Fatou station

From Wikipedia, the free encyclopedia

Fatou

垡头
Beijing Subway
Platform of Fatou Station (20191202165807).jpg
Platform
LocationSouth Fatou Road (垡头南路)
Chaoyang District, Beijing
China
Coordinates39°51′51″N 116°30′50″E / 39.864082°N 116.513817°E / 39.864082; 116.513817Coordinates: 39°51′51″N 116°30′50″E / 39.864082°N 116.513817°E / 39.864082; 116.513817
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 7
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
Disabled accessYes
History
OpenedDecember 30, 2018
Services
Preceding station   Beijing Subway   Following station
towards Beijing West railway station
Line 7
Location
Fatou is located in central Beijing
Fatou
Fatou
Location in central Beijing

Fatou station (simplified Chinese: 垡头站; traditional Chinese: 垡頭站; pinyin: Fátóu Zhàn) is a station on Line 7 of the Beijing Subway. It was opened on December 30, 2018.[1]

The adjacent stations are Happy Valley to the northwest and Shuanghe to the east.

The station is located in Chaoyang District outside the Southeast 4th Ring Road along South Fatou Road (垡头南路).[2]

History[]

The station's platforms were completed on 28 December 2014, along with the rest of the initial section of Line 7, but, due to the need to clear space at the surface for station entrances, the station has remained unopened and trains pass through without stopping at Fatou.[3] In November 2017, the Beijing Municipal Commission of Housing and Urban Rural Development, and the Beijing Daily, both stated it expected the station to be operational by the end of 2018.[4][5] It was opened on December 30, 2018.[6]

Station Layout[]

The station has an underground island platform.

Exits[]

There are 2 exits, lettered A and C. Exit C is accessible.

References[]

  1. ^ http://news.ynet.com/2018/12/30/1600990t70.html
  2. ^ "Archived copy" 北京市规划委员会关于轨道交通7号线沿线车站站名命名预案的公示书 (in Chinese). Beijing Municipal Planning Committee (北京市规划委员会). 29 August 2013. Archived from the original on 23 September 2015. Retrieved 15 October 2013.CS1 maint: archived copy as title (link)
  3. ^ Zheng Yujia (郑羽佳); Huang Hailei (黄海蕾) (16 May 2014). 地铁垡头站因拆迁问题将甩站. Beijing Times. Archived from the original on 9 May 2015. Retrieved 15 June 2014.
  4. ^ 7号线垡头站明年有望启用. bjrb.bjd.com.cn (in Chinese). 14 November 2017.
  5. ^ 北京向东看 (12 November 2017). 北京地铁7号线垡头站动工!预计2018年年底通车 (in Chinese). 163.com. Retrieved 29 June 2018.
  6. ^ http://news.ynet.com/2018/12/30/1600990t70.html

External links[]


Retrieved from ""