Wenxin Forest Park metro station
Wenxin Forest Park 文心森林公園 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Nantun, Taichung Taiwan | ||||||||||
Operated by | |||||||||||
Line(s) |
| ||||||||||
Platforms | 2 side platforms | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Other information | |||||||||||
Station code | 112 | ||||||||||
History | |||||||||||
Opened | 25 April 2021[1] | ||||||||||
Services | |||||||||||
|
Wenxin Forest Park metro station | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese | 文心森林公園站 | ||||||||||
|
Wenxin Forest Park is a metro station on the Green Line operated by Taichung Metro in Nantun District, Taichung, Taiwan.[2]
The station name is taken from Wenxin Forest Park, a park that houses Fulfillment Amphitheater, which is located nearby.[3]
Station layout[]
4F | Crossover Level |
Platforms-connecting Overpass |
3F | ||
Side platform, doors will open on the right | ||
Track 1 | G Green Line: towards HSR Taichung Station (Nantun) | |
Track 2 | G Green Line: towards Beitun Main (Shui-an Temple) | |
Side platform, doors will open on the right | ||
Concourse | ||
Lobby, information desk, automatic ticket dispensing machines, one-way faregates | ||
2F | Mezzanine | Transitlink floor for stairs and escalators |
1F | Street Level |
Exit/Entrance |
References[]
- ^ 郝雪卿、蘇木春 (2020-11-15). "台中捷運綠線試營運16日起1個月免費搭 市民興奮終於等到了[影]". 中央通訊社.
- ^ "臺中捷運未來營運計畫" (PDF). Transportation Bureau of Taichung City (in Chinese (Taiwan)). Taichung Metro. May 8, 2017. Retrieved October 15, 2019.
- ^ "台中捷運綠線18個車站站名出爐 搭乘友善度為命名首要原則". Taichung City Government (in Chinese (Taiwan)). June 30, 2018. Retrieved October 16, 2019.
Coordinates: 24°08′44″N 120°38′48″E / 24.1455°N 120.6468°E
Categories:
- Taichung Metro
- Railway stations in Taichung
- Railway stations opened in 2020
- Taiwan rapid transit stubs