Nanning–Yulin high-speed railway

From Wikipedia, the free encyclopedia
Nanning–Yulin high-speed railway
Overview
StatusUnder construction
TerminiNanning East
Stations5
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
Technical
Line length291.3 km (181 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed350 km/h (217 mph)

The Nanning–Yulin high-speed railway is a high-speed railway line currently under construction in China. It is expected to be completed in 2023.[1] The line will be 193 kilometres (120 mi) long and have a maximum speed of 350 kilometres per hour (220 mph).[2]

History[]

Construction began on 15 January 2019.[2]

Stations[]

The western terminus of the line is Nanning East. The eastern terminus is . The line will have three intermediate stations: , , and .[3]

Station Name Chinese Metro
transfers/connections
Nanning East 南宁东  1 
六景
横县
兴业南
玉林北

References[]

  1. ^ "2023年三条新线开通,广西将实现市市通高铁" [Three new high-speed lines will open in 2023, Guangxi will achieve city-to-city high-speed rail] (in Chinese). 高铁网. 6 May 2021. Retrieved 6 May 2021.
  2. ^ a b "南玉城际建设动土 玉林高铁序幕拉开" (in Chinese). 玉林新闻网. 16 January 2019. Retrieved 6 May 2021.
  3. ^ "新建南玉铁路初步设计获批复" (in Chinese). 24 October 2019. Retrieved 6 May 2021.


Retrieved from ""