Xingguo–Quanzhou railway

From Wikipedia, the free encyclopedia
Xingguo–Quanzhou railway
Overview
StatusPartially open
TerminiXingguo
Quanzhou
Service
TypeHeavy rail
History
Opened30 September 2021 (Xingguo–Qingliu)
Technical
Line length461 km (286 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed160 km/h (99 mph)

The Xingguo–Quanzhou railway is a single-track railway line in China. The line is 461 kilometres (286 mi) long and has a design speed of 160 kilometres per hour (99 mph).[1][2][3]

History[]

The section between Xingguo and Qingliu opened on 30 September 2021.[4]

Stations[]

References[]

  1. ^ "厦门2.5小时动车直达宁化!兴泉铁路计划于今年9月28日开通" [Xiamen 2.5 hours to drive directly to Ninghua! The Xingquan Railway is scheduled to open on September 28 this year]. taihainet.com (in Chinese). 13 March 2021. Retrieved 13 March 2021.{{cite web}}: CS1 maint: url-status (link)
  2. ^ "兴国至宁化段可行性研究报告的批复" [Approval of the feasibility study report for the Ninghua to Quanzhou section]. National Development and Reform Commission (in Chinese). 12 June 2016. Retrieved 13 March 2021.{{cite web}}: CS1 maint: url-status (link)
  3. ^ "兴国至宁化段可行性研究报告的批复" [Approval of the feasibility study report for the Xingguo-Ninghua section]. National Development and Reform Commission (in Chinese). 29 August 2016. Retrieved 13 March 2021.{{cite web}}: CS1 maint: url-status (link)
  4. ^ "兴泉铁路兴国至清流段9月30日正式开通" [The Xingguo-Qingliu section of the Xingguo-Quanzhou railway opened on 30 September]. 高铁网 (in Chinese). 2021-10-01. Retrieved 2021-10-01.{{cite web}}: CS1 maint: url-status (link)
Retrieved from ""