Group.
- ^ "Mandalay city says firms cause delay of convention centre". The Myanmar Times.
- ^ "ပြည်ထောင်စုဝန်ကြီး ဦးသောင်းထွန်း Mandalay Convention Centre ဖွင့်ပွဲ တက်ရောက်". Ministry of Information (Myanmar).
This article needs additional or more specific categories. (May 2021) |
- Buildings and structures in Mandalay
- Myanmar building and structure stubs