Taiba N'Diaye Wind Power Station

From Wikipedia, the free encyclopedia

Taiba N'Diaye Wind Power Station
CountrySenegal
LocationTaiba N'Diaye
Coordinates15°02′58″N 16°52′52″W / 15.04944°N 16.88111°W / 15.04944; -16.88111Coordinates: 15°02′58″N 16°52′52″W / 15.04944°N 16.88111°W / 15.04944; -16.88111
StatusOperational
Construction began2019
Commission date2020
Power generation
Nameplate capacity158.7 MW (212,800 hp)

Taiba N'Diaye Wind Power Station, (Parc Eolien Taiba N’Diaye (PETN) in French), is a 158.7 MW (212,800 hp) wind power plant in Senegal.[1] When completed, as expected in 2020, the power station will be the largest wind power station in West Africa.[2]

Location[]

The power station is located in the village of Taiba N'Diaye, approximately 90 kilometres (56 mi), northeast of the city of Dakar, the capital of Senegal.[2][3] The wind farm occupies 67 hectares (170 acres), in a semi-arid region of the country.[1]

Overview[]

The wind farm consists of 46 Vestas V126 turbines, each with rated capacity of 3.45MW. The turbines are being installed in five rows spread over 7 hectares (17 acres). Each turbine is mounted on a tubular steel tower measuring 117 metres (384 ft) high and weighing 313 tonnes (308 long tons; 345 short tons).[1]

Development[]

The power station is owned and operated by Lekela, a British renewable energy development company, focusing on Africa. The power generated will be sold to Senegal National Electricity Company (Senelec), for integration in the national electricity grid. Senelec will purchase the power for 20 years from plant commissioning, according to the power purchase agreement (PPA) for the Taiba N’Diaye wind power project, signed in 2013. Upon completion, the 158.7 megawatts generated, will increase Senegal's generation capacity by 15 percent.[1]

The electricity generated by each turbine will be transmitted through underground cables at 33kV, to the existing Tobene substation located 700 metres (2,300 ft), from the closest turbine of the wind farm. At the substation, the electricity will be stepped-up to 225kV. There will be no need for a high voltage transmission line. The Tobene substation will act as the project substation as well as the grid connection point.[1]

The estimated 400GWh generated annually at this power station is expected to supply an estimated 2 million customers and mitigate an estimated 300,000 tonnes of carbon dioxide emissions annually.[1][4]

Construction[]

In 2018, Vestas, a Danish wind turbine manufacturer, installer and servicer, was awarded the engineering, procurement, and construction (EPC) contract for the 46 turbines of this power station. The contract includes supply, transportation and installation of the wind turbines. In addition, it includes operations and maintenance for 20 years. The contract for the environmental and social impact assessment (ESIA) of the Taiba N’Diaye wind power project, was awarded to Ramboll.[1]

Construction, which was ongoing as of January 2020, is in three phases:[1]

Phase One
This involves the installation of 16 wind turbines, with generation capacity of 55.2 megawatts. This phase was completed in December 2019. This phase was commissioned in February 2020.[5]
Phase Two
This involves the installation of another 16 wind turbines, with generation capacity of 55.2 megawatts. This phase is ongoing and is expected to conclude in the 3rd quarter of 2020.
Phase Three
This involves the installation of the final 14 wind turbines, with generation capacity of 48.3 megawatts. This phase is expected to begin after the second phase and conclude in the 4th quarter of 2020.

Costs and funding[]

The Overseas Private Investment Corporation (OPIC), of the United States, committed $250 million in financing and $70 million in reinsurance for the wind power project, as early as September 2016. In August 2018, the Danish Export Credit Agency (EKF) also guaranteed an export loan facility for the project, worth €140 million (US$161 million). Political risk insurance was provided by the Multilateral Investment Guarantee Agency (MIGA). Power Africa of the United States Agency for International Development (USAID), also contributed to the development of this project.[1]

Energy storage[]

In May 2021, Lekela selected the Danish firm DNV, to carry out the feasibility studies for a 40 megawatt storage facility, on-site at its Taiba N'Diaye Wind Farm. The storage facility will comprise batteries housed in 47 shipping containers, each measuring 40 feet (12 m) long. The storage system is intended to "store 175 MWh of electricity, enough to stabilize the national grid of Senelec, the Senegalese national electricity company".[6]

See also[]

References[]

  1. ^ a b c d e f g h i NS Energy (January 2020). "Taiba N'Diaye Wind Farm". London: NS Energy. Retrieved 4 March 2020.
  2. ^ a b Mainstream Renewable Power (1 August 2019). "First Wind Turbines Rise From Taiba N'Diaye Plain". Kumasi, Ghana: Mainstream Renewable Power. Retrieved 4 March 2020.
  3. ^ Globefeed.com (4 March 2020). "Distance between Dakar, Senegal and Taiba Rhabe, Senegal". Globefeed.com. Retrieved 4 March 2020.
  4. ^ Linus Kemboi (30 July 2019). "First turbine erected at Taiba N'Diaye wind farm in Senegal". Nairobi: Construction Review Online. Retrieved 4 March 2020.
  5. ^ Nellie Peyton (24 February 2020). "Senegal opens West Africa's first big wind farm in push for renewables". London: Thomson Reuters Foundation. Retrieved 4 March 2020.
  6. ^ Jean Marie Takouleu (24 May 2021). "Senegal: Lekela bets on storage for Taiba N'Diaye wind farm". Paris, France: Afrik21.africa. Retrieved 25 May 2021.

External links[]

Retrieved from ""