Pushpak Express

From Wikipedia, the free encyclopedia

Pushpak Express
12534 Pushpak Express (2).jpg
Overview
Service typeExpress
LocaleUttar Pradesh, Madhya Pradesh & Maharashtra
Current operator(s)North Eastern Railway
Route
StartLucknow Junction (LJN)
Stops16
EndMumbai CST (CSMT)
Distance travelled1,428 km (887 mi)
Average journey time24 hours 20 mins
Service frequencyDaily
Train number(s)12533 / 12534
On-board services
Class(es)AC 1st Class, AC 2 tier, AC 3 tier, Sleeper Class, General Unreserved
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesAvailable
Observation facilitiesLarge windows
Technical
Rolling stockLHB coaches
Track gauge1,676 mm (5 ft 6 in)
Operating speed59 km/h (37 mph) average including halts

The 12533 / 12534 Pushpak Express is a express train belonging to Indian Railways that run between Lucknow Junction and Mumbai in India. It operates as train number 12533 from Lucknow Junction to Mumbai CSMT and as train number 12534 in the reverse direction.

It is named after the mythological flying chariot Pushpak which is mentioned as the chariot of Ravana. Demand for the halt at Burhanpur.

Service[]

The 12533/12534 Pushpak Express covers the distance of 1426 kilometres in 24 hours 20 mins (58.60 km/hr) and 1428 km in 24 hours 20 mins as 12534 Pushpak Express (58.68 km/hr).

As the average speed of the train is more than 55 km/hr, its fare includes a Superfast surcharge.

Locomotive[]

Prior to June 2014, it was hauled by 3 locomotives during its journey. A WDM-3A locomotive from either Lucknow or Jhansi shed hauled the train from Lucknow Junction to Jhansi Junction after which a Bhusawal-based WAP-4 hauled the train until Igatpuri following which a WCAM-3 powered the train for the remainder of the journey until Mumbai CSMT.

With progressive electrification of the Lucknow–Jhansi sector, Bhusawal-based WAP-4 began hauling the train until from Lucknow Junction to Igatpuri, following which a WCAM-3 took over for the remainder of the journey until Mumbai CSMT.

With Central Railway completing the changeover of 1500 V DC traction to 25 kV AC traction on 6 June 2015, the train was to hauled by WAP-4 but from 2016, this train is now end to end hauled by Ajni-based WAP-7 locomotive [1].

Coaches[]

As with most train services in India, coach composition may be amended at the discretion of Indian Railways depending on demand.Now from 30 October 2021 this train has been upgraded to new brand LHB coaches up & down.

12534 Pushpak Express – AC 3 tier
12534 Pushpak Express
Loco 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
BSicon LDER.svg SLR Gen Gen Gen HA1 A1 B2 B1 PC S13 S12 S11 S10 S9 S8 S7 S6 S5 S4 S3 S2 S1 Gen SLR
  • SLR consists of Luggage coach
  • Gen consists of Unreserved coaches
  • HA consists of First Class AC 2 Tier coach
  • A consists of AC 2 Tier coach
  • B consists of AC 3 Tier coach
  • S consists of Non-AC Sleeper coach

Routing[]

The 12533/34 Pushpak Express runs via Kanpur Central, Jhansi Junction, Bhopal Junction, , Kalyan Junction to Mumbai CST.

PUSHPAK EXPRESS 12533 UP 12534 Down
SN Station name Code Arr. time Dep. time Halt Distance Day Arr. time Dep. time Halt Distance Day
1 Lucknow Jn LJN Source 19:45 - 0 1 08:40 Destination - 1428 2
2 Unnao Jn ON 20:40 20:42 02 57 1 07:22 07:24 02 1371 2
3 Kanpur Central CNB 21:20 21:32 12 74 1 06:45 07:00 15 1354 2
4 Orai ORAI 23:13 23:15 02 180 1 04:03 04:05 02 1248 2
5 Jhansi Jn JHS 01:30 01:42 12 294 2 01:58 02:10 12 1134 2
6 Lalitpur Jn LAR 02:44 02:46 02 384 2 00:40 00:42 02 1044 2
7 Bhopal Jn BPL 05:55 06:05 10 585 2 21:00 21:05 05 843 1
8 Bhopal Habibganj HBJ 06:15 06:17 02 591 2 20:38 20:40 02 837 1
9 Itarsi Jn ET 07:40 07:45 05 676 2 19:25 19:30 05 752 1
10 Khandwa Jn KNW 10:25 10:30 05 860 2 17:10 17:15 05 568 1
11 Bhusawal Jn BSL 12:05 12:20 15 983 2 14:55 15:10 15 445 1
12 Manmad Jn MMR 14:17 14:19 02 1167 2 12:43 12:45 02 261 1
13 Nasik Road NK 15:13 15:15 02 1240 2 11:48 11:50 02 188 1
14 Kalyan Jn KYN 18:40 18:45 05 1374 2 09:10 09:13 03 54 1
15 Dadar Central DR 19:38 19:40 02 1419 2 - - - - -
16 Mumbai CST CSTM 20:05 Destination - 1428 2 Source 08:20 - 0 1

See also[]

References[]

  • "Railways changes Pushpak's platform". The Times of India. 21 July 2012. Archived from the original on 17 November 2013.
  • "Pushpak Express to stop at Unnao". The Times of India. 15 December 2006. Archived from the original on 5 October 2013.
  • "Blame quota for unconfirmed ticket". The Times of India. 18 June 2009. Archived from the original on 5 October 2013.
  • http://economictimes.indiatimes.com/industry/transportation/railways/dc-to-ac-conversion-on-mumbais-central-railways-rail-route-completed/articleshow/47582271.cms

External links[]

Retrieved from ""