Qianjiang–Changde railway
Qianjiang–Changde railway | |
---|---|
Overview | |
Status | Operational |
Termini | Changde |
Stations | 10 |
Service | |
Type | Heavy rail |
History | |
Opened | 26 December 2019 |
Technical | |
Line length | 336 km (209 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 50 Hz 25,000 V |
Operating speed | 200 km/h (124 mph)[1] |
The Qianjiang–Changde railway is an electrified railway in China.
History[]
Testing began on 14 October 2019.[2] The railway opened on 26 December.[3]
Stations[]
The line has the following passenger stations:
- (interchange with the Chongqing–Huaihua railway, planned interchange with the )
- (planned interchange with the Zhangjiajie–Huaihua high-speed railway and )
- Changde (interchange with the Shimen–Changsha railway)
References[]
- ^ "黔张常铁路环评报告获国家环保部批复 - 湖南频道". hn.rednet.cn. 14 August 2014. Retrieved 13 October 2020.
- ^ "黔张常铁路开启动车组检测-湖南省人民政府门户网站". www.hunan.gov.cn. 15 October 2019. Retrieved 13 October 2020.
- ^ "黔张常铁路正式通车_图片新闻_中国政府网". www.gov.cn. 26 December 2019. Retrieved 13 October 2020.
Categories:
- Railway lines in China
- Railway lines opened in 2019
- People's Republic of China rail transport stubs