Overlake Village station

From Wikipedia, the free encyclopedia
Under construction in January 2018

Overlake Village station is a future light rail station in Redmond, Washington, United States. It will be an at-grade station on the East Link Extension, part of Sound Transit's Link light rail station. The station will serve the Overlake neighborhood and its existing park and ride. Construction began on the station in 2017 and it is expected to open in 2023.

Location[]

Overlake Village station will be located adjacent to State Route 520 with its entrance on 152nd Avenue NE.[1]

History[]

Demolition of existing buildings at the site began in May 2017.[2] The adjacent part of 152nd Avenue NE was closed from November 28 to December 19 while utilities under the street were relocated.[3]

References[]

  1. ^ "Overlake Village Station". Sound Transit. Retrieved May 2, 2016.
  2. ^ "Construction alert: East Link Extension, 5/5/2017". Sound Transit. May 5, 2017.
  3. ^ "Construction alert: East Link Extension, 12/6/2017". Sound Transit. December 6, 2017.

External links[]

Preceding station  
Link
  Following station
toward Northgate
Line 2 (Sound Transit) icon.svg Line 2
(2023)
Terminus

Coordinates: 47°38′08″N 122°08′17″W / 47.6356204°N 122.1380731°W / 47.6356204; -122.1380731

Retrieved from ""