Chengdu–Zigong high-speed railway

From Wikipedia, the free encyclopedia
Chengdu–Zigong
high-speed railway
成自高铁
Overview
StatusUnder construction
TerminiChengdu East
Stations9
Service
Operator(s)China Railway High-speed
Technical
Line length176 km (109 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed250 km/h (155 mph) (Chengdu–Tianfu)
350 km/h (217 mph) (Tianfu–Zigong)
Route map

Legend
Chengdu East
(Right arrow Southern Sichuan ICR to Luzhou)
(Right arrow Southern Sichuan ICR to )

The Chengdu–Zigong high-speed railway is a high-speed railway currently under construction in China.[2] It runs between Chengdu and Zigong via Chengdu Tianfu International Airport.

History[]

The section from Chengdu to Tianfu airport was approved in October 2017.[3] The whole line was approved on 14 January 2019.

Stations[]

Station Name[4] Chinese Metro
transfers/connections
Chengdu East 成都东 Chengdu Metro 2 7
天府 Chengdu Metro 18
天府机场 Chengdu Metro 18
资阳西
资中西
威远
自贡东

References[]

  1. ^ "成都至自贡高速铁路可研报告获批 - 重大项目动态 - 自贡市政府网站集约化平台". www.zg.gov.cn. Retrieved 2020-10-29.
  2. ^ "全长195米 四川成自高铁首个隧道贯通_时政_中国西藏网". www.tibet.cn. Retrieved 2020-10-29.
  3. ^ "成都至自贡天府机场段铁路获批 设计时速350km/h - 四川网络广播电视台 - 四川广播电视台". www.sctv.com. Retrieved 2020-10-29.
  4. ^ "成自高铁天府机场下穿隧道主体贯通". 2021-01-05.


Retrieved from ""