Newfoundland and Labrador Hydro

From Wikipedia, the free encyclopedia
Newfoundland and Labrador Hydro
FormerlyNewfoundland and Labrador Power Commission
TypeSubsidiary
IndustryElectricity generation & distribution
FoundedSt. John's, Newfoundland and Labrador (1954)
HeadquartersSt. John's, Newfoundland and Labrador, Canada
Key people
Jennifer Williams, President (First Female President, February 2019)
ProductsElectricity
RevenueGreen Arrow Up.svg$493,500,000 CAN
OwnerGovernment of Newfoundland and Labrador
Number of employees
1,150 (2005)
ParentNalcor Energy
SubsidiariesChurchill Falls (Labrador) Corporation Limited


Websitewww.nlh.nl.ca

Newfoundland and Labrador Hydro (NL Hydro), commonly known as Hydro, is a provincial Crown corporation that generates and delivers electricity for Newfoundland and Labrador, as well as portions of Quebec and the north-eastern areas of the United States. Since 2007, Hydro has been a subsidiary of the provincial Crown-owned energy holding company Nalcor Energy.

Newfoundland and Labrador Hydro's installed generating capacity, 7289 megawatts (MW), is the fourth largest of all utility companies in Canada. Generating assets consist of 12 hydroelectric plants, including the Churchill Falls hydroelectric plant, which is the second largest underground power station in the world, with a rated capacity of 5,428 MW of power, one oil-fired plant, four gas turbines and 26 diesel plants. Every year, Hydro generates and transmits over 80% of the electrical energy consumed by Newfoundlanders and Labradorians – over 6,487 GWh of energy in 2004. Hydro also distributes power directly to 35,000 customers in rural Newfoundland and Labrador.

In 1975, the Newfoundland and Labrador Power Commission, a crown corporation originally established to assist in rural electrification, was renamed Newfoundland and Labrador Hydro Corporation.

Newfoundland and Labrador Hydro is the parent company of the Hydro Group of Companies, which comprises

Grid operations, services and connections[]

Atlantic power connections[]

The Nova Scotia government commissioned (from SNC-Lavalin) a study in 2009 to consider an Atlantic wide regional electricity market operator.[1]

A $6.2 billion deal between Newfoundland and Labrador Hydro's parent company, Nalcor Energy and Halifax-based Emera was announced by premiers Darrell Dexter and Danny Williams on November 18, 2010. Nalcor Energy will spend $2.9 billion to build a power generating facility at Muskrat Falls, while Emera will invest $1.2-billion in the Maritime Transmission Link underwater power connection and $600 million in the Muskrat Falls facility in exchange for 20% of the 800-megawatts of capacity.

Generating facilities[]

Hydroelectric Generating Stations[]

Labrador (6,271 MW)[]

Newfoundland (1,254 MW)[]

Non-Utility Generators[]

Thermal (Diesel) Generating Stations[]

Labrador (32.8 MW)[]

Newfoundland (23.5 MW)[]

Thermal (Oil) Generating Stations[]

Newfoundland (490 MW)[]

Gas Turbine Generating Stations[]

Labrador (27 MW)[]

Newfoundland (100 MW)[]

Highlights in the history of Newfoundland and Labrador Hydro[]

  • 1947 – hired as an engineering consultant to undertake a water power survey
  • 1949 – Premier J.R. Smallwood promised to create a public utility
  • 1954 – On June 22, the was passed creating the Newfoundland Power Commission, what would become Newfoundland and Labrador Hydro
  • 1956 – George Desbarats began as Commissioner and sole employee of the Newfoundland Power Commission.
  • 1956 - British Newfoundland Development Corporation (BRINCO) was formed to explore development at Bay d'Espoir and later Churchill Falls
  • 1958 – Premier Smallwood announced his
  • 1958 – John Ryan succeeds George Desbarats as Chair of the Commission
  • 1961 – becomes Chair of the Commission
  • 1963 – Government passed the Rural Electrification Act, which established power distribution districts (PDDs) to assist non-incorporated municipalities to access electricity where feasible
  • 1964 - George Hobbs becomes Chair
  • 1964 – Bay d'Espoir Hydro Electric Development begins
  • 1965 – Government signed an agreement with Newfoundland Light and Power to give it ownership of the rural lines connected to its system. Any future lines would be jointly constructed.
  • 1965 – The Newfoundland and Labrador Power Commission Act replaced the 1954 Power Commission Act and created the (REA). The Act also provided for the establishment of a province-wide electrical code.
  • 1966 – Bay d'Espoir Stage 2 began construction
  • 1968 – Construction on Holyrood Thermal Generating Station began
  • 1969 – and Hydro-Québec sign the
  • 1971 – First power from Churchill Falls delivered to Quebec
  • 1974 – Churchill Falls project was complete.
  • 1974 – replaces George Hobbs as Chair of the Power Commission.
  • 1974 - Government acquires part ownership of CFLCo from Brinco
  • 1975 – Government reforms the Commission into the Newfoundland and Labrador Hydro-Electric Corporation (Hydro)
  • 1975 – appointed as president and CEO of Hydro
  • 1975 – Government appoints as the first Chairman of the Board of the Hydro Group of Companies.
  • 1978 – Stage 3 of the Bay d'Espoir project was officially opened
  • 1978 – Victor Young replaced Denis Groom as chairman and CEO of Hydro
  • 1980 – Hinds Lake Hydro Electric Development came on stream
  • 1981 – Roddickton mini-hydro generating station opened
  • 1983 – Upper Salmon Hydro Electric Development plant opened
  • 1985 – Cat Arm Hydro Electric Development opened making it the second largest hydro project on the island.
  • 1985 – replaced Vic Young as chairman and CEO
  • 1989 – Paradise River Hydro Electric Development became operational
  • 1989 – Hydro Place became the official headquarters for the Hydro Group of Companies
  • 1991 – Cyril Abery resigned as chairman and CEO. He was replaced by David Mercer as president and CEO, while James Chalker assumed the duties of chairman of the board.
  • 1995 – William Wells replaced David Mercer as president and CEO of Hydro.
  • 1998 – Two small-scale private hydro projects at and were put into service
  • 2003 – New 40 MW Granite Canal Hydro Electric Development officially opened
  • 2019 - Jennifer Williams replaces Jim Hynes as President of Hydro