Tseung Kwan O-Lam Tin Tunnel

From Wikipedia, the free encyclopedia
Tiu Keng Leng portal of Tseung Kwan O - Lam Tin Tunnel.

The Tseung Kwan O-Lam Tin Tunnel (Chinese: 將軍澳-藍田隧道) is a tunnel under construction located in Hong Kong, it began construction in 2016[1] and it is to be a part of the proposed Route 6. Originally expected to open in 2021, its opening has been delayed to 2022 due to the worldwide outbreak of COVID-19.[2][3][4]

See also[]

References[]

  1. ^ "Major Projects - Tseung Kwan O – Lam Tin Tunnel". www.cedd.gov.hk. Retrieved 2020-09-08.
  2. ^ rsbradbeer (2020-03-13). "New Lam Tin tunnel opening delayed till 2022". HONG KONG BUZZ. Retrieved 2020-09-07.
  3. ^ "Hong Kong government-owned tunnel tolls to be all-electronic by 2023". South China Morning Post. 2019-01-15. Retrieved 2020-09-07.
  4. ^ "Tseung Kwan O – Lam Tin Tunnel". Verdict Traffic. Retrieved 2020-09-07.