Bedok Reservoir MRT station

From Wikipedia, the free encyclopedia

 DT30 
Bedok Reservoir
勿洛蓄水池
பிடோக் ரெசவோர்
Bedok Reservoir
Mass Rapid Transit (MRT) station
DT30 Bedok Reservoir Art in Transit.jpg
Platform level of Bedok Reservoir station
Location371 Bedok North Avenue 3
Singapore 469724
Coordinates1°20′12″N 103°55′51″E / 1.3365418°N 103.9309029°E / 1.3365418; 103.9309029Coordinates: 1°20′12″N 103°55′51″E / 1.3365418°N 103.9309029°E / 1.3365418; 103.9309029
Operated bySBS Transit DTL (ComfortDelGro Corporation)
Line(s)
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
Platform levels1
Disabled accessYes
History
Opening21 October 2017; 4 years ago (2017-10-21)
ElectrifiedYes
Services
Preceding station   Mass Rapid Transit   Following station
towards Bukit Panjang
Downtown Line
towards Expo
Location
Singapore MRT/LRT system map
Singapore MRT/LRT system map
Bedok Reservoir
Bedok Reservoir in Singapore

Bedok Reservoir MRT station is an underground Mass Rapid Transit station on the Downtown Line in Bedok, Singapore, located at Bedok Reservoir Road, beside Bedok North Avenue 3. It serves residents living near Bedok Reservoir. The station also serves the students of Bedok Green Secondary School, Yu Neng Primary School, Fengshan Primary School and Red Swastika School.

History[]

Contract 927 for the design and construction of Bedok Reservoir MRT station and associated tunnels was awarded to Cooperativa Muratori & Cementisti - C.M.C di Ravenna at an estimated sum of S$196.46 million in July 2011.[1] Construction started in August 2011, except for the part of Bedok Reservoir Road whereby it was used to do sewage diversion works. This had been used for walkway realignment, but the remainder of construction started in September that year.

The station opened on 21 October 2017, as announced by the Land Transport Authority on 31 May that year.[2]

References[]

  1. ^ "LTA Awards Contracts for Tampines West and Bedok Reservoir Stations". Mynewsdesk. Retrieved 7 March 2020.
  2. ^ "Factsheet: Downtown Line 3 to Open on 21 October 2017 | Press Room | Land Transport Authority". www.lta.gov.sg. Retrieved 3 June 2017.

External links[]


Retrieved from ""