AMBO pipeline

From Wikipedia, the free encyclopedia
AMBO pipeline
Location
CountryBulgaria
Republic of Macedonia
Albania
General directioneast-west
FromBurgas
ToVlorë
General information
TypeOil
OperatorAlbanian Macedonian Bulgarian Oil Corporation
Technical information
Length912 km (567 mi)
Maximum discharge750,000 barrels per day (119,000 m3/d)

AMBO pipeline was a planned oil pipeline from the Bulgarian Black Sea port of Burgas via the Republic of Macedonia to the Albanian Adriatic port of Vlorë.

History[]

The pipeline was proposed already in 1993. On 27 December 2004, prime-ministers of Albania, the Republic of Macedonia and Bulgaria signed the latest political declaration, followed by the memorandum of understanding between representatives of Albania, the Republic of Macedonia and Bulgaria and Ted Ferguson, the president and CEO of AMBO.[1] On 30 October 2006, Albania and the Republic of Macedonia signed a protocol to determinate the entrance points of the pipeline. The entrance point will be Stebleve village in Albania and Lakaica village in the Republic of Macedonia. A similar protocol between Bulgaria and the Republic of Macedonia was signed later in 2006.

On 31 January 2007, the Republic of Macedonia, Bulgaria and Albania signed a trilateral convention on the construction of the AMBO pipeline. This document was ratified by the Parliaments of all three countries and governed the construction, operation, and maintenance of the pipelines.[2]

Description[]

The aim of the 912-kilometre (567 mi) long pipeline was to bypass the Turkish Straits in transportation of Russian and Caspian oil. The pipeline was expected to cost about US$1.5 billion and it would have a capacity of 750,000 barrels per day (119,000 m3/d).[3] There would be four pump stations, two in Bulgaria and one each in the Republic of Macedonia and Albania, constructed along the route. A pre-front-end engineering and design study (FEED) was to be prepared by KBR. The pipeline was expected to be operational by 2011.[4]

Project company[]

The pipeline was to be built and operated by the US-registered Albanian Macedonian Bulgarian Oil Corporation (AMBO). The project was backed by the US government, who financed a feasibility study of pipeline.[5]

Alternative projects[]

Other pipeline projects were the Burgas-Alexandroupoli pipeline from Burgas to the Greek Aegean port Alexandroupoli, and the Pan-European Pipeline from Constanţa in Romania to Trieste in Italy. Compared with Burgas-Alexandroupoli pipeline, the AMBO pipeline would be longer and more expensive, but Vlorë (which is a sheltered, deep-water, all-weather port) could accommodate larger tankers and is more accessible than Alexandroupoli. Also, an oil spill in the Aegean would have a negative influence on Greece's tourism industry.[6]

See also[]

  • Burgas-Alexandroupoli pipeline
  • Pan-European Pipeline
  • Baku-Tbilisi-Ceyhan pipeline

References[]

  1. ^ "Go-ahead for Balkan oil pipeline". BBC News. 2004-12-28. Retrieved 2008-04-05.
  2. ^ Marina Stojanovska (2007-02-14). "AMBO pipeline deal clears another hurdle". Southeast European Times. Retrieved 2008-04-05.
  3. ^ Barry Wood (2004-12-30). "Balkan Oil Pipeline Agreement Moves Project Closer to Reality". Voice of America. Retrieved 2008-04-05.[permanent dead link]
  4. ^ Granitsas, Alkman (2007-04-26). "Official: Trans-Balkan Pipeline to Begin Ops by 2011". Downstream Today. Dow Jones Newswires. Retrieved 2008-04-05.
  5. ^ "AMBO Pipeline Moves Forward: Interview with Gligor Tashkovich". Balkananalysis.com. 2005-01-09. Archived from the original on 2006-11-05. Retrieved 2008-04-05.
  6. ^ "AMBO Trans-Balkan Pipeline Agreement Finally Signed". Balkananalysis.com. 2004-12-29. Archived from the original on 2008-01-20. Retrieved 2008-04-05.
Retrieved from ""