Reading TMD

From Wikipedia, the free encyclopedia

Reading TCD
Location
LocationReading, England
Coordinates51°27′32″N 0°59′15″W / 51.4589°N 0.9876°W / 51.4589; -0.9876Coordinates: 51°27′32″N 0°59′15″W / 51.4589°N 0.9876°W / 51.4589; -0.9876
OS gridSU703739
Characteristics
Operator(s)Great Western Railway
Depot code(s)RG (1973-)[1]
TypeDMU, EMU
History
Former depot code(s)

Reading TCD is a railway situated in Reading, England, and operated by Great Western Railway. The depot code is RG.

Location[]

The depot was situated to the west of Reading station[3] and to the north of Reading West station until 2012. It was located within the wye formed by the Great Western Main Line to the north, with the Reading to Basingstoke Line split into the curve from Reading West to Reading to the east, and the curve connecting Reading West to the westbound main line to the west.

With the rebuilding of Reading Station and the remodelling of the track, the depot was moved from the wye to a brand new facility located on the other side (to the north) of the main running lines, next to the fields where the Reading Festival is held each year. This new depot opened in mid 2012 and is home to GWR's fleet of Class 165 and 166 Network Turbos. As part of the construction, the preliminary equipment for electrification of the Great Western Main Line was installed. It is intended that this new depot will also be able to handle Crossrail stock such as the Class 345 once it is delivered. With the introduction of Class 387 and the tri-modal British Rail Class 769, the Depot will also be the home of the new Electrostar Fleet for GWR. The Depot will also be managed by GWR and Bombardier to carry out light maintenance/heavy maintenance and overhauling of the Electrostar fleet.

The old depot was subsequently demolished apart from two Great Western Railway era water towers, one of which has been donated to the West Somerset Railway (WSR). The site is being used as part of the southern approach to the new flyover for primarily fast passenger trains so that their movements do not conflict with freight trains coming from Southampton along the future Electric Spine.

Changes since 2012[]

The new "Reading Train Care Depot" was announced as "completed" on 31 July 2013.[4]

See also[]

  • 21st Century modernisation of the Great Western Main Line
  • Reading railway station#Future

References[]

  1. ^ a b "The all-time guide to UK Shed and Depot Codes" (PDF). TheRailwayCentre.com. 5 May 2006. Archived from the original (PDF) on 17 December 2013. Retrieved 27 August 2016.
  2. ^ Marsden 1987, p. 93
  3. ^ Webster, Greengrass & Greaves 1987, p. 66
  4. ^ "Reading Train Care Depot completed". VolkerWessels UK. 31 July 2013. Retrieved 27 August 2016.

Sources[]

  • Baker, S.K. Rail Atlas Great Britain & Ireland. ISBN 0-86093-553-1.
  • Marsden, Colin J. (1987). BR Depots. Motive power recognition. Vol. 6. Ian Allan Ltd. ISBN 9780711017191. OCLC 18685680.
  • Webster, Neil; Greengrass, Robert; Greaves, Simon (1987). British Rail Depot Directory. Metro Enterprises Ltd. ISBN 9780947773076. OCLC 20420397.

External links[]


Retrieved from ""