Parc Cynog
Parc Cynog | |
---|---|
Country | Wales, United Kingdom |
Coordinates | 51°45′29″N 4°31′34″W / 51.758°N 4.526°WCoordinates: 51°45′29″N 4°31′34″W / 51.758°N 4.526°W |
Status | Operational |
Commission date | 2001 |
Owner(s) | Vattenfall |
Operator(s) | Nuon Renewables |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 11 |
Nameplate capacity | 8.4 MW |
Parc Cynog is a wind farm operated by Nuon Renewables in Wales.[1][2]
Parc Cynog Windfarm was built in 2001. The Windfarm currently consists of 11 turbines.
There were originally five turbines on site which are Micon M1800-750/48 turbines built in 2001, by 2009, a further six turbines were installed by Enercon Wind Energy, the technology used was Enercon E48.
The windfarm is owned by Vattenfall.[3]
References[]
- ^ "Parc Cynog Wind Farm". nuonrenewables.com. Archived from the original on 2010-12-07. Retrieved 2017-03-07.
- ^ http://www.manta.com/ic/mvmhccd/gb/parc-cynog-wind-farm-ltd[bare URL]
- ^ "Parc Cynog". corporate.vattenfall.co.uk. Retrieved 2017-03-07.
Categories:
- Wind farms in Wales
- British power station stubs
- Wind farm stubs