Allen Combined Cycle Plant

From Wikipedia, the free encyclopedia
Allen Combined Cycle Plant
CountryUnited States
LocationMemphis, Tennessee
Coordinates35°04′01″N 90°08′40″W / 35.06694°N 90.14444°W / 35.06694; -90.14444Coordinates: 35°04′01″N 90°08′40″W / 35.06694°N 90.14444°W / 35.06694; -90.14444
StatusOperational
Commission dateUnits 1–3: April, 2018
Owner(s)Tennessee Valley Authority
Operator(s)Tennessee Valley Authority
Thermal power station
Primary fuelNatural gas
Cooling sourceMemphis Light, Gas and Water
Power generation
Nameplate capacity1,100 MW

The Allen Combined Cycle Plant is a 1.1-gigawatt (1,100 MW) natural gas power plant located south of Memphis, Tennessee that began generating electricity in 2018. It is operated by Tennessee Valley Authority (TVA).

Background[]

TVA announced plans that the Allen Fossil Plant would be replaced with a $975 million natural gas plant in order to reduce emissions by 2018 set by a 2011 agreement with the Environmental Protection Agency (EPA).[1] The TVA had plans to utilize greywater from the nearby Maxson Wastewater Treatment Plant, but was unviable and expensive. Instead, the TVA drilled wells on the Memphis Sand Aquifer to use for the plant's cooling source.[2] During subsequent testing of groundwater and alluvial aquifer in the vicinity of the combined cycle plant, TVA discovered that water contained arsenic and lead which raised concerns that use of the on-site wells may lead to cross-contamination of the Memphis Sand aquifer. As a result, the use of wells on site was suspended and all water for the plant was supplied from the MLGW system.[3] As MLGW could not supply sufficient steady-state water flow to operate the combined cycle plant at full capacity in summer, TVA constructed four water storage tanks with 10 million gallon total capacity.[4] The Allen Combined Cycle Plant went into commercial operations on April 30, 2018.[5]

In addition to the natural gas plant, there is a 1 MW solar farm on site. The facility is also expected to burn biogas produced by the nearby Maxson wastewater treatment and biogas plant.[6]

See also[]

References[]

  1. ^ Dries, Bill (August 21, 2014). "TVA to Replace Allen Plant With Natural Gas". The Daily News. Retrieved April 4, 2018.
  2. ^ Dries, Bill (February 24, 2017). "TVA's Nearly $1B Natural Gas Plant 70 Percent Complete". The Daily News. Retrieved April 4, 2018.
  3. ^ "Congressman wants answers on toxins at TVA coal-fired plant". Chattanooga Times Free Press. The Associated Press. July 17, 2017. Retrieved April 4, 2018.
  4. ^ Charlier, Tom (March 7, 2018). "TVA probe finds 'connection' between Memphis Sand and contaminated aquifer". The Commercial Appeal. Retrieved April 4, 2018.
  5. ^ "TVA Closes Allen Fossil Plant, Opens Gas Replacement". Associated Press. Power Engineering. May 1, 2018. Retrieved May 2, 2018.
  6. ^ "Allen Combined-Cycle Power Plant, Tennessee". Power Technology. Retrieved April 4, 2018.

External links[]

Retrieved from ""