Raiymbek batyr (Almaty Metro)

From Wikipedia, the free encyclopedia
Raiymbek batyr
Алматинское метро 011.JPG
Owned byAlmaty Metro
Line(s)Line 1
Platforms1
History
Opened1 December 2011
Services
Preceding station   Almaty Metro   Following station
TerminusFirst Line
toward Moskva

Raiymbek batyr (Kazakh: Райымбек батыр, Raıymbek batyr) is a station of Line 1 of the Almaty Metro. The station was opened on December 1, 2011.[1]

Almaty Metro Line A
Legend
Planned ↑
MPD-1 «Raiymbek batyr»
Raiymbek batyr
Zhibek Zholy  -  Dostyk
Almaly
Abay
Baykonur
Auezov Theater
Alatau  -  Alatau 2
Sayran
Moskva
Opening ca. 2021 ↓
Saryarka
Bauyrzhan Momyshuly
Planned ↓
Avtovokzal

References[]

  1. ^ Schwandl, Robert. "UrbanRail.Net > Asia > Kazakhstan > Almaty Metro". Archived from the original on 25 April 2015. Retrieved 4 May 2015.

External links[]

Coordinates: 43°16′13″N 76°56′41″E / 43.27028°N 76.94472°E / 43.27028; 76.94472

Retrieved from ""