Swedish railway signalling

From Wikipedia, the free encyclopedia

The signalling system used on the standard-gauge railway network in Sweden is based on that of the traditional mechanical semaphore signals. Currently only colour-light signals are used, together with the Ansaldo L10000 Automatic Train Control system.

Main signals[]

The main signals (huvudsignaler) display the following aspects:

Signal Meaning Comment
Svenska signal 5 stopp.svg Stop The signal must not be passed without permission from the traffic control.[1]
During shunting operations permission to pass a home signal displaying stop may be given with a radio or with a dwarf signal.[2]
Permission to pass a red signal is given during signal system faults and must be documented by both driver and traffic control, and the max speed is then 40 km/h (25 mph).
Svenska signal kör.svg Proceed 80 Authorises the driver to pass the signal at 80 km/h (50 mph) or at a higher speed given by the ATC system.[3] The signal changes to red when the train passes the track circuit limit a few metres in front of the signal, so passengers might see the signal showing red.
Svenska signal 5 kör 40 varsamhet.svg Proceed 40, caution Authorises the driver to pass the signal at 40 km/h (25 mph) or at a higher speed given by the ATC system.
The next signal might be displaying stop if it is farther away than 450 metres (1,480 ft), so the driver must approach the next signal cautiously and be prepared to stop short of it.[3]
Svenska signal 5 kör vänta stopp-anim.gif Proceed 80,
expect stop
Authorises the driver to pass the signal at 80 km/h or at a higher speed given by the ATC system.
The next signal is displaying stop, so the driver must decrease speed and approach the next signal prepared to stop short of it.
Svenska signal 2 kör vänta stopp.gif
[3]

Block signals on the Iron Ore Line between  [sv] (near Kiruna) and the Norwegian border can show Proceed 80, expect stop with only one flashing green light (right image).[4][5]
The next signal is between 800 and 3,000 metres (2,600 and 9,800 ft) away.[2]
If the distance to the next signal is more than 3,000 metres, a separate free-standing distant signal is used to govern the approach to that signal.
Svenska signal 5 kör vänta kör-anim.gif Proceed 80,
expect
proceed 80
Authorises the driver to pass the signal at 80 km/h or at a higher speed given by the ATC system.
The next signal is displaying a proceed 80 aspect.[2]
Svenska signal 5 kör vänta kör 40-anim.gif Proceed 80,
expect
proceed 40
Authorises the driver to pass the signal at 80 km/h or at a higher speed given by the ATC system.
The next signal is displaying proceed 40, so the driver must decrease speed and approach the next signal prepared to pass it at a speed not exceeding 40 km/h (25 mph) or the speed shown on the ATC driver's display.[3]
Svenska signal 5 kör 40 kort väg.svg Proceed 40,
short route
Authorises the driver to pass the signal at a maximum speed of 40 km/h (25 mph).
The next signal is showing "stop" and is closer than 450 metres.[3]
The next signal could also be a stop light at the end of the line, or an End Board (S-tavla).[3]

The aspects may seem a little inverted, since a single green light means proceed 80, two green lights Proceed 40, caution and three green lights stands for Proceed 40, short route. In other words: more green means more cautiously. If there is a sign saying lower speed limit than 80, of course that is valid. The speed limits apply to trains without Automatic Train Control (ATC) equipment. ATC signalling typically allow higher speeds, up to 200 km/h (120 mph).

Two light signalling (Malmö and Stockholm city tunnels)[]

On some urban lines, such as the City Tunnel in Malmö and the Stockholm City Line, a simpler signal system is in use until ERTMS is fully implemented. The interpretation of the signals follow the ERTMS level 1 standard, but the actual look is national.
This system uses two light signals with blue number signs (instead of yellow/white in normal signalling) and can show the following aspects:

Signal Meaning
Svenska signal 2 stopp.png Stop The signal must not be passed without permission from the traffic control. During shunting operations permission to pass a home signal displaying stop may be given with a radio or with a dwarf signal.[6]
Svenska signal 2 kör.png Proceed 40
expect proceed 40
Authorises the driver to pass the signal at 40 km/h (25 mph) or at a higher speed given by the ATC or ERTMS system.
The next signal is displaying a proceed 40 aspect.[6]
Svenska signal 2 kör vänta stopp.gif Proceed 40
caution
Authorises the driver to pass the signal at 40 km/h (25 mph) or at a higher speed given by the ATC or ERTMS system.
The next signal is showing "stop"[6] and is closer than 450 metres (1,480 ft).

These signals should not be confused with normal main signals with two lights, which have yellow number signs, while the "Two light signals" shown here have blue ones.[6] The meaning is different to normal meanings of the signals, but if combined with a speed limit 40 (not valid for ATC) sign, the meanings are essentially the same.

Distant signals[]

Distant signals (försignaler) are informational signals used to give an advance warning about the next home signal. Distant signal are typically located 800 to 1,200 metres (2,600 to 3,900 ft) in advance of the home signal in question.[7]
The aspects a free-standing distant signal can display are:

Signal Meaning
Svenska signal vänta stopp-anim.gif Expect stop The next signal is displaying stop, so the driver must decrease speed and approach the next signal prepared to stop short of it.[8]
Svenska signal vänta kör-anim.gif Expect
Proceed 80
The next signal is displaying Proceed 80.[8]
Svenska signal vänta kör 40-anim.gif Expect
Proceed 40
The next signal is displaying proceed 40,[8] so the driver must decrease speed and approach the next signal prepared to pass it at a speed not exceeding 40 km/h (25 mph) or the speed shown on the ATC driver's display.

The signal indication is the same as for the combined aspects in the main signals.

Dwarf signals[]

Dwarf signals (dvärgsignaler) are used as shunting signals and can show the following aspects:

Signal Meaning
Raideopaste seis vanha.svg Stop The signal must not be passed without permission from the traffic control.[9]
Raideopaste aja vanha.svg Movement allowed Shunting allowed.
Points and derailers are in the right position. The track is free.[9]
Raideopaste aja varovasti.svg Movement allowed
Track not clear
Shunting allowed
Points and derailers are in the right position. The track is not free, or caution is needed.[9]
Raideopaste ei opasteita vanha.svg Movement allowed
Check points and clearance
Shunting allowed
The driver must manually check the position of points and derailers, and the track clearance. Points and derailers are often manual or put in shunting mode.[9]
A huvuddvärgsignal at Stockholm Central Station displaying "stop"

There are also types of dwarf signals, called "Main Dwarf signals" (Huvuddvärgsignal) used as stand-ins for home signals in stations with lot of shunting or where there are a lot of switches that needs a signal. In addition to the dwarf signal aspects given above, these signals also have a red light and two green ones (one for "proceed 40", the other for "proceed 80").[10]

Road crossing signals[]

Road crossing signals (Vägkorsningssignaler (V-signaler)) are used at road crossings. They tell the driver if the crossing is clear (lights flashing, bells ringing or, if available, gates are closed) They can show the following aspects

Signal Meaning
V-signal stopp 2.svg Stop before crossing
(Crossing not clear)
The road crossing is not secured. The train must stop before the crossing if possible.[11]
V-signal rörelse tillåten 2.svg Pass
(Crossing clear)
The road crossing is secured.[11]

The same aspects are also used at moveable bridges, but with another sign under the signal.[12]

Distant road crossing signal[]

Some road crossing signals have a distant signal (Vägkorsningsförsignal (V-försignal)), placed at a distance (usually not braking distance) from the road crossing signal.

Signal Meaning
V-försignal stopp 2-anim.gif Expect Stop before crossing
(Crossing not clear)
The road crossing is not secured. The train must stop before the crossing if possible.[13]
V-försignal rörelse tillåten 2.svg Expect Pass
(Crossing clear)
The road crossing is secured.[13]

The distant road crossing signal is nicknamed "skull" (döskalle).

Fail safe[]

Because the aspects are in reverse with more green lights meaning slower the aspects are not fail safe, so lamp proving is needed to prevent lamp failure giving a faster aspect.

Single and Double Green signals work the other way with Norwegian railway signalling and  [da] and it would be unsafe for drivers to cross the border, unless ATP were fitted. It is not permitted for Swedish drivers to drive into Norway and opposite where there is no ATC, unless extra education is taken (and before ATC was introduced everywhere in the other country except for a few kilometers from the border where crew change stations were located). This meant that freight trains Oslo–Narvik passed Hallsberg southeast of Oslo until the shortcut Kil–Ställdalen was upgraded to ATC in 2017.

ERTMS[]

European Rail Traffic Management System(ERTMS/ETCS) has been introduced on a few railways in Sweden. Mainly ERTMS level 2 is used, in which basically no light signals exist and all messages are shown on a display in the driver's places.

Two railways, Citybanan and Citytunneln use signalling according to ERTMS level 1, although ATC is still used there, not ERTMS (for now).

References[]

  • Trafikverkets trafikbestämmelser för järnväg (TTJ) Modul 3H: Signaler - System H (PDF) (in Swedish). Swedish Transport Administration (Trafikverket). 1 June 2017. Retrieved 3 November 2018.
  • Swedish signalling section of The Signal Page (TSP)
  • Signalfakta by Per Forsström (in Swedish) at the Wayback Machine (archived 27 May 2007)

Notes[]

  1. ^ Trafikverket 2017, p. 17.
  2. ^ a b c Trafikverket 2017, p. 19.
  3. ^ a b c d e f Trafikverket 2017, p. 18.
  4. ^ Trafikverket 2017, p. 118.
  5. ^ "Allmänna riktlinjer" (PDF). Bodens linjebok (in Swedish). Swedish Transport Administration. 30 July 2018. p. F1. Retrieved 4 November 2018.
  6. ^ a b c d Trafikverket 2017, p. 113.
  7. ^ Trafikverket 2017, p. 25.
  8. ^ a b c Trafikverket 2017, p. 26.
  9. ^ a b c d Trafikverket 2017, p. 34.
  10. ^ Trafikverket 2017, pp. 22–23.
  11. ^ a b Trafikverket 2017, p. 52.
  12. ^ Trafikverket 2017, p. 58.
  13. ^ a b Trafikverket 2017, p. 53.
Retrieved from ""