Dazhushan Tunnel

From Wikipedia, the free encyclopedia

Coordinates: 25°15′46″N 99°15′08″E / 25.2627993°N 99.2522202°E / 25.2627993; 99.2522202 The Dazhushan Tunnel (大柱山隧道) is a 14.484 km (9.0 mi) railway tunnel in Baoshan, Yunnan, China as part of the Dali–Ruili railway. Construction of the tunnel began in August 2008 and was carried out by the (中铁一局). Its construction was expected to take five years, but because of extreme geological conditions along its alignment, completion took place on 28 April 2020, after 12 years of construction. As another tunnel, Gaoligongshan Tunnel, along the railway line is still under construction, it will not enter service until 2022.

The justification of this tunnel is the geopolitical importance of the Dali–Ruili railway. While there are already gas and oil pipelines linking the oil refinery in Yunnan to the port of Bay of Bengal in Myanmar, a direct railway link between China and Myanmar is seen as a doubly secure means for China to access the Bay of Bengal in case the territorial disputes in the South China Sea are resolved unfavorably to China.

References[]

  • "11年!"最难掘进隧道"大柱山隧道平导贯通". Xinhua Net. 26 June 2019. Retrieved 27 August 2020.
  • "奋战12年,这条隧道终于通了!". Xinhuabaoye. 28 April 2020. Retrieved 27 August 2020.


Retrieved from ""