Wind power in Spain

From Wikipedia, the free encyclopedia

Aerial view of a wind farm in Spain
A wind farm in a mountainous area in Galicia, Spain

By year end 2015 Spain was the world's fifth biggest producer of wind power with 23,031 MW installed capacity (including 11 MW of wind-hydro capacity), providing 48,118 GWh of power and 19% of the country's total electricity production in that year.[1] In 2014, a record breaking year for renewable electricity production, wind power accounted for 20.2% of total electricity generation in Spain making it the second most important electricity source after nuclear power (22%) and ahead of coal power (16.5%).[2] In earlier periods wind energy covered 16% of the demand in 2010, 13.8% in 2009 and 11.5% in 2008.

Following the fallout from the financial crisis in 2008 and the dire straits of the Spanish economy in the subsequent period new installations of new wind turbines all but stagnated between 2012 and 2015 remaining at close to 23,000 MW installed capacity for the entire period. Whilst Spain put expansion on ice the other world leading countries continued to expand or accelerated new wind turbine installations and by 2015 India had moved ahead of Spain in total installations. As of end 2015 ranked 5th in the world by wind power installed capacity.[3]

On windy days, wind power generation has surpassed all other electricity sources in Spain; On 21 November 2015 at 4:50 am, 70.4% of the electricity consumed in Peninsular Spain was covered with wind power energy.[4] On 6 February 2013, wind power achieved an earlier record in electricity production, reaching an instantaneous peak of 17,056 MW and an hourly production of 16,918 MWh.[5] In November 2011 a capacity peak of 59% of power demand being generated by wind power was reached.[6] Power peaks of 14.960 GW were reached in November 2010,[7] and in November 2009, a wind storm caused wind farms to produce a peak of 53% of total electricity demand (11.546 GW).[8][9]

In 2009, the largest producer of wind power in Spain was Iberdrola, with 25.5% of capacity, followed by Acciona with 20.9% and NEO Energia (EDP Renewables) with 8.3%.[10]

Growth in installed capacity and generation[]

Wind power national installed capacity (MW) and generation 2006-2020
2006 2007 2008 2009 2010 2011 2012 2013 2014* 2015* 2016 2017 2018 2019 2020
Installed capacity (MW)[11][12][13][14] 11,416 13,664 16,133 18,860 19,706 21,166 22,757 23,003 23,031 23,031 23,066 23,092 23,484 25,704 27,759
Total generation (GWh)[15][16] 27,612 32,160 38,253 43,545 42,465 48,508 54,713 51,032 48,118 47,697 47,907 49,581 54,245 54,879
*Includes 11 MW of Wind-Hydro hybrid system and associated generation of 1 GWh in 2014, 9 GWh in 2015.

Regional trends[]

Installed windpower capacity (MW)
Rank Autonomous Region 2008[17] 2009[18] 2010[19] 2015[20]
1 Castile and León 3,334.04 3,882.72 4,803.82 5,560.01
2 Castile-La Mancha 3,415.61 3,669.61 3,709.19 3,806.54
3 Andalusia 1,794.99 2,840.07 2,979.33 3,337.73
4 Galicia 3,145.24 3,231.81 3,289.33 3,314.12
5 Aragon 1,749.31 1,753.81 1,764.01 1,893.31
6 Catalonia 420.44 524.54 851.41 1,267.05
7 Valencian Community 710.34 986.99 986.99 1,118.59
8 Navarre 958.77 961.77 968.37 1,003.92
9 Asturias 304.30 355.95 355.95 518.45
10 La Rioja 446.62 446.62 446.62 446.62
11 Murcia 152.31 152.31 189.91 261.96
12 Canary Islands 134.09 138.34 138.92 165.11
13 Basque Country 152.77 152.77 153.25 153.25
14 Cantabria 17.85 17.85 35.30 38.30
15 Balearic Islands 3.65 3.65 3.65 3.68
Spain total (MW) 16 740.32 19 148.80 20 676.05 22,988.00

A 2006 article stated that the intended wind energy capacity to be installed in the autonomous regions by 2010–2011 at 20,000 MW.[21]

Navarra[]

The US rating agency Standard & Poors, in a 2006 investigation of standard of living in Europe, ranked Navarre, whose primary source of renewable energy was wind power, uppermost among the 17 autonomous regions of Spain.[22] At that time Navarre sustained approximately 70 percent of its electricity needs from renewable energy sources, wind farms being used most extensively, and had a 900-megawatt capacity of installed wind power.

Navarre lacks thermal, nuclear, coal, oil, gas fields, or hefty hydro-electric power stations, but does possess considerable wind renewable resources, which the Government of Navarre pursued to drop its external energy dependence.[23] Navarre was entirely reliant on imported energy until wind-power development and utilization began progress in 1996.[22]

Galicia[]

In 2007 Galicia lead Spain in wind power development amongst the autonomous regions for the third consecutive year with an increase in wind power of 264 MW, succeeding Castilla La Mancha (which exceeded its development goal of 1,000MW), Castile and León, Aaragon and Navarre, and the remaining autonomous regions.[21]

Research[]

Largely concerned with advancing energy efficiency use in Spain, the Institute for Energy Saving and Diversification (IDAE) also seeks to expand renewable energy sources and energies.[21]

Research concerning the production of hydrogen from electrolysis of water by a wind farm began in 2004 at a newly installed laboratory in the Universidad Pública de Navarra under an agreement between Energía Hidroeléctrica de Navarra, Stuart Energy Systems of Canada, and Statkraft of Norway. The lab replicated the power generation environment of a wind farm and examined the effects of an electrolyzer.[24]

Concentrated research is occurring concerning wind measurement in the Albacete region at Higueruela.[21]

Wind power industry[]

A 2005 report showed the Spanish wind energy sector hosting the involvement of over 500 companies, with approximately 150 wind turbine production plants and their machinery across the Spanish regions.[25] The assets of the Spanish industry were noticed and acted upon by financial analysts, as United States Ernst and Young in 2005 ranked the wind market in Spain among the uppermost in its index of "long-term country attractiveness".[26] Including those indirectly employed in supplying components and services, the total number of jobs supported by Spain's wind industry had reached more than 30 000, and was estimated to double to 60 000 by 2010" (2005).[25]

Gamesa Eólica[]

Gamesa, based in the Basque Country is a large global wind turbine manufacturer with 13% share by installed power in 2005.[27] The company values the distinctive geographical setting of Spain as a benefit to Spanish companies competing in the global arena.[26] Gamesa Eólica currently operates plants in Spain, The US and China. It has projects in many other parts of the world including Egypt, Germany, Ireland, Italy, Japan, Korea, and Portugal.[26] Gamesa opened a manufacturing plant for wind turbine generator blades in Philadelphia, Pennsylvania in 2005, creating 500 part-time building and operations jobs and 236 permanent manufacturing jobs; the building, operation, and upkeep of Gamesa's wind farms, in conjunction with its two Philadelphia offices and production plant, formed about 1,000 jobs in the state over a five-year period.[28] The company seeks expansion into Greece, Taiwan, and the United Kingdom.[26]

Ecotècnia / Alstom Wind[]

Ecotècnia, established 1981, and by 2005 had 2.1% world market share by installed capacity,[29] with wind turbines in production of up to 1.6MW.[30] In 2009 the company was acquired by Alstom for €350million.[31] The company continued to develop wind turbines; a 3MW machine was installed in a commercial windfarm in 2009.[32] In 2010 the company was renamed Alstom Wind.[33] In 2011/2 the company developed a prototype 6MW permanent magnet gearless generator for offshore applications, in association with LM Wind Power and Converteam.[34]

Acciona Energy[]

Acciona Energy (Acciona Energía), the biggest global wind-park developer at the time, operated in Australia, Canada, France, Germany, Morocco, Spain, and the United States.[26] The company credited its success to its initial stages in Navarre during 1994. Its line of work involved wind-farm operation, turbine manufacture, and the development of wind-power plants, and the company intended to expand into China, Ireland, and the United Kingdom.[26]

Iberdrola[]

Iberdrola held functioning facilities in Brazil, France, Greece, Italy, Mexico, Portugal, Spain, the United States and the United Kingdom, and continued to develop wind farms in Europe and Latin America[26] https://www.nytimes.com/2008/02/23/business/23wind.html?em&ex=1203915600&en=6c53d1373b6e4cc3&ei=5087%0A .

As of 2008, Iberdrola plans to develop six offshore wind farm projects with a combined generation capacity of 3000 MW at locations off the coasts of the Spanish Atlantic provinces of Cadiz, Huelva and the Mediterranean province of Castellon.[35]

MTorres[]

MTorres initiated their activities in the Wing Energy field in 1998, with the launch of their newly developed Wind Turbine TWT-1.5/70, a 1500 KW variable-speed direct-drive multipole Wind Turbine with a full-power converter and a 70 meters rotor diameter.

Exports[]

The national Spanish wind energy industry began exporting its wind generators by forming contracts for the erection of wind farms in China, India, and Mexico, as well as Cuba, where work began in 1998 (2007). They also had contracts at a highly developed stage with Portugal, Turkey, Tunisia, Egypt, Brazil, and Argentina.[21]

The wind energy capacity for major companies in Spain was the following as of 2007: Gamesa Eólica, 3281 MW; Made, 803 MW; Neg Micon, 715 MW; Ecotècnia, 446 MW; G. Electric, 343 MW; Izar-Bonus, 317 MW; Desa & AWP, 121 MW; Enercon, 58 MW; Lagerwey, 38 MW; and Others, 113 MW (2007).[21]

Future development[]

Three factors will control the further progress of wind power development in Spain: the capability of the wind farms network to hold all the electricity harnessed by wind power, predominantly in off-peak times, the cost of energy, and the environmental effect that the abundance of wind farm development in Spain could turn out.[23] The Spanish wind power industry will be confronted with the following issues in the immediate future:[23]

  • formulating its development to be congruent with required supply agreements by the national electricity supply operator
  • guaranteeing that the installation of wind farms occurs with recognition of the environment
  • synchronizing wind power development of the 17 autonomous regions
  • trimming down the investment costs to acquire sufficient returns with declining energy prices in the upcoming years.

It is also noteworthy that the supportive Spanish policies for wind power development have resulted in severe competition for construction sites among major companies.[23] Political leaders in the autonomous communities have been frazzled by the numerous applications for wind farm construction.[23] Local possession of wind power is not present in Spain, but does not appear to take away from further development of wind power in Spain since a much smaller and weaker quantity of local anti-wind farm grid population inhabits the country.[36]

However, a further obstacle concerning wind power development needs to be tackled before Spain can achieve these ambitious objectives: construction of a central control center for all the Spanish wind farms, analogous to the control center used for traditional power plants.[26]

Opposition[]

With some exceptions, there has been little opposition to the installation of inland wind parks. However, the projects to build offshore parks have been more controversial.[37]

The proposal of building the biggest offshore wind power production facility in the world in southwestern Spain on the spot of the 1805 Battle of Trafalgar.[38] has been met with strong opposition from the towns in the coast of Cádiz, who fear for tourism and fisheries in the area.[39] There have also been complaints by the British, who claim that the area is a war grave and that any development of the area could destroy archaeological evidence of the historic battle.[38]

See also[]

References[]

  1. ^ "The Spanish Electricity System 2015, p29,p37" (PDF).
  2. ^ "The Spanish Electricity System 2015, p37".
  3. ^ http://www.wwindea.org/the-world-sets-new-wind-installations-record-637-gw-new-capacity-in-2015/
  4. ^ "The Spanish Electricity System 2015 p34" (PDF).
  5. ^ "Spain was in 2013 the first country where wind energy was the first source of electricity for an entire year". Spanish Wind Energy Association (AEE). Archived from the original on 2 April 2015. Retrieved 9 March 2015.
  6. ^ "La aportación de la energía eólica a la red marca un nuevo récord", economia.elpais.com (in Spanish), 7 November 2011
  7. ^ "La generación eólica alcanza casi los 15.000 MW en las horas centrales del día de ayer", www.ree.es (in Spanish), 10 November 2010
  8. ^ "IEA Wind Energy: Annual Report 2008" (PDF), www.ieawind.org, International Energy Agency, Chapter 27. Spain, pp.239-251, July 2009, ISBN 978-0-9786383-3-7, archived from the original (PDF) on 20 July 2011
  9. ^ Méndez, Rafael (9 November 2009), "La energía eólica supera por primera vez la mitad de la producción eléctrica", elpais.com (in Spanish)
  10. ^ "La eólica instaló en España 2.459 MW en 2009 pero este año se reducirán a cerca de 1.000 MW" (PDF), www.aeeolica.es (in Spanish), archived from the original (PDF) on 29 March 2010
  11. ^ "Red Electrica de Espana,, Statistical data of electrical system Nov 2017, Installed power Capacity".
  12. ^ Spain increased win power by 392 MW in 2018, adding a total of 23,484 MW installed wind energy
  13. ^ Wind energy in Spain
  14. ^ "Wind energy and solar power capacity in Spain". Reve. 5 February 2021. Retrieved 27 March 2021.
  15. ^ "Red Electrica de Espana,, Statistical data of electrical system Sept 2016, Balance of electrical energy".
  16. ^ "Electricity generation from wind power in spain". Statista. 28 January 2021. Retrieved 27 March 2021.
  17. ^ "Spanish Wind Energy Association (aae) statistics" (PDF). Archived from the original (PDF) on 18 March 2009.
  18. ^ "La eólica instaló en España 2.459 MW en 2009 pero este año se reducirán a cerca de 1.000 MW" (PDF). Spanish Wind Energy Association (AEE). Archived from the original (PDF) on 29 March 2010.
  19. ^ "Spanish Wind Energy Association (AAE) Map". Archived from the original on 12 April 2011.
  20. ^ "Spanish Wind Energy Association (AEE), Wind Map 2015". Archived from the original on 4 September 2014.
  21. ^ a b c d e f Montes, Germán Martínez; Prados Martín, Enrique; Ordóñez García, Javier (2007). "The current situation of wind energy in Spain". Renewable and Sustainable Energy Reviews. Elsevier. 11 (3): 467–481. doi:10.1016/j.rser.2005.03.002.
  22. ^ a b Stewart, Jules (2006). "Windmills of the Green Mind". Geographical. 78 (3): 56–58.
  23. ^ a b c d e Alberto, Miguel Ichaso (August 2000). "Wind power development in Spain, the model of Navarra" (PDF). DEWI Magazine. Retrieved 28 January 2007.[dead link]
  24. ^ "Spanish utility to produce H2 from wind power". Fuel Cells Bulletin: 5. October 2004.
  25. ^ a b "Spain's wind power industry on a roll". Renewable Energy Access. 24 August 2005. Archived from the original on 19 November 2007. Retrieved 28 January 2007.
  26. ^ a b c d e f g h Graber, Cynthia (14 December 2005). "Wind Power in Spain" (PDF). MIT Technology Review. Retrieved 16 January 2007.
  27. ^ M. Ragheb (28 February 2010), "Modern Wind Generators" (PDF), netfiles.uiuc.edu, Table 1. "Wind turbine manufacturers share of installed capacity as of 2005", archived from the original (PDF) on 18 December 2012, retrieved 26 March 2012
  28. ^ Curry, Jennifer (18 February 2005). "Spanish wind company to build plant in region". Pittsburgh Business Times. Retrieved 28 January 2007.
  29. ^ M. Ragheb (28 February 2010), "Modern Wind Generators" (PDF), netfiles.uiuc.edu, "Ecotècnia wind turbines", also Table 1. "Wind turbine manufacturers share of installed capacity as of 2005", archived from the original (PDF) on 18 December 2012, retrieved 26 March 2012
  30. ^ "List of principal installations carried out by Ecotècnia" (PDF), www.ecotecnia.com, 2007, archived from the original (PDF) on 29 November 2007
  31. ^ Sources:
  32. ^ "OnSite: The Ecotecnia 100 Launch", www.internationalresourcejournal.com, November–December 2009, archived from the original on 13 March 2016, retrieved 26 March 2012
  33. ^ "Company Overview of ALSTOM Wind, S.L.", investing.businessweek.com, Bloomberg LP
  34. ^ Haliade 150–6MW Offshore Wind Turbine (PDF), Alstom[permanent dead link]
  35. ^ Iberdrola Plans Six Offshore Wind Projects
  36. ^ Toke, D; et al. (2007). "Wind power development outcomes: How can we account for the differences?". Renewable and Sustainable Energy Reviews. Elsevier. 11 (3): 467–481. doi:10.1016/j.rser.2006.10.021.
  37. ^ Cohn, Laura; Vitzhum, Carlta; Ewing, Jack (11 July 2005). "Wind power has a head of steam". European Business.
  38. ^ a b "Grave developments for battle site". The Engineer: 6. 13 June 2003.
  39. ^ <Las eólicas preparan su inmersión [1]>

External links[]

Retrieved from ""