Uttar Pradesh Rajya Vidyut Utpadan Nigam

From Wikipedia, the free encyclopedia

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) was constituted on dated 25.08.1980 under the Companies' Act 1956 for construction of new thermal power projects in the state sector. On 14 January 2000, in accordance to U.P. State Electr Reforms Acts 1999 and operation of U.P. Electricity Reforms Transfer Scheme 2000, U.P. State Electricity Board (U.P.S.E.B.), till then responsible for generation, transmission and distribution of power within the state of Uttar Pradesh, was unbundled and operations of the state sector thermal power stations were handed over to UPRVUNL. Unchahar Thermal Power Station - 420 MW (2X210) & Tanda Thermal Power Station 440 MW (4X110) were transferred to NTPC in year 1992 & year 2000 respectively before unbundling of U.P. State Electricity Board (U.P.S.E.B.) into;

  1. Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL),
  2. Uttar Pradesh Power Corporation Limited (UPPCL),
  3. UP Power Transmission Corporation Limited (UPPTCL),
  4. UP Jal Vidyut Nigam Limited (UPJVNL).

Power plants[]

Past Transitions (6,810 MW)[]

Erstwhile Uttar Pradesh State Electricity Board (UPSEB) transferred its thermal power stations among others to NTPC Limited against payment overdue. These power stations are;

  • 1,550 MW Feroze Gandhi Unchahar Thermal Power Plant (Raebareli)
  • 440 MW Tanda Thermal Power Station (Ambedkarnagar)

Present Installations- (7133 MW)[]

At present,As of 2014 UPRVUNL is looking after generations of power of five thermal power plants located in different parts of Uttar Pradesh, with a total installed generation capacity of 4933 MW.

Though installed capacity is 5933 MW but UPRVUNL is not able to utilize its full capacity ever due poor maintenance, lack of funds, aging plants & frequent units tripping.

Future Expansions[]

Construction Stage- (7920 MW)[]

Planning Stage- (6600 MW)[]

  • Panki - 1x660 (660 MW)
  • Obra Stage C - 2x660 (1320 MW)
  • Meja Stage II - 2x660 (1320 MW)
  • Ghatampur Thermal Power Station - 3×660 (1980 MW) - a (In 49:51 equity JV with Neyveli Lignite Corporation Ltd.)

Human resources[]

As of 1 April 2020 UPRVUNL had 1475 executives and 4966 non-executives on its roll.[citation needed]

References[]

  1. ^ "BHEL commissions 250 MW Unit-5 at Parichha Thermal Power Project". sarkaritel.com. 29 May 2012. Archived from the original on 25 December 2013. Retrieved 27 June 2012.
  2. ^ "BHEL commissions 250 MW Unit at Harduaganj Thermal Power Project". sarkaritel.com. 7 June 2012. Archived from the original on 31 July 2012. Retrieved 27 June 2012.
  3. ^ http://www.sourcewatch.org/index.php/Jawaharpur_Thermal_Project
  4. ^ "Doosan Power clinches Rs 21,000 cr thermal power projects in UP". The Financial Express. 5 October 2016. Retrieved 20 June 2017.
  5. ^ "UPRVUNL". www.uprvunl.org. Retrieved 20 June 2017.
  6. ^ "News : Doosan Group | Doosan Corporation". www.doosan.com. Retrieved 20 June 2017.

External links[]

Retrieved from ""