Shaoxing Metro

From Wikipedia, the free encyclopedia

Shaoxing Metro
Overview
LocaleShaoxing, Zhejiang Province, China
Transit typeRapid transit
Number of lines1 (operational)
2 (approved)
Daily ridership20,000 (daily ave. 2021)
Websitewww.sxsmtr.cn
Operation
Began operation28 June 2021 (2021-06-28)[1]
Operator(s)Shaoxing Metro Corporation
Technical
System length20.3 km (12.6 mi)[1] (in operation)
Track gauge1,435mm

Shaoxing Metro (Chinese: 绍兴轨道交通; pinyin: Shàoxīng Guǐdào Jiāotōng), also known as Shaoxing Rail Transit, is the metro system in Shaoxing, Zhejiang province, China.

Network[]

Metro[]

System map for operational lines
Line Terminals Commencement Newest
Extension
Length
km
Stations Operator
 1  Guniangqiao 28 June 2021 20.3[1] 10 Shaoxing Rail Transit Group Co., Ltd.
Total 20.3 10

Line 1[]

Line 1 began construction in 2016. The section from Guniangqiao to China Textile City opened on 28 June 2021,[1] the remaining section from China Textile City to Fangquan will open in 2022. A branch line from Huangjiu Town to Convention & Exhibition Center will also open in 2022.[2]

The western terminus, Guniangqiao, is also the eastern terminus of Hangzhou Metro Line 5.

Future Development[]

System map for under construction lines
Route Name Termini Planned Opening Length Stations Status Notes
 1  Remaining section China Textile City / Convention & Exhibition Center Fangquan 2022 34.1 km 24 Under construction [3]
   Phase 1 Chengxi Road Yuexing Road 2023[4] 10.8 km[4] 9[5] Under construction [5][4]

Planned[]

The network is planned to comprise six lines with a total length of about 208 kilometres (129 mi) by 2030.

Lines S2 (Shaoxing–Zhuji) and S3 (Shaoxing–Shengzhou–Xinchang) are under planning.[6]

References[]

  1. ^ a b c d 绍兴正式进入"地铁时代" 两地"一张网"运营创全国先例. 新华网 (in Chinese). 28 June 2021. Archived from the original on 28 June 2021. Retrieved 25 November 2021.
  2. ^ 地铁将开通,票价如何定?. 绍兴网 (in Chinese). 4 June 2021. Archived from the original on 4 November 2021. Retrieved 25 November 2021.
  3. ^ 关于受理绍兴市城市轨道交通1号线工程环评文件的公告. 浙江省生态环境厅 (in Chinese). 14 August 2018. Archived from the original on 17 November 2019. Retrieved 27 March 2019.
  4. ^ a b c 我市轨道交通2号线一期工程正式开工建设. 绍兴轨道交通 (in Chinese). 1 March 2020. Archived from the original on 3 March 2020. Retrieved 16 September 2020.
  5. ^ a b 『绍兴』地铁2号线一期工程进入实质性建设阶段. 中国轨道交通网 (in Chinese). 29 July 2019. Archived from the original on 4 November 2019. Retrieved 4 November 2019.
  6. ^ 绍兴市域铁路S2线(绍兴至诸暨)、绍兴市域铁路S3线(绍兴至嵊州新昌)预可行性研究项目招标公告. 绍兴轨道交通 (in Chinese). 8 June 2020. Archived from the original on 19 July 2020. Retrieved 19 July 2020.
Retrieved from ""