Dubai Towers Doha

From Wikipedia, the free encyclopedia
Dubai Towers Doha
أبراج دبي الدوحة
Dubai Towers Doha.jpg
Rendering of the building
Dubai Towers Doha is located in Doha
Dubai Towers Doha
Location within Doha
General information
StatusOn hold
TypeHotel, office, residential, restaurant, retail
Architectural styleFuturism, glass
LocationCorniche Street, West Bay, Doha, Qatar
Coordinates25°18′52″N 51°31′20″E / 25.31444°N 51.52222°E / 25.31444; 51.52222Coordinates: 25°18′52″N 51°31′20″E / 25.31444°N 51.52222°E / 25.31444; 51.52222
Construction started18 June 2007
Estimated completion2030
Opening2029
Cost273.5 million USD[citation needed]
Height
Antenna spire437.1 m (1,434 ft) [1]
Roof400.0 m (1,312.3 ft)
Technical details
Floor count90
Design and construction
ArchitectRMJM Architect of Record  : Diwan Al Emara
DeveloperSama Dubai
(Dubai International Properties)
Main contractorAl Habtoor-Al Jaber Joint Venture

Dubai Towers - Doha is a super-tall skyscraper with a roof height of 400 m (1,300 ft) (Spire height 437 m (1,434 ft)) under construction in Doha, Qatar. The estimated cost of Dubai Towers - Doha is 2.3 billion Qatari Riyal (US$620 million)[citation needed]. When completed, the structure will be the tallest building in Qatar.

Located in the West Bay district of Doha, next to the Doha Corniche, the 90-story multi-use tower is being developed by Sama Dubai, formerly known as Dubai International Properties, the international real estate investment and development arm of Dubai Holding.

The project has been contracted to a joint venture between Al-Habtoor and Al Jaber,[2] while Robert Matthew Johnson Marshall (RMJM) are the architects and engineering consultants. The cost consultants are Hanscomb Consultants Inc. The Project Management consultant is .

When completed the mixed use tower will include a 7,000 m2 (75,000 sq ft) retail area, 13 floors comprising a 225-room five-star hotel, 29 floors of office space and 31 floors containing 226 luxury apartments and three super luxury penthouses.

The project is now severely delayed as a result of the financial crash in Dubai. Investors in the property have been advised that the building is 9 months behind schedule. By May 2010 only 29 of the proposed 84 stories had been built. At that building rate this would suggest at least another 11-year delay until completion.

Dubai towers under construction (October 2011)

References[]

  1. ^ Jump up to: a b "Building Profile". Emporis.
  2. ^ Jump up to: a b "Contractors". Search dot com.
  3. ^ "Year of Completion". World Arab. Archived from the original on 2009-11-19.

External links[]


Retrieved from ""